Loading…
Loading…
11,277 results • Best match
3) Emergent Patch Repairing Work with Wet Mix Macadam, Bituminous Profile Corrective Course, MSS (Type B etc.) in various stretches from 0.1 Kmp to 16.024 Kmp. of Chanditala Seakhala Champadanga Road, under Serampore Highway Sub-Division of Hooghly
Digha Foreshore Road from 82.30 Km to 83.75 Km, temporary patch repairing works by repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025
Nabanda Joykrishnapur Road, Hume Pipe Culvert at CH 5.10 Km construction of one single barrel of 1800 mm Dia. Hume pipe culvert by replacing the existing damaged Hume Pipe Culvert under Bankura Highway Division in the district Bankura.
Egra Bajkul Road from ch. 0.00 km to 8.00 km emergent repair by brick stitching and road marking over the rumble strip, humps, installation of cautionary sign board under Tamluk Highway Division in the District of Purba Medinipur
Tamluk Moyna Road from 4.50 km to 7.00 km, temporary patch repairing work by potholes repairing, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025
(I) Hura-Puncha Road at 18.110 Km, Restoration work of damaged Culvert and (II) Barabazar-Bandwan Road at ch. 2.00 Kmp, Construction of H. P. (1000 mm Dia) Culvert under Purulia Highway Division in the District of Purulia.
Kashinagar Roypur Ferryghat Road from 0.000 Kmp to 13.00 kmp excluding existing Maistic Asphalt Rigid pavement Portion and Ch 6.00 kmp to 7.50 Km Strengtheniung work under Diamond Harbour Highway Division in the district of South 24 Paraganas
Hansgeria-Dakshin Gumai Health Center Road from 0.00km to1.50 km, temporary patch repairing work by potholes repairing, 20 mm PC and SC and other allied works in stretches under Tamluk Highway Division in the district of Purba Medinipur.
Egra Bazar Road from 0.000 Km to 0.750 Km, temporary patch repairing work by repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2025 2026.
Digha Foreshore Road from 82.30 km to 83.80 km, temporary patch repairing work by repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025
Supplying fitting and fixing vertical blind for window covering in the office room ( Room no-311, 312, 313, 314, 317, 318) under Southern Highway Planning Division -I P.W.(Roads) Directorate. Bhabani Bhawan office complex, Alipore, Kolkata-700027 du
Carrying out Falling Weight Deflectometer test along with Preparation of DPR in connection with Gangajalghati Saltora Road from CH 0.0 km to CH 22.00 km Widening and Strengthening work under Bankura Highway Division in the dist of Bankura.
Carrying out Falling Weight Deflectometer test along with Preparation of Detailed Project Report in connection with Saltora Murulia Road from CH 0.00 km to CH 12.70 km strengthening work under Bankura Highway Division in the district of Bankura.
Patch Repair of Sagardighi to NH-34 Road from Ch. 0.30 Km to 1.30 Km in stretches and dressing and Chilchaling from Ch. 0.00 Kmp to 6.70 Kmp under Murshidabad Highway Division No.II during the year 2025-26
Lakshmikantapur Dhola Road, Strengthening Work by Paver Block in different Stretches of damaged Mastic Zones(1500 mtr) in the district of South 24 Parganas under Diamond Harbour highway Division, PW(Roads) Dte. (Materials supply by the agency) Projec
Emergent embankment repairing and protection work at 6th km of Connecting road from 780.50 km of NH-31 to Pundibari-Sonapur road (at Pundibari Bazar) (in stretches) under Cooch Behar Highway Division in the district of Cooch Behar.
Repairing of Panskura Durgachak Road from 25.45 km to 28.00 km in patches by repairing potholes, 20mm PC and SC etc. under Tamluk Highway Division in the district of Purba Medinipur during the year 2022 2023. 2nd Call
Hiring of 1 no. Inspection Vehicle on Daily basis for the use of the Executive Engineer, Alipurduar Highway Division, P.W.(Roads)Dte., Alipurduar (BS-IV an Above Diesel Engine/Petrol Engine. Rate should be quoted including incidental charges
Advance Supply of readymade Bituminous Potholes patching mix using medium curing Cutback (MC-800) Bitumen and crushed stone aggregate as an instant bituminous mix for all Weather at different stackyard under Hooghly Highway Sub-division under HHD-I
Widening and Strengthening to 2-lane with paved shoulder from 100.00 kmp to 125.07 km of Ramjibanpur-Palita-Palitpur-Natunhat Road (SH-7) under Burdwan North Highway Division in the district of Purba Bardhaman, West Bengal under CRIF
Development of Integrated Traffic Management system to enhance logistic efficiency for Ahmedpur - Kirnahar - Ramjibanpur Road (SH-6) (at Ch. 25 . 450 kmp from Ahmedpur) for the Commercial Vehicles Birbhum Highway Division No. II in the state of W.B.
Restoration work at Badu Bazar area (Chainage-5.00 Km.) on Chandnagar Badu road Replace of Existing damaged Bituminous surface by Interlocking Cement Concrete Block Pavement (ICBP) under Barasat Highway Divison I in the district of Noth 24 parganas
Construction of new Box Culvert ( 2.0m x 2.0m ) at 1.90 km of Sabang Mohar Road under Medinipur Highway Division , P.W (Roads) Directorate in the district of Paschim Medinipur in the year 2025-2026. Ch. To SDMF / Non-Plan
Replacement of existing damaged culvert at Ch. 1.500 km to double vent NP4 Hume Pipe culvert of Jhapetapur - Kasijora under Midnapore Highway Division in the District of Paschim Medinipur in the year 2021-2022 (Ch. To Non-Plan)
MAYNAGURI RS TO MAYNAGURI CHANGRABANDHA ROAD CLEARING OF JUNGLE FROM FLANK AND REPAIRING OF DAMAGE LANK FROM 10.00KM TO 13.85 KM UNDER ASSISTANT ENGINEER, JALPAIGURI HIGHWAY SUB DIVISION IN THE DISTRICT OF JALPAIGURI DURING YHE YEAR 2022-23
Emergent patch repair work of Kharar - Hazipur Road from 0.000 Kmp to 3.00 Kmp and Kharar - Irpala Road from 0.000 Kmp to 3.00 Km under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Patch repairing on bituminous surfacing with allied works from 0.00km. to 3.04km. of Bhat Dhawla near Kathalbari GP Office to Bhuban Sarkar Ghat road under Alipurduar Highway Division in the district of Alipurduar during the year 2023-24.
P.W. Roads Office Campus, Roads within the premises and Link Road between NH 60 and R.M. Road at Carani Bandh from CH 0.00 Kmp to 0.10 Km Surfacing work under Bankura Highway Division in the district of Bankura.
Kolkata-Basanti Road from 69.00 kmp to 70.00 kmp, 71.50 kmp to 72.40 kmp and 75.85 kmp to 78.30 kmp, Patch Repair under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas during 2020-2021.
FHTC in connection with Utiliy Shifting of water pipeline in connection to the work under Nadia Highway Division-I Dte. along Dharmadah-Muragachha Road under surface water based WSS under Debagram Sub-Division under Nadia Division, PHE Dte.
Maintenance and repair to Ramjibanpur Byepass Road from 0.00kmp to 2.60km in stretches by WBM, repairing potholes, 20mm P.C and Seal coat type B under Midnapore Highway Division in the district of Paschim Medinipur. (Ch to Non Plan)
Emergent Supplying of CRRI approved material for instant use in all weather conditions to repair the potholes, road repair having polymeric premix capable of performing in water logged potholes area etc at different stack yard under Midnapore Highway
Kharibona-Ranitala road from 0.00 kmp to 3.80 km and Berhampore-Hariharpara-Amtala road from 10.60 km to 10.75 km, Installation of Metal Crash Barrier work under Murshidabad Highway Division No.I in the District of Murshidabad. (2nd Call)
Makrampur - Temathani Road from 0.00 kmp to 3.00 kmp, 8.00 kmp to 11.00 kmp and 17.00 kmp to 20.00 kmp, repair work (in stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Egra Bypass Road from 0.00 km to 0.975 km, temporary patch repairing work by potholes repairing, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025
Repairing of Service road from Majherhat Railway station to KOPT Hospital under Alipore Sub-Division No- III and PIU, Majherhat R.O.B. of Howrah Highway Division in the district of South 24 Parganas during the Year 2019-2020 PWRD
Tamluk-Moyna Road from 8.00 km to 11.00 km, temporary patch repairing works by repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024-2025
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 0.00 Kmp to 0.40 Km by mending potholes and depressions by stitching picked jhama bricks in stretches under Murshidabad Highway Division No.-II during the year 2020-21
Ppatch repairing works of Feeder Road from STKK Road to Missing Link to Jirat from 0.00 km to 3.00 km of BHSD I under Hooghly Highway Division -II, In the District of Hooghly during the Year 2023 -2024
Emergent temporary repairing work in different stretches of Dhupguri-Nathua road portion from 1.50km to 4.00km and 6.00kmp to 9.00kmp with potholes, premix carpet and seal coat under Jalpaiguri Highway Division in the district of Jalpaiguri during th
Restoration work of Kalna-Baidyapur road from 7.90 km to 13.75 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division
Providing round the clock security arrangement by deploying 15 nos. security guard per day for guarding at different office premises, stack yard under Purulia Highway Division in the district of Purulia during the year 2023-2024.(2nd Call)
Recovery and restoration work of Byapari Para (Pradip Byapars House) to Krishnapur - Tufanganj road via Gourmohan Bazar, from 0.00 kmp to 4.43 km under Cooch Behar Highway Division in the district of Cooch Behar for mending up damages
Hiring of One (1) No. Motor Cab/Maxi Cab Engine Capacity more than 2000 CC as Inspection Vehicle on monthly basis for the official use of the Assistant Engineer, Siliguri Highway Sub-Division-I, PW(Roads) Dte., Siliguri.
Emergent repairing work of Drain of P.W. Roads Dte. Housing Complex of Midnapore Hwy. Sub-Divn. Office Compound at Saheed Mangal Pandey Sarani, Midnapore under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Providing of road safety measures i.e. bituminous speed breakers, signage boards, road marking, road studs and W metal beam crash barrier on Sahudangi to Belacoba road chainage 9.20km to 11.860km under Jalpaiguri Highway Division during the year 2025
Link Road to Islampur School and Hospital Road from 0.00 kmp. to 1.20 km., Emergent restoration and repairing work due to excessive rainfall under Murshidabad Highway Division No.I. in the district of Murshidabad during the year 2025-2026.
Repairing of Flank and Carriageway (Only Paver Block Portion) Damaged due to laying Electricity Network (Micro-Tunneling from 0.80 km to 3.80 km) of Garia Railway Station to Gangajoara Road by WBSEDCL under South 24-Parganas Highway Division.
Asansol Byepass to Domohoni Road (FR-6), providing drainage facility in stretches from 1.00 km to 3.00 kmp(total 900m) under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23.
Bridge over River Kumari at 7.550 Km on Manbazar-Bandwan-Kuilapal Road (SH-5), Restoration of Damaged Protective Works Including Protection of embankment, Slope pitching etc. and allied Works under Purulia Highway Division in the District of Purulia