Loading…
Loading…
11,110 results • Best match
Majhergram-Malamba Road(MDR)-Repair and maintenance works from 0.00 kmp to 4.00 kmp(in stretches)-under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist.of Purba Bardhaman during the year 2020-21
Repair and Maintenance of DCDKM (SH-5) Road from 12 to 24 Kmp (Different Stretches) by providing 20mm thick Premix Surfacing, Seal Coat (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division during the year 2020-21.
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15 5.15 kmp. from Kolkata flank of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I for the period 1yr
Repair and maintenance of THA Rd from 18.00 Kmp to 22.00 Kmp (Different stretches) by providing 20 mm thick premix carpet, seal coat (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division in the District of Purulia.
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 6.50-8.05 kmp. from both side of KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I for the
Emergent restoration for damaged rigid approach road at Lot-8 LCT Jetty due to desiltation in Muri Ganga River at Kakdwip, under Kakdwip Highway Sub Division of Diamond Harbour highway Division in the District of South 24 Parganas during 2019-20.
Dewanghata Bowbazar Road with a link to Deulpur H.C. - Rehabilitation and Restoration of culverts at 0.00 Kmp,1.20 Km and 2.00 kmp of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah ,PWRD During 2019-2020
Arbetai- Sahapara Road from 0.00 km to 10.80 km for Patch repairing and maintenance work in different stretches under Krishnagar Highway Sub Division No.-I under Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025
Repair and Rehabilitation of the existing Bhajanghat Bridge at 6.30 Km of Majdia Bhajanghat Road under Krishnagar Highway Sub Division No.II, P.W. (Roads) Directorate of Nadia Highway Division No. I, in the district of Nadia during the year 2020 21
Kashemnagar-Natunhat-Shrikhanda Road (KNS-II), Ch. 11.00 kmp to 18.00 kmp maintenance and repair work in stretches under Bhatar Highway Sub-Division-I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Bainchi Jamna Baidyapur road from 0.00 km to 7.00 km Left side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Division -II in the
Emergent construction of a new 1.00 mtr dia Hume Pipe Culvert at 36.15 km and approaches of Sultangacha Khanpur Dasghara Road under Hooghly Highway Sub-Division of Hooghly Highway Division No. I in the district of Hooghly during 2025-26.
Restoration of damaged Wing Wall and restoration work of approach portion of box Bridges at 21.4 and 30.4 Km of Jhalda Bagmundi Road under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year2021-22
Repairing work of Furfura sarif Jangipara road (Nilarpur Sandhipur Road from 2.00 kmp to 5.10 kmp) in stretches of Serampore Bridge Highway Sub Division under Hooghly Highway Division No- II in the district of Hooghly during the year 2024 - 2025.
Patch repair works on Suri Rajnagar Road (SH-6) from 16.00 kmp to 19.00 kmp in stretches under Birbhum Highway Division -II in the District of Birbhum.in patches under Birbhum Highway Division -II P.W. (Roads) Directorate in the District of Birbhum.
Construction of Boundary wall at the Stackyard of Krishnaganj Highway Section at the road side parallel to Krishnagar Majdia Road of Krishnagar Highway Sub-Division No. II, P.W. (Roads) Directorate in the District of Nadia during the year 2022 2023.
Maintenance and repair works of STKK to Patuli Railway Station Road from 2.00 kmp to 5.00 kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Feeder Road from STKK to Missing link to Jeerat from 0.00 km to 4.372 km Right side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway
Badkulla - Kulgachi road from 0.00 kmp to 4.00 kmp patch repairing work by potholes under Krishnagar Highway. Sub-Division No-II of Nadia Highway Division No-I, PW(Roads) Dte. in the Dist. of Nadia during the year 2025-26.
Repairing of existing damaged concrete road surface at 20th Km (Near Hari Mandir, Durga Mandir, Main Market) of Hura-Puncha Road under Puurlia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Debpur Bus Stand to Debpur road from 0.85 km to 1.89 km Surfacing and other allied works of Kalna Highway Sub Division under Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24
Krishnaganj Gobindapur road from 2.50 kmp to 5.00 kmp. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026. (2nd Call)
Sankarpur Nibhuji Bazar Road, Repairing Work from 4.00 kmp to 7.42 km in Patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2024-25
Urgent Pothole Repairing Works from 3.00 km to 13.00 km including improvement of road side flanks with dressing and chilchalling at Monteswar-Dainhat Road (SH-15) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purb
Pandua Kalna Road from 2.00 km to 12.00 km Left side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Division -II in the District
Pandua Kulti Road from 0.00 km to 6.02 km Right side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Division -II in the District
Installation of table top speed breaker in front of schools steep curve, junction point at different chainage from 5.00 km to 11.40 km of Chandannagar Nasibpur road of Chandannagar Highway Sub Division under Hooghly Highway Division No- II P.W Roads
Link Road from STKK to Borail from 0.00 km to 1.17 km (Left side shoulder) Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Division II
Debagram Katwaghat Road from 2.00 Kmp. to 4.00 Kmp. and 6.00 Kmp. to 9.00 Kmp., emergent repairing work with potholes, 20mm P.C. and S.C. in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Roads) Dte
Maintenance and repairing work of Ujalpukur-Rampara-Toralpur Road in stretches from 1.00 kmp to 2.00 kmp under Serampore Highway Sub-Division within Hooghly Highway Division No-I,P.W.Roads Directorate, in the district of Hooghly in the year of 25-26
Bagnan -Srikol-Kamalpur Road, from 13.00 Km to 20.00 Km and Mankur-Bakshihat Road, from 0.00 Km to 3.00 Km, Maintenance of Road Flank Portion under Uluberia Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Maheshganj to Nabadwipghat Road from 0.80 Km to 1.80 Km. Emergent patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-I of Nadia Highway Division No.-I in the District of Nadia during the year 2023-2024
Mirzapur Fultala More to Anuppur Road patch repairing with jhama metal from 0.70 Km to 1.20 Km. and 2.50 Km. to 3.0 Km. (Without mastic Zone) under Raghunathganj Highway Sub-Division of Murshidabad Highway Division-I, during the year 2024-25.
Nabadwip Municipal Link Road from 2.00 Km to 3.50 Km. Emergent patch repairing work in different streches under Krishnagar Highway Sub-Division No.-I of Nadia Highway Division No.-I, P.W. (Roads) Directorate in the District of Nadia during the year
Emergent repairing and maintenance of Boinchee Horal via Bilsora Road from 1.00 km. to 2.90 km. and 4.00 km to 5.60 km. in patches under Hooghly Highway Sub - Division of Hooghly Highway Division No. I in the district of Hooghly.
Suri Rajnagar Road, from 9.00 kmp to 10.00 kmp and from 12.00 kmp to 14.00 kmp, repairing and maintenance work in patches prior to monsoon under Suri Highway Sub-Division of Birbhum Highway Division-II, in the District of Birbhum.
Repairing and Rehabilitation Work of a Minor Bridge and at ch 1.65 km and a Slab culvert at Ch 3.30 km on Khanyan - Itachuna Road, of Chandannagar Highway Sub Division under Hooghly Highway Division-II during the year of 2022-23
Repair and Mtc. work from ch. 100.00 kmp to 100.50 km (Futisanko More) and 109.50 km to 110.00 kmp of Ramjibanpur-Palita-Palitpur-Natunhat Road under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman
Mtc. and Patch Repairing of Balgona-Guskara Mankar Road from ch. 2.00kmp. to 4.00kmp. and 18.15km. to 19.15km. under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Akandaberia Juranpur Road from 1.00 Kmp. to 3.00 Km. Emergent repairing work with potholes, 20mm P.C. and S.C. in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Roads) Directorate during the year 2022 23
Prajabar Arankiarana from Ch. 9.70 Km to 10.70 Km, temporary patch repairing works by repairing potholes, 20 mm PC and SC in stretches under Panskura Highway Sub Division withinTamluk Highway Division in the district of Purba Medinipur during the yea
Rain damaged repair of Mahishadal Bye Pass Road from 0.00 km to 0.70 km in patches under Haldia Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2022 2023 Ch To Non Plan
Kulgachi Barnia road from 0.00 kmp to 8.00 kmp emergent restoration and repairing work in different stretches with potholes repair under Plassey Highway. Sub-Division of Nadia Highway Division No-I, PW(Roads) Dte. in the Dist. of Nadia during the
Emergent restoration of damaged carraigeway from 0.00 km. to 3.00 km. in Feeder Road from STKK to Balagarh Feeder of Bansberia Highway Sub-Division- I under Hooghly Highway Division -II, In the District of Hooghly during The Year 2026 - 2027
Emergent work for Preparation of entry and exit Ramps for Parking of vehicles at different places at Furfura Sharif during Isal- E- Swabab, 2025, under the Serampore Highway Sub-Division of Hooghly Highway Division No-I,Public Works (Roads) Dte.
Emergent restoration of road flank by construction of PCC Guard Wall on Krishnagar-Gobindapur Road at right side of chainage 5.10kmp.(approx) under Krishnagar Highway Sub Division No-II of Nadia Highway Division No-I, P.W. (Roads) Dte. in the distric
Attagarh Shaktigarh Road (MDR), Repairing Work from 1.00 km to 3.50 km in Patches, Under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24
Dharmada Muragacha Road from 4.00 kmp to 7.00 kmp. by repairing potholes with seal coat under Krishnagar Highway Sub-Division No.-I under Nadia Highway Division No.- I in the District of Nadia during the year 2020 2021 (Pre Monsoon work)
Bhatar-Bonpas Road within ch. 4.950 kmp to 4.980 kmp, Protective work by Eucalyptus Bullah Piles with back filling by dept. borrowpit earth under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the District of Purba Bardhaman
Feeder Road from STKK to Khamargachi feeder road from 0.00 km to 1.23 km Right side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway