Loading…
Loading…
11,275 results • Best match
Dalgaon-Lankapara road in stretches from 3.00km. to 4.00km., 7.50km. to 8.00km., 10.00km. to 10.50km., 12.00km. to 12.50km. and 13.50km. to 14.00km. Repairing of potholes in stretches by PC an SC under Alipurduar Highway Division
Pre-monsoon repairing and maintenance work of Kanthalberia Hotor Road from 0.0 km to 2.35 km (except existing 650m PHE restoration area), under South 24-Parganas Highway Division in the Dist of South 24-Parganas
Sahapur Parbatpur Road from 3.00 kmp to 4.00 kmp Patch Repairing work in different stretches under BHSD-II of Burdwan South Highway Division, P.W (Roads) Dte in the district of Purba Bardhaman during 2026-2027.
Bardhamaneswar Temple Road from 0.00 kmp to 0.800 km Patch Repairing work in different stretches under BHSD-II of Burdwan South Highway Division, P.W (Roads) Dte in the district of Purba Bardhaman during 2026-2027.
Emergent potholes repairing work of Chetra Chekapdera Bazar (13th Kmp of Dinhata Balarampur Road) to Nazirhat Bazar road via Balakura New Bazar, for curve and culvert approach portions in stretch under Cooch Behar Highway Division
Haringhata Gaighata Road from Ch 11 km to Ch 15 km Potholes repairing in patches work under KHSD of Nadia Highway Division No.II PW Roads Dte in the district of Nadia during the year 26-27
Voisvita to Soldighi Road from 2.09 Km to 7.72 Km, Surfacing Work( Except chainage 3.820 km to 4.470 km and 5.595 km to 5.705 km) under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur.
Mahishadal Geonkhali Road from 1.00 km to 6.00 km, repairing work by repairing pothole, 20 mm PC and SC in patches under Tamluk Highway Division in the district of Purba Medinipur during the year 2023-2024
Restoration of road flanks damaged for laying different dia. MS water pipe by HDD method for KMDA deptt. From Dhanpota to Sapaigachi (1.5km) and Nilarpur to Sandhipur (5.10km) under Hooghly Highway DivisionNo-II P.W (Roads) Directorate.
Bishnupur-Patrasayer Road from 22.00 kmp to 28.00 kmp, Restoration work of both side of road due to laying of pipe lines by Bankura Division, PHE Dte. under Bankura Highway Division in the District of Bankura
Patun Bridge at 17th Km of Daulatpur-Harirampur-Dehaband road, Concrete Lining Work of both end approach slope, under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur, during the year 2021-22.(2nd Call)
Providing FHTC(functional household tap connection ) by retrofitting under Jalswapno with utility shifting of water pipeline in connection to the work under Nadia Highway Division -I PWD(Roads) Dte. along Dharmada-Muragachha road3.00 kmp to 6.00km
Construction of underground reservoir and connecting water pipe line for DMC water supply at Ahana Inspection Bunglow at city center, Durgapur under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman, 2023-24
Sahudangi-Belacoba road from 0.00kmp to 5.00kmp (Ambari Bazar) for emergent repairing by WBM, BM and PCSC (in stretches) and allied works under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2020-2021.
Construction of Temporary pandel and wooden platform at Ramjan Nagar Bus Buffer zone on the occasion of Gangasagar Mela - 2026 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Parganas.
Inspection Road along Lower Bagjola Cannel from 0.00Kmp. (Kestopur on K.N.I. Avenue ) to 5.70Kmp. (Jatragachi more), strengthening work under Barasat Highway Division No.I of P.W.(Roads) Directorate in the District of North 24 Parganas under RIDF
Chhatna Susunia Kustholia Road, at CH 13.91 Km Chandra Dhapali, Construction of Vented Causeway cum temporary Diversion Road besides the existing damaged Brick Masonry Arch type Bridge under Bankura Highway Division in the district of Bankura.
Repairing of Janubasan Alinansaira Road from 0.00 km to 4.80 km in patches by repairing potholes, 20mm PC and SC etc. under Tamluk Highway Division in the district of Purba Medinipur during the year 2022-2023.
Simlapal Bhutsahar road from Ch 2.00 Kmp to Ch 8.00 Kmp and Ch 11.00 Kmp to Ch 12.00 kmp in stretches, Maintenance and Repairing work under Bankura Highway Division in the district of Bankura.2nd Call
Janatahat-Bhulki Road from 2.00 Km to 5.00 Km and 7.00 Km to 10.00 km in stretches Repairing of potholes and patches correction of carriageway under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Garidhura Mirik Simanabusty Road from 45.00 kmp to 50.00 kmp for pre and post monsoon work, drain, culvert clearance and jungle cutting under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Gobardhanpur Itaberia Road from 0.00 kmm to 1.170 km, repairing work by pothole repairing, 20 mm PC and SC in patches under Tamluk Highway Division in the district of Purba Medinipur during the year 2023 2024
Birsa Bridge over River Dulung and Raghunath Murmu Bridge over river Bansi Khal at 19th Km. and 23rd Km. of Hatigeria-Kultikri - Rohini - Rogra Road, Rehabilitation work under Jhargram Highway Division, in the district of Jhargram
Bodra Deuli Bazar Road from 0.00kmp to 11.00 kmp, Emergent Restoration work in patches of damaged caused due to cyclone YAAS under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-03)
Construction of Temporary barricading at different stretches of Pakhirala Buffer Zone, Chakfuldubi Buffer Zone, Krishnagar Buffer Zone and Harinbari Buffer Zone at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Pgs.
Midnapore - Anandanagar - Chandra - Dheruaghat Road from 7.00 kmp to 24.00 kmp patch repairing work under Midnapore Highway Division in the District of Paschim Medinipur in the year 2021-2022 (Ch. To Non-Plan/ Flood damage repair)
Potholes repairing work of Tufanganj-Dhalpal-Bhatibari road from 9.5 km to 15.64 kmp (in stretches) under Cooch Behar Highway Division in the district of Cooch Behar during the year 2019-20.(Under Non Plan Head)
2 cell R.C.C Box Bridge at 3.090 km and culverts at Ch. 1.77 km, 0.70 km 12.887 km of Nalhati Rajgram Road (SH 7) Rehabilitation work under Birbhum Highway Division-I in the District of Birbhum
Maynaguri Railway Station to Maynaguri Town Road (Upto NH 31)-Dismantling of steel joist pile Bridge used for diversion over river Jarda during construction of RCC Bridge under Jalpaiguri Highway Division during the year 2024-25.
Peshoke Mungpoo Road Emergent Restoration of disastrous Landslide at Ch. 9.700 km, 9.800 km, 10.05 km and 15.300 Km in Hill side under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26.
Maintenance and repair to Midnapore Anandanagar Chandra Dheruaghat Road from 7.00kmp to 12.00kmp in stretches by WBM, Repairing potholes, 20mm P.C. and Seal coat type B under Midnapore Highway Division in the district of Paschim Medinipur.
Sarenga Bridge approach at Hirapur to Nalpur Station Road within 0.00 Kmp to 1.70 Km, Restoration Work of PHED cutting for laying Pipe Line under Howrah Highway Division, P.W (Roads) Dte. in the district of Howrah
2 Nos. 3 m X 3 m Single cell box culvert at 3rd kmp and 5th kmp of Mahinagar- Debpur Road, Construction, replacing old damaged culverts under Asansol Highway Division in the district of Paschim Bardhaman.
Garidhura-Mirik-Simanabusty Road Emergent restoration works of khade side slip at 10.7 Km and 9.9 Km, damaged due to heavy rain under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23
Repairing of Haridaspur-Srirampur Road from 0.00 km to 3.00 km in patches by repairing potholes, 20mm PC and SC etc. under Tamluk Highway Division in the district of Purba Medinipur during the year 2022-2023.
Link Road to Harishchandrapur Health Center from 0.00 km to 0.73 km, Surfacing Work and 1.13 km to 1.58 km, Widening and Strengthening Work under Malda Highway Division in the district of Malda. Project ID PD232411822S000
Sankarpur - Nibhujibazar Road, from 0.00 Km to 7.42 Km, Emergent Repairing Work in Stretches for a length of 3700 m under Burdwan South Highway Division in the District of Purba Bardhaman during the year 2025 - 2026
Construction of Temporary Vehicle Turning Zone near Kapil Muni ICDS Centre of Gangasagar Mela-2026 at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela - 2026.
Chandrakona-Goaltore-Sarenga-Simlighat Road from 19.50 km to 29.00 kmp, Patch repair work under Midnapore Highway Division in the District of Paschim Medinipur in the year 2021-2022 (Ch. To Non-Plan/ Flood damage repair)
Annual Maintenance of Existing Computer, Printer, Photocopier, Plotter and UPS for Office of the Superintending Engineer, Bridge Planning Circle, for Office of the Executive Engineer, Southern Highway Design Division I and Office of the Executive Eng
Bhalukhope Byepass Road Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from 0.00 kmp to 3.65 km under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Kolkata-Basanti Road (SH-3A), from 23.00 kmp to 29.00 kmp, Emergent repairing and maintenance by patch DBM and BC at different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Repairing of Potholes by Brick stiching from Ch. 22.70 Km to 23.30 Km in stretches of Kalaberia - Pirakata - Dhansole - Lalgarh Road under Midnapore Highway Division in the district of Paschim Medinipur during the your 2026-27.
CONSTRUCTION OF PAVER BLOCK ROAD FROM H/O ARBIND KUJUR TO H/O RAJENDRA ORAON TOWARDS ASIAN HIGHWAY .(150M) UNDER SAKOAJHORA-I GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/014/222/0001)
Construction of Temporary Pathway for Pilgrims movement near Kachuberia Bus Stand at Sagar Island during Gangasagar Mela 2025 under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela - 2025
Construction of Pedestrian Under Pass by the Box Jacking Technique at Dum Dum Park Crossing of KNI Avenue (VIP Road) under Barasat Highway Division No. I in the district of North 24 Parganas.---- Electrical installation work.
Restoration of road flanks at Ch. 0.75km to ch.1.17 km of Upperchengmari T.G. PWD Road to Nepali line Bhutan Border road under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2022-2023.
Emergent cutting of jungle along side the carriageway of Mathabhanga-Cooch Behar (SH-16) road from 64.00km to 69.00km, 71.50km to 76.00km, 77.00km to 82.00km and 83.00km to 93.00km (in stretches) under Cooch Behar Highway Division
Kalna-Baidyapur Road from 6.0 km to 6.90 km and 10.0 km to 12.0 km except Mastic and Culvert portion (in stretches) maintenance and repairing work under Burdwan South Highway Division during the year 2025-26
Chhatna Susunia Kustholia Road at CH 13.91 Km Chandra Dhapali Construction of Vented Causeway cum temporary Diversion Road besides the existing damaged Brick Masonry Arch type Bridge under Bankura Highway Division in the district of Bankura