Loading…
Loading…
11,275 results • Best match
Construction of drain from Mahalandi Mondalpara culvert to East side Maller Dhar both side of PWD Road ............ within 4.00 Km to 5.50 Km on Jibanti-Sherpur Road under Murshidabad Highway Division No.II in the District of Murshidabad
Construction of Vented causeway including both side approach Road for Diversion of Sub-Sided Box Bridge over River Dulung (Dulung Bridge) at 12th km of Lodhasuli-Rogra Road under Jhargram Highway Division in the District of Jhargram.
Construction of Storm Water Drain Box Drain of Bhalukhope Bye Pass road from Ch. 0.10 Km to 1.00 Km, for mending up damages occur due to heavy rainfall under Darjeeling Highway Division in the District of Darjeeling
Akra-Santoshpur-Taratala Road (length of 1400 mtr) Restoration work for lying 700mm Dia Water Pipe line by KMC area under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(Deposit Work)(SL-01)
Plassey Betai Road from 9.00 kmp. to 30.00 kmp., Emergent Potholes repair including 20 mm. P.C. and S.C. under Nadia Highway Division No. I in the District of Nadia during the year 2020 2021 (Pre Monsoon work)
Permanent restroration work on damaged approach road alongwith approach slab of Raghunath Murmu Bridge over river Banshi Khal at 22.410 km. of Hatigeria-Kultikri- Rohini- Rogra Road (MDR)under Jhargram Highway Division in the district of Jhargram,
Tajpur to Goagaon Road from 0.00 km to 2.50 km and 3.50 Km to 5.50 Km in stretches Reparing of pothole and patch correction of carriageway under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Bishnupur Sonamukhi Rangamati Road at CH 13th Km construction of one single barrel of 1000 mm Dia. Hume pipe culvert by replacing the existing damaged Slab Culvert under Bankura Highway Division in the district Bankura 2nd Call.
Providing of road safety measures i.e bituminous speed breakers, signage boards, road marking, road stud on Fatapukur to Gadra road chainage 1.70km to 2.58km and 4.00km to 9.70km under Jalpaiguri Highway Division during the year 2024-25.
Peshok Mungpoo Road-Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from Ch.11.00 kmp to 17.00 km under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Re-Construction of Wing wall of Tailara Bridge-II at 15.80 km (R/S) of Raina-Damuniya Road under Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2024-25
Emergent Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 13.50 Km to 13.80 Km and 14.30 Km to 14.65 Km (in stretches) under Murshidabad Highway Division No.II in the District of Murshidabad during 2022-23
Replacement of existing Narrow Bridge at 1.985 Km of Jaugram-Khanpur Road by Triple Cell (3 m x 3 m) RCC Box Bridge under Burdwan South Highway Division in the district of Purba Bardhaman. (Plan) (2nd Call)
Bandhgora, Panchkahania, Athangi, Bagdiha and Jhilli Box Bridge at 6th Km, 9th Km, 13th Km, 15th Km and 16th Km respectively of Gopiballavpur - Hatibari Road (MDR), Rehabilitation work under Jhargram Highway Division in the district of Jhargram.
Jhorer more to Khuribhanga Pumping Station Road from 5.00 to 6.00kmp, Emergent Restoration work in patches damaged caused due to cyclone YAAS under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-05)
Bishnupur Patrasayer Road, from Ch 11.00 kmp to Ch 14.00 kmp and Ch 26.00 kmp to Ch 29.00 kmp in stretches temporary restoration work due to excessive rainfall under Bankura Highway Division in the district of Bankura.
Repairing of Doulatpur Health Centre Road from 0.70 km to 5.50 km in patches by repairing potholes, 20mm PC and SC etc. under Tamluk Highway Division in the district of Purba Medinipur during the year 2022 2023.
Emergent Maintenance work for repairing of Pawnan Onchai Road from 1.20 Km. to 2.70 Km., Saiya Pawnan Road from 0.50 Km. to 2.00 Km in patches under Hooghly Highway Division No. I in the District of Hooghly.
Digha Foreshore Road from 84.835 km to 86.335 km, Pedestrain Guard Railing work at road side raised footpath near Jagannath Dham Digha under Tamluk Highway Division in the district of Purba Medinipur. Project ID - PD252641771S000. 2ND CALL
Emergent Restoration at different stretches of Jibanmondalhat Sonatikerihat Road from 3.95 Kmp. to 5.30 Kmp. due to damages caused by recent Cyclone Bulbul under Diamond Harbour Highway Division in the District of South 24 Parganas 2nd Call.
Biprit Solpara Road from 15.00 kmp to 19.00 kmp and 22.00 kmp to 25.00 kmp Patch repairing of bituminous surface works and protective works in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Dhantala Biprit road from 1.00 kmp to 5.00 kmp and 8.00 kmp to 11.00 kmp Patch repairing of bituminous surface works and protective works in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 12.50 Kmp to 12.75 Km by mending potholes and depressions by stitching picked jhama bricks in stretches under Murshidabad Highway Division No.II during the year 2020-21
Peshoke-Mungpoo Road Restoration and Repair of distress bottom slab of culvert repair damaged drops structure restoration of land slide affected zone and reconstruction of the broken parapet wall at Ch. 3.010 KM under Darjeeling Highway Division
Narghat-Gopinathpur Road via Chowkhali Bazar from 5.00 km to 10.00 km, Protective work by Double layer Eucalyptus bullah pilling in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024-2025
Repairing of Rautari to Taraparajalpai Road from 6.00 Kmp to 10.00 km in patches by repairing potholes, 20mm PC and SC etc. under Tamluk Highway Division in the district of Purba Medinipur during the year 2023-2024
Sanjua Maheshtala Road from 0.300km to 1.40km, 1.60km to 2.20km, 2.50km to 3.85km, 5.10km to 6.80km, Repairing and Maintenance in patches and in stretches under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Geotechnical Investigation Report for Rehabilatation or New Construction of Existing Abutment along with its adjacent span and construction of New Bridge at Khukurdaha at 9.900 KM of Panskura -Ghatal Road under Midnapore Highway Division in the distr
Salmara Bazar (11th km of Burirhat Salmara road) to Balarampur Road via Saktir Bazar, from 0.00 km to 5.25 km, Surfacing and allied works, under Coochbehar Highway Division in the district of Coochbehar. Project ID PD 232405205S000.
Dighirpar Muchisa Road from 0.00 Km to 0.080 Km for the work of strengthening by paver block of damaged Mastic Zone in the district of South 24 Parganas under Diamond Harbour Highway Division P. W. (Roads) Dte
Sanirmore-Kadamtala Road from 0.00 kmp to 1.130 km, 2.190 km to 2.820km , from 3.215 km to 3.855 km, Emergent restoration work in patches, under South 24 Parganas Highway Division in the District of South 24 Parganas
Hazrahat Nayarhat Road from 1.50 Kmp to 5.40 Kmp and Santanubabur More to Giladnaga Road from 4.00 km to 7.77 km urgent Patch Repairing work in various strtches, under Coochbehar Highway Division in the District of Coochbehar.
Kolkata-Basanti Road at 0.70km, 25.40 km, and 27th km, Restoration of protective work, Traffic safety measures, damaged due to road accidents under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-07)
Church Gate-Chandur More Road from 1.00kmp to 2.042km Restoration of damages caused by laying of Water Supply Pipe Line under Alipore Division, PHE under South 24-Parganas Highway Division in the Dist of South 24 Pgs
Engagement of 11 nos. Security Personnel on purely temporary basis of different categories for guarding, at Sarak Bhaban Office Compound, Bolpur Inspection Bungalow and Stack yard etc. under the control of the Executive Engineer, Birbhum Highway Di
Construction of 1.00m Span Slab Culvert by replacing Damaged culvert at ch. 1.650 Km and 1.550 Km of the Road from Burdwan Katwa Road to Village Sunur under Bhatar Highway Sub Division No.II of BNHD (2ND CALL)
Repairing and Restoration work in connection to PHE-Pipe Laying alongside with construction of trenches by damaging hard shoulder, Edging of bituminous surfacing at 0.000 kmp to 3.550 kmp of Bokpotaghat-Ichanagari Road under Hooghly Highway Division
Bridge over river JARDA at 3rd KM of Jalpesh Temple from Maynaguri Changrabandha Road new construction of RCC Bridge by replacement of old and weak steel joist bridge under Jalpaiguri Highway Division in the district of Jalpaiguri.
Trimohini-Dhanhati (Anil Sarkar House) to Maniko More road via ITI college from 0.00 kmp to 5.54 km, patch repairing work, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2023-24.
Deulty Panitras Road from 0.30 Kmp to 6.00 Kmp Link Road to Sarat Chandra Kuthi from 0.00 Kmp to 0.60 Kmp and Kalyanpur Dipamalita Road from 0.00 Kmp to 1.46 kmp, surfacing work under Howrah Highway Division
Fulia Township Road from 0.00 km to 3.20 km, Strengthening works including construction of 04(four) nos. Box culvert by replacing of 04 nos old culvert under Nadia Highway Division No. II, in the District of Nadia.
Development of Integrated Traffic Management system to enhance logistic efficiency for Chanditala Seakhala Champadanga Road SH-15 at 2.5 km from Chanditala for the Commercial Vehicles under Hooghly Highway Division No. I, in the State of WB
2 Nos. 2mX2m Box Culverts at Ch. 70.60 km and 83.20 km of Kolkata basanti Road, Construction work in place of damaged HP culvrts under South 24 Parganas Highway Division in the district of South 24 Parganas
RCC Box Culvert 3m X 3m at 14.95km. of Falakata-Madarihat Road, Construction work by replacing damaged Hume Pipe Culvert under Alipurduar Highway Division in the District of Alipurduar during the year 2021-22. Project ID PD212245863S000
Jamtala -Kishorimohanpur Road via Petkulchand Road from 0.00 Kmp to 15.700 Kmp Strengthening work and from 15.700 kmp to 31.950 kmp, widening and Strengthening work under Diamond Harbour Highway Division, in the district of South 24 Parganas.
Repair and Renovation including some addition and alteration works of existing four storied building and premises of Midnapur Housing Complex at Narampur under Midnapur Highway Division in the district of Paschim Medinipur. During the year 2018-19.
Digha Inspection Bungalow Old Building, maintenance work by exterior and interior painting with four nos toilet block renovating and other allied works under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025.
Emergent patch repairing work of different stretches at Domohani-Churulia-Ajoyghat road from 3.50km to 5.20km by providing patching potholes. repairing potholes and 20mm premixed carpeting work of Asansol Highway Sub-Division under AHD FY 2024-25
Matigara Kurseong Road, Emergent repair of bituminous road, Guard wall and other allied works in stretches portion from 20.00 kmp to 28.20 kmp necessitated due to heavy rainfall under Darjeeling Highway Division during the year 2020-21.
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 12.00 Km to 12.50 Km and 16.75 Km to 17.25 Km by mending potholes and ...... (in stretches) under Murshidabad Highway Division No.II during the year 2021-22.