Loading…
Loading…
11,275 results • Best match
Karala Bridge at Ch. 4.49 km on Paramunda More to Gajoldoba Barrage Road Repair of Expansion Joint Beam AND other minor repair work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2026-2027
Peshoke Mungpoo Road, clearing Drain, CD structures, Drops and Guides mixed slip clearance and jungle cutting from ch. 11.10 kmp to 17.00 km under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27
Bhalukhope Byepass road, clearing Drain, CD structures, Drops and Guides mixed slip clearance and jungle cutting from ch. 0.00 kmp to 3.65 km under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27.
Peshoke Mungpoo Road, clearing Drain, CD structures, Drops and Guides mixed slip clearance and jungle cutting from ch. 6.10 km to 10.95 km under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27.
Hiring of Diesel / CNG Motor Cab (preferably Luxury Taxi / Luxury Car),for office use as Inspection Vehicle in the Office of the Assistant Engineer, Burdwan Highway Sub Division - I, P.W (Roads) Directorate, Aftab Club Compound, Purba Bardhaman
Repair of 5 nos bridge i.e. Banki Bridge at ch. 5.840 Km of Gokarna-Chiruti Road......and Bridge at ch. 21.62 Km of Kuli-Moregram Road under Murshibad Highway Division No II during the year 2026-27
Ghaturmore-Chakdah Road , from 0.00 kmp to 1.00kmp, 4.00kmp to 6.00kmp and 7.00 kmp to 8.50km, Emergent repair , Restoration work in patches under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-01)
Peshoke Mungpoo Road Clearing Drain, CD structures, Drops and Guides, mixed slip clearance and jungle cutting from Ch.0.00 kmp to 6.00 km under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24
Special Maintenance Repair at Office of the Executive Engineer, North 24 Pgs W/S Division-I office premises, Block-B(2nd Floor), Highway Plaza, KMDA Housing Complex, Barrackpore, P.O. Sewli- Telinipara, District-North 24 Pgs, Pin-700121
Performing Health Assessment and Submission of report of Nudipur Bridge at 592 km of G.T. Road (SH-13) under Burdwan South Highway Division, P.W.(Roads) Directorate In the district of Purba Bardhaman during the year 2026-27
Garidhura-Mirik-Simanabusty Road at Ch. 14.30 Km to Ch. 15.60 Km Protective Work Landslide for mending up damaged occures due heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27
Restoration of flank by dressing chilchalling and mending potholes......of Ramnagar-Bazarshaw-Chowrigacha-Khagraghat Road from 7.00 Kmp to 8.00 Kmp and 10.00 Kmp to 28.40 Kmp under Murshidabad Highway Division No.II during the year 2026-27
Repairing pot-holes and making up small depressions of any road belongs to Murshidabad Highway Division No.II....including the cost of carrying materials (from Berhampore / Kandi / Salar), laying uniformly and ramming properly during the year 2026-27
Tamluk Moyna Road from 2.00 km to 4.00 km and 12.00 km to 15.50 km, emergent rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Egra Ramnagar Road from 0.00 km to 1.50 km and 9.00 Km to 15.00 Km, emergent rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Emergent Potholes repairing work on connecting road from 9th km of Coochbehar Baneswar Alipurduar road to Kaljani Health Centre Road at Khapaidanga Nayarhat road from 4.00 km to 5.00 km in stretches under Cooch Behar Highway Division
Surjopur Dhamua Road, from 0.00 km to 1.00 km and 5.00 km to 6.80 km emergent rain damage patches repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Anandapur(Ruby) to Natunhat Road via Kheadah-Boynala Pratapnagar-Harapur Road, from 5.00 km to 7.00 km,12.00 km to 15.00 km emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division.
Kolkata Basanti road (SH3A) from 8.00 km to 29.00 km, Clearing and grubbing road land, Maintenance of earth shoulder and restoration of rain cuts under South 24 Parganas Highway Division in the District of South 24 Parganas.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI, New Delhi under Nadia Highway Division No-I. PWRD
Gobardhanpur Itaberia Road from 0.00 km to 3.00 km and 9.00 km to 10.00 km, emergant rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Repairing and Maintenance work of Debra Sabang Road from 0.400 Km. to 4.00 Km. and 6.00 Km. to 12.00 Km. (in stretches) under Midnapore Highway Division in the District of Paschim Medinipur during the year 2026 - 2027.
Emergent Rain Damage Repairing of potholes and Patch Repairing of Rampur Chakulia Road from 0.00 km to 4.00 km 5.00 km to 7.00 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage Repairing of potholes and Patch Repairing of Dhantala Biprit Road from 10.20 km to 11.75 km 11.85 km to 12.55 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Gokarna-Chiruti Road from Ch. 0.0 Km to Ch. 9.10 Km.......under Murshidabad Highway Division No.II during the year 2026-27
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Purandapur-Hizole Road from Ch. 1.5 Km to Ch. 5.5 Km under Murshidabad Highway Division No.II during the year 2026-27
Protection against slipping out of flank earth by providing U.C. Bullah Pilling at Chainage 3.515 Km and at 6.670 Km of Kashinagar Roypur Ferryghat Road under Diamond Harbour Highway Division in the District of South 24-Parganas.
Patch Repairing Work of Roypur Ferryghat-Patharpratima Road at different locations from Ch. 11.000 Kmp to Ch.23.100 Kmp under Diamond Harbour Highway Division in the district of South 24 Parganas for the Financial Year 2025-26.
Providing Concrete Pathway within the Compound Premises of Karbala Stack-yard along-with Protecting Pond Sides by Bullah Pilling and Cleaning the Stack-yard under LKPHS of DH Highway Division, in the District of South 24 Pgs.
Periodical Cleaning works of office compound and over head tank of Barasat Highway Division II, P.W Roads D in the district of 24 parganas North from 1st October 2026 15th March 2027 during the year 2026 2027
Patch repair works on Link Road to Niramoy TB Sanitoriam 0.00 Kmp to 1.20 Km and Sahapur Dubrajpur Road from 5.80 Km to 10.80 Km in stretches under Birbhum Highway Division-II. in the District of Birbhum
Patch repairing work of Dhola-Milan More road at different locations from Ch 0.000 Kmp to Ch 5.000 Kmp under Diamond Harbour Highway Division in the district of South 24 Parganas in the financial year 2026-27.
Begunkodar-Arsha Road, Clearing and grubbing and restoration work of scoured embankment from 2.00 Kmp to 5.00 Kmp 6.00 Kmp to 9.00 Kmp, 10.00 Kmp to 11.00 Kmp under Purulia Highway Division in the district of Purulia.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road technology for sustainable road maintenance approved by CSIR-CRRI New Delhi under Alipurduar Highway Division, P.W.(R)Dte.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR-CRRI, New Delhi, under Jhargram Highway Division, PW (Roads) Directora
Repair of Khanyan Itachuna Road from 0.00 kmp. To 3.70 kmp. (Except Mastic portion 1.50 km, in different chainages) of C.H.S.D under Hooghly Highway Division No.II in the district of Hooghly during the year of 2026-2027
Magrajpur Terapekhya Road from 0.00 km to 1.00 km and 3.00 Km to 5.00 Km, emergent rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Emergent Repairing or maintenance of damaged road surface of Jayrambati Kamarpukur Road in between ch.2.50km to 4.70 km (in stretches effectively 2.20 km) with WMM, MSS,Repairing Potholes etc. under Arambagh Highway Sub Division of HHD-I
Bashudevpur Railway crossing to Dakbanglow Road from 0.00 kmp. to 0.60 Km., 2.30 km. to 2.80 km., and 4.50 km. to 5.66 km. patch repairing work (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
Construction of temporary brick paved vehicle turning area and parking zone for pilgrim busses at Harwood Point under Diamond Harbour Highway Division, P.W.(Roads) Dte. in the district of South 24 Parganas for ensuring GS Mela Spot - 5
Hatigeria Kultikri Rohini Rogra Road MDR from 0.00 kmp to 3.00 kmp 6.00 kmp to 8.00 kmp and 11.00 kmp to 13.00 kmp Repairing of road surface in patches under Jhargram Highway Division in the district of Jhargram.
Jungle cutting and installation of necessary road safety Sign Boards alongside Changrabandha Mathabhanga Cooch Behar road (SH16) from 70.00 Km to 93.00 km(In stretchs) under CoochBehar Highway Division in the district of Cooch Behar during 2024-25.
Providing Round the clock security arrangement by deploying 14 (Fourteen) Nos. unarmed Security Guard for 24 (Twenty-Four) hours per day at Different Stack-yard/Offices under Barasat Highway Division-I in the district of North 24 Parganas.
Emergent Patch Repair work of Kalaberia - Pirakata - Dhansole - Lalgarh Road from 15.000 Kmp to 18.00 Kmp and 21.000 Kmp to 25.00 Kmp (In stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Maintenance and Patch Repairing of Potholes of Kandi-Bharatpur-Salar Road from 0.00 Kmp to 5.0 Km, 6.0 Km to 9.544 Km and 10.664 Km to 12.996 Km under Murshidabad Highway Division No.II during the year 2025-26
Kolkata-Basanti Road from 43.50 to 43.60 Km, 44.65 to 44.85 Km, Rehabilitation of the Existing Rigid Pavement along with Surface over laying under South 24 Pgs. Highway Division in the Dist. of North 24 Parganas.(SL-01)
Repairing work at Furfura Sarif - Jangipara road (Nilerpur - Sandhipur road from chainage 2.00 kmp to 3.50 km) in patches by repairing potholes, 20mm P.C. seal coat of Serampore Bridge Hwy. Sub-Division under Hooghly Highway Division No.-II
Road Marking Paints to Kachuberia Gangasagar Road, Road No. 5 and Chayergheri to Sridham via Chemaguri Road instretches at sagar Island under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G.S Mela 2022.
Kochamari High School to Vecrapul Netaji Club Road via Dinhata II BDO Office connected to 12 km of Dinhata Sahebganj Road from 0.00 km to 6.036 km, Surfacing Work under Coochbehar Highway Division in the district of Coochbehar.
Bituminous Patch Repairing and Allied works of Connecting Road from 9th km of Coochbehar-Baneswar-Alipurduar Road to Kaljani Health Centre Road at Khapaidanga Nayarhat Road from 1.00 Kmp to 4.00 Kmp in stretches under Coochbehar Highway Division