Loading…
Loading…
11,061 results • Best match
Rejinagar - Sarbangapur Road from 1.0 Kmp to 3.50 Km, 5.0 Kmp to 6.0 Kmp and from 7.0 Kmp to 10.14 Km, Repairing work under Murshidababad Highway Division No. I, in the district of Murshidabad (2nd call).
Emergent Rain Damage Repairing of Potholes and Patch Repairing of Ramganj Udrail Daspara Road from Ch. 7.00 Km to 8.00 Km and Ch.13.00 Km to 16.00 Km(in stretches) under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Providing and Fixing Highway Grade ABS Spread Breakers (Temporary bumps) to various point at Kachuberia-Gangasar road at sagar under Kakdwip Hwy SubDivn of Diamond Harbour Hwy Division in the dist of South 24 Pgs for ensuing G.S Mela 2023
Construction of temporary pandal for rest shed at Harwood Point for the period of 09.01.2025 to 17.01.2025 for the purpose of reporting and deployment of police personnel on the occasion of Gangasagar Mela 2025 under Kakdwip Highway Sub-Division of D
Eklakhi to Rashikpur Road MDR from 3.500 km. to 4.300 km, 4.800 km to 5.500 km, 6.200 km to 7.000 km, 7.300 km to 8.500 km in stretches Patch repairing works under Malda Highway Division in the district of Malda.
Bamboo railing on 150 mm dia Jhau or Eucalyptus or other approved timber at Ashram More and Maity More for maintaining queue of pilgrims at Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division in the district of S24Pgs
Restoration work of road damaged due to laying of underground natural gas supply pipeline by HPCL along Bishnupur-Beliaghata Road from 0.00 kmp.-15.20 km. under the jurisdiction of Barasat Highway Division-I in the district of North 24 Parganas
Bagnan-Srikol-Kamalpur Road (SH-15), At 2.8 Km Chainage (In front of Bagnan-II BDO Office) 5.8 Km Chainage (In front of Mugkalyan Rural Hospital), Implementation of Traffic Calming Measures under Howrah Highway Division in the district of Howrah
Face Lifting of baluster railing on the bank of Ganges river at Foreshore Road to Railway Museum via Grand Foreshore Road and Office of the Commissioner of Police from 0.50 kmp to 1.55 kmp under Howrah Highway Division during 2025-26
Construction of Fountain Ring, GI Sheet Box , Pipeline Work for I love Suri Sites(3 NOS.) at Different Location (I) Near Channel, Bolpur Suri Road (II)Infront of Circuit House, (III)Infront of Dubrajpur Suri Highway within Suri Municipality area unde
Hire and labour charges for View cutter along median verge from Ashram More to Maity More for maintaining queue of pilgrims at Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Parganas for
Constrn of Buffer Zone by providing brick soling, Jhama bats and supplying bats, sand bag, labour etc at Krishnanagar Gandhi Smriti Maidan at Sagar Island under Kakdwip Hwy Sub Dvn, D.H. Highway Dvn, South 24 Pgs for ensuing G. S.Mela 2023
Const. of anchor block for resting of 250/200 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at different places for Mathbari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village (from Km.54.000-Km.90.000 Pkg-3 Total Length 36Km) under BMP in the state of Bihar on HAM
Kaliachak to Niamatpur Road from 9.50 Km to 11.25 Km and 12.25 Km to 13.25 Km Repair of existing bituminous courses by poholes and surfacing in stretches under Malda Highway Division in the district of Malda during the year 2020 2021.
Bamongola Habibpur Road, from 12.00 km to 21.28 km, Emergent potholes repairing work with brick stitching and 20 mm thick premix carpet and seal coat in stretches under Malda Highway Division in the district of Malda, during the year 2022 2023.
Cleaning drain from 13.70 kmp (Airport 1 No. gate) to 14.58 kmp (Airport 2.5 No. gate) and repairing of damaged Kerb Stone along with Footpath at 13.92 kmp. (near Airport 2 No. gate) of Jessore Road under Baguihati Highway sub-division
Hire and running charges for a 05.00 KW. eco-friendly Generator Set including cost of fuel, lubricants and cost of operator complete for providing electrical power at the Campus of the office of the Assistant Engineer, Kakdwip Highway Sub-Division
Cleaning drain from 13.70 kmp (Airport 1 No. gate) to 14.58 kmp (Airport 2.5 No. gate) and Repairing of damaged Kerb Stone along with Footpath at 14.57 kmp. (near Airport 2.5 No. gate) of Jessore Road under Baguiati Highway subdivision
Sinking of 1 no Deep tube well 200 mm X 150 mm dia along with other related works near Bangoor on K.N.I. Avenue under Baguihati Sub-Division of barasat Highway Division No.-I in the District of North 24 Parganas.
REPAIRS TO LEEKAGE/SEEPAGE IN ROOF, CHAJJA, BALCONIES, WALLS ETC AN MISC REPAIR WORKS TO CERTAIN BLDGS AND REPAIR/REPLACEMENT OF HIGHWAY LIGHT, PATHWAY LIGHT, GARDEN LIGHT, POST TOP LANTERN AND OTHER CONNECTED WORKS AT TECHNICAL/DOMESTIC AREA UNDER G
Repair and Maintenance of Road at the end of Road No. V, in front of Helipad by WBM, BM, Bituminous profile corrective course, 20 mm Premix Carpet and Premixed Seal Coat type-B at Sagar Island under Diamond Harbour Highway Division
Day to day sweeping, cleaning and thorough washing the office floor with dusting the office furniture, grill and windows and cleaning of office toilets at the office of the Executive Engineer, Barasat Highway Division No. I at the office of AE
Day to day sweeping, cleaning and thorough washing the office floor with dusting the office furniture, grill and windows, cleaning of office toilets at the office of the Executive Engineer, Barasat Highway Division No. I at the office of Assistant
Estimate for repairing and maintenance work over the damage surface in stretch Km 0.80 to Km 2.30 of Joypur- Pathdanga Road under Murshidabad Highway Division No. II PW(R)Dte in the District of Murshidabad during the year 2026-27.
Kaliachak-Golapganj Road from ch. 0.00 km to ch. 4.00 km and from ch. 6.00 km to ch. 9.00 km (In stretches) Bituminous pothole repairing work, under Malda Highway Division in the District of Malda during the year 2026-2027.
Paharpur-Swarupganj Road Bituminous Potholes Repairing work from 0.00 kmp to 3.50 kmp, from 3.50 kmp to 4.70 kmp, from 6.50 kmp to 6.80 kmp (In Stretches) under Malda Highway Division in the District of Malda in the year 2026-2027.
Emergent Damage Repairing of a culvert and protection work of Embankment near the culvert at 33.996 Km of Chanditola-Seakhala-Champadanga Road of Jangipara Highway Section of Serampore Highway Sub Division Office under Hooghly Highway Division-I.
Repairing of potholes by precoating of stone material at different roads under Haripur Highway Section of Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman, during the year24-25
Emergent repairing of monsoon induced damages of different roads (Except DLP Zone) under Gurap Highway Section (in stretches) under Hooghly Highway Sub-Division of Hooghly Highway Division No. I, P.W. (Roads) Directorate in the district of Hooghly
Emergent repairing of monsoon induced damages of different roads (Except DLP Zone) under Arambagh Highway Section (in streches) under Arambagh Highway Sub-Division of Hooghly Highway Division No. I, P.W. (Roads) Directorate in the district of Hooghly
Emergent repairing of monsoon induced damages of different roads (Except DLP Zone) under Kamarpukur Highway Section (in stretches) under Arambagh Highway Sub-Division of Hooghly Highway Division No. I, P.W. (Roads) Directorate in the district of Hoog
Construction of Fencing over Boundary wall at Nabadwip Highway Sub Division premises along with Nabadwip Inspection Bungalow under Nabadwip Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte during the year 2024-2025. (Non Plan)
Construction of Road Side Drainage System and Concrete Paver Block Laying Infront of Burdwan South Highway Division Office Compound, under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. during 2023-24
Construction of three nos new gate and RBT Concertina fencing at Sagardighi Highway Section office in the compound of Sagardighi stackyard at Sagardighi under Raghunathganj Highway Sub-Division under Murshidabad Highway Division No-I during the year
Emergent repairing work of different roads in patches by precoating stone aggregates under Buniadpur Highway Section I and kushmandi Highway Section under Buniadpur highway Sub Division in the District of Dakshin Dinajpur during the year 2026 27
Recovery and restoration work of Arbetai Sahapara Road from 0.00 Kmp to 10.710 Kmp under Nadia Highway Division No. I in the District of Nadia for mending up damages occured due to heavy rainfall / flood like situation.
Construction of Shed at open terrace in first floor of Central Highway Circle under Murshidabad Highway Division No.I. during the year 2025-2026.
Sweeping, cleaning and guarding in and outside of the Bangur subway on KNI Avenue under Baguiati Highway SubDivision of Barasat Highway Division No.
Repairing of old Western Highway Circle - II office premises at Roose Villa, Pankhatuli under Hooghly Highway Sub-Division during the year 2023-2024
Maintenance Work of Murarai inspection Bungalow and premises under Rampurhat Highway Sub-Division of Birbhum Highway Division-I during the year 2022-2023
Special repairing works of Division and Sub Division office building for Jalpaiguri Highway Division under Jalpaiguri Highway Division during the year 2024-25
Emergent patch repairs of Lalganj-Gourandi-Runakuraghat Road from 1.5 kmp. to 4.0 kmp. under Asansol Highway Sub-Division of Asansol Highway Division
Sweeping, cleaning guarding in outside of the Bangur subway on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No.-I
Protective Work around pond side at Kona Stack yard of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah
Re-construction and extension of Daspur Highway Section Office Building under Midnapore Highway Division, P.W. (Roads) Directorate in the District of Paschim Medinipur.
Road Safety Works for different Roads of Basirhat Highway Sub-division under Barasat Highway Division No.I in the District of North 24 Parganas .
Emergent Surfacing works within the campus of Barasat Highway Sub Division under Barasat Highway Division - II in the Dist. Of North 24 Parganas
Sweeping, cleaning guarding in outside of the Baguiati subway on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No.-I
Sweeping, cleaning and guarding in and outside of Raghunathpur subway on KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No.