Loading…
Loading…
11,275 results • Best match
Bishnupur Sonamukhi Rangamati Road at CH 15th Km construction of one double barrel of 1000 mm Dia. Hume pipe culvert by replacing the existing damaged Slab Culvert under Bankura Highway Division in the district Bankura 2nd Call
Haraharitala-Champahati Road from 0.00 kmp to 0.70km, 2.00 kmp to 4.00 kmp and 7.00 to 8.00 kmp, Repair work in patches under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-03)
Santipur Guptipara Ferry Ghat Road form Ch. 0.00 Kmp to Ch. 1.15 Km -Strengthening work and form Ch. 1.15 Km to Ch.2.29 Km -Widening Strengthening Work Under Nadia Highway Division-II, in the District of Nadia.
Supply of Godrej make office furniture for the new constructed office of the Chief Engineer, (WZ) P.W(Roads)Dte. Durgapur, under control of the Executive Engineer Asansol Highway Division, P.W.( Roads ) Directorate during the year 2022-23
Construction of 20(twenty) capacity passenger shelter at Mathabhanga College more at 57th km of Changrabandha-Mathabhanga-Coochbehar Road (SH-16)under Cooch Behar Highway Division in the District of Cooch Behar during the year 2018-19.
Hura-Puncha Road, from 1.00 Kmp to 5.00 Kmp and 10.00 Kmp to 12.00 Kmp, Maintenance and repair work by providing premix carpet and seal coat in patches under Purulia Highway Division in the district of Purulia.
Emergent work for repairing of Mogra-Sultangacha road from 2.00 kmp. to 3.50 km, and Kapastikri-Meria road from 1.00 kmp to 2.50 km. (in patches) under Hooghly Highway Division No. I in the District of Hooghly.
Protection of embankment at the approach of culvert from 20.975 Km to 21.025 km and 21.00 kmp to 21.200 km of Hura-Puncha Road by providing drainage system under Purulia Highway Division in the District of Purulia.
Emergent temporary repairing work in different stretches of Huslurdanga-Sustirhat road portion from 1.00kmp to 5.00kmp with potholes, premix carpet and seal coat under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2022-202
Construction of Temporary pandel and wooden platform at Gopal Nagar Ground Bus Buffer zone on the occasion of Gangasagar Mela - 2023 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Pargana
Damda Chakoltore-Daradi-Kenda-Manbazar Road from 24.00 kmp to 46.00 kmp in stretches due to damaged caused by laying of OFC cable (Airtel Bharati Ltd.) under Purulia Highway Division in the District of Purulia. (2nd Call)
Mungpoo Rambhibazar Road-Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from Ch. 6.00 kmp to 12.00 km under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Emergent Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 1.00 Km to 1.30 Km and 7.50 Km to 7.85 Km (in stretches) under Murshidabad Highway Division No.II in the District of Murshidabad during 2022-23
Emergent repair to Goaltore - Hoomgarh Road (0.78 km to 8.66 kmp) by repairing pothols, 20 mm thick open graded premix carpet and sealing under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 6.50 Km to 7.00 Km and 8.00 Km to 8.40 Km by mending potholes and ..... (in stretches) under Murshidabad Highway Division No.II during the year 2021-22.
Single Cell 3.0 m X 3.0 m Box Culvert at Ch-2.70 km of Batikar Kurmitha Road, Reconstruction of Box Culvert in place of existing Damaged Culvert under Birbhum Highway Division - II, in the District of Birbhum
Advance Supply of readymade Bituminous Potholes patching mix using medium curing Cutback (MC-800) Bitumen and crushed stone aggregate as an instant bituminous mix for all Weather at different stackyard under Arambagh Highway Sub-division under Hooghl
Engagement of one Luxury Taxi-Bharat Stage-III/IV/VI Motor Cab with Non- Air-Conditioned diesel engine on daily hiring charge for the office use of the Executive Engineer, South Western Highway Circle, P.W.(Roads) Directorate
Manbazar-Bandwan-Kuilapal Road from 35.00 Kmp to 43.00 Kmp and Barabazar-Bandwan Road from 0.00 Kmp to 3.70 Km, Maintenance and Repair work in stretches (by providing potholes, Seal Coat Type-B etc.) under Manbazar Highway
Hiring of a noise free Generator set 15KV within the office Premises on daily hire charge basis normal electric supply at the office of the Executive Engineer, Hooghly Highway Division No. I and II, P.W. Roads etc.
Topographical survey for preparation of DPR of proposed work Widening and strengthening of Bishnupur-Beliaghata road from 00.000km to 15.200 km under Barasat Highway Division No. I, P.W.(Roads) Directorate in the district of North 24 Parganas
Emergent temporary repairing work in different stretches of Khalaigram Khetifulbari road portion from 5.00 km to 5.60 km with WBM, potholes, premix carpet and seal coat under Jalpaiguri Highway Division in the district of Jalpaiguri 25-26.
Culvert at 5.236 Km, 5.381 Km, 5.465 Km, 5.973 Km, 6.432 Km, 7.834 Km, 8.464 Km, 8.856 Km of Sindri-Manbazar Road, Construction by replacing existing damaged culverts under Purulia Highway Division in the district of Purulia.
Dudhkundi - Manikpara - Sardiha Rly Station Road From 0.000 Kmp to 6.00 Kmp, With Link from Manikpara to Bombay Road (Balibhasa) 0.000 Kmp to 2.250 Kmp, Widening and Strengthening under Jhargram Highway Division in the district of Jhargram.
Periodical Cleaning works of office compound and over head tank of Barasat Highway Division - II P.W Roads D in the district of 24 parganas North from 1st April 2026 30th September 2026 during the year 2026 2027
Pre monsoon and during monsoon of Mirzapur_Kaligram_Kusumgram_Nadanghat_Samudragarh Road from 0kmp to 2kmp,17kmp to 19kmp in patches under Burdwan Highway Sub Divn No_I of Burdwan South Hway Divn, P.W. Rds Dte.In the Dist. of Burdwan during 20_21
Bungkulung soureni Road Clearing Drain, CD structures , Drops and Guides, mixed slip clearance and Jungle cutting from Ch. 0.00 kmp to 7.50 km under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Laying of Distribution pipe line required for widening and strengthening of Dharsha to Belpahari Road taken up by the Jhargram Highway Division PW_Roads Dte. within Binpur_II Block under Belpahari Water Supply Scheme within Jhargram Division PHE Dte.
Supply of Diesel Generator set (25.00) K.V. for emergency lighting arrangement during the period of load-shedding at Office of the Assistant Engineer Krishnagar Highway Sub-Division No.-I P.W.(Roads) Directorate including stack yard, divisional works
4 cell box culvert at 8th km and 2 Cell box culvert at 7th km of Dewanhat Balarampur road, repair and rehabilitation work under Cooch Behar Highway Division in the District of Cooch Behar .(Under Plan Head)
Patsimulia-Bouldah Road from 0.00 Kmp to 6.00 KM. Patch repairing work in stretches with bituminous potholes repair 20mm P.C and Seal Coat etc. under Barasat Highway Division No. II in the district of North 24 Parganas
Recovery and Restoration of Lalbazar Paglimari Road from 0.00 kmp to 4.50 kmp under Coochbehar Highway Division in the district of Cooch Behar for mending up damages occurred due to heavy rainfall/flood like situation (2nd Call).
Emergent patch repair work and mainteance of existing road surface of Netaji Subhas Chandra Bose International Airport from Gate No.- 1.00 to Gate No.- 2.50 within Airport boundary wall under Barasat Highway Division I, P.W. (Roads) Dte
Mungpoo Rambhibazar road clearing Darin, CD structures, Drops and Guides mixed slip clearacne and jungle cutting from ch. 0.00 kmp to 5.85 km under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27.
Patch Repairing work of Madhyamgram Main Road including Vidhyasagar Sarani from Ch. 0.00 km to 2.00 km under Barasat Bridge Sub-Division of Barasat Highway Division-I, P.W.(Roads) Dte. In the district of North 24 Parganas.
Surfacing work of Gopgram More to Jibantitala Mayer Mandir Road from Ch. 0.00 Kmp to 0.20 Km and ch. 0.60 Km to ch. 0.835 Kmp in stretches under Murshidabad Highway Division No.II during the year 2025-26
Flank protection and dressing chilchalling and allied work of Chilakhana-Natabari road 7.9km Charaljani Nimai Chowpathi to Jaigir Chilakhana Bazaar road 0.00km to 2.17km under Cooch Behar Highway Sub-Division III in the district of Cooch Behar.
Peshok Mungpoo Road Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from Ch.6.20 km to 10.80 km under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24
Mohisgote-Chatta Bazar Road from 3.60 kmp to 5.60km, Restoration of damages caused for laying of High Tension Cable (HDD method) by CESC Limited under South 24 Parganas Highway Division in the District of South 24 Parganas.
Guma Rajibpur Balisha Road from 2.00 km to 6.00 km . Emergent Pot Holes repairing work in stretches , including Dresssing Chilchalling of road flank,Maintenance of earthen shoulder hard shoulder under Habra Highway Sub Division under Barasat Hi
Gazole - Bomongola Road Flood damaged repairing work of shoulder from 2.70 km to 2.72 km, 9.45 km to 9.50 km and 9.70 km to 9.82 km in stretches under Malda Highway Division in the district of Malda.
Mungpoo Rambhibazar Road Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from Ch. 6.10 kmp to 12.00 km under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Pawnan Ochai Road from 2.800 km to 3.000 km Restoration Estimate due to cause of damage for Underground Water Supply Pipeline laying executed by Public Health Engineering Directorate within Polba Dadpur Block under Hooghly Highway Division No.I
Garidhura Mirik Simanabusty Road from ch. 44.00 kmp to ch. 50.00 kmp, Construction of side drain, concrete shoulder with thorough repair of parapet walls and other protective works under Darjeeling Highway Division in the district of Darjeeling
Keorapukur-Julpia Road from 6.00 km to 11.77 km, Repair and restoration works in stretches of damage caused due to cyclone YAAS under South 24 Parganas Highway Division in the District of South 24 Pgs(3rd Call).
Providing round the clock security Services by deploying 14 Fourteen Nos. unarmed Security Guards per day for guarding at different offices Stack yards Temporary Rest shed under the control of Jhargram Highway Division, P.W. Roads Directorate in
Construction of temporary bus stand with brick paved road at Hardwood point under Kakdwip Hw. Sub-Divn. of Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2022 Spot - 3
Providing Security Personnel at different office premises, stack yards and Bungalows under Burdwan South Highway Division, P.W(Roads) Directorate in the district of Purba Burdwan for guarding round the clock for a period of 1(one) year.
Erection of Steel Railing on the Median along with painting and other allied work at Kranti Bazar on Odlabari-Kranti Road from Ch. 23.00 km to 25.00 km under Jalpaiguri Highway Division in the district of Jalpaiguri
Protection and Repair work of road embankment on the damaged portion of Rajabhatkhawa-Jaigaon Road between Ch. 23.00kmp. to 24.00kmp. under Alipurduar Highway Division P.W.(R)Dte. in the district of Alipurduar during the year 2025-26.