Loading…
Loading…
11,110 results • Best match
Maintenance and repair works of STKK to Patuli Rly. Station Road from 0.00 kmp to 4.00 kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Tilpara- Messanjore Road from 3.0 Kmp to 4.0 Kmp, and 6.0 Kmp to 6.50 Kmp patch repairing work in stretches under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum, during the year 2024-2025.
Badulia Khandaghosh road (VR) Urgent Repair works from 6.00 kmp to 8.00 kmp , 15.00 kmp to 16.00 kmp in patches under Sadarghat Highway Sub-Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman
Urgent Repair Work of Bamunia Mangalpur Road (VR) from 4.00 kmp to 5.60 km under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2024-25
Emergent Temporary Restoration work at flood damaged portion of Katwa-Churpuni-Billeswar-Palita Road at 6th and 7th kmp under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Replacement of damaged concrete wearing coat along with bituminous overlay and providing DBM and Mastic Asphalt on Tallah Bridge at 20th km. of Khejuri Heria road under Contai Highway Sub Division of Tamluk Highway Division during the year of 2019-
Emergent Patch Repairing and Maintainance Work of Bethuadahari Birpurghat Road from 0.00 Km to 6.800 Km (In Streches) under Krishnagar Highway Sub-Division No-I under Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026
Urgent patch repairing work in stretches of Dankuni ROB service road Both Side and Kalachara Bhagabatipur road ch 3.55km to 6.15 km of Serampore Bridge Highway Sub Division under Hooghly Highway Division No-II in the district of Hooghly during the
Day to day sweeping the main carriageway, service road, footpath and parking area and removal and disposal of waste materials from 5.15-8.05 kmp. from both side of KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I
Katlamari Health Centre Road from 0.00 Km to 2.20 Km, Patch Repair (Bituminous Potholes, W.B.M. covered by 20 mm P.C. and seal coat in stretches) under Islampur Highway Sub-Division of Murshidabad Highway Division No.I in the district of Murshidaba
Rep of Guskara-Ausgram-Chhoraphari Jungle Road from 0.35 km to 1.00 kmp in stretches under Sadarghat Highway Sub-Division No.-II under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23
Sarai Link road from 0.00 Kmp. to 2.17 km surfacing work by 20 mm. Premix Carpet, Seal Coat and Repairing Potholes etc. under Bansberia Highway Sub-Division No.Il under Hooghly Highway Division No.ll in the district of Hooghly during 2023-2024.
Jirat feeder to Siddheswari Temple road from 0.00 km to 0.320 km surfacing work by ICPB block WBM work of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II In the District of Hooghly during The Year 2025 -2026
Santragachi - Mohiary Road at chainage 0.00 Kmp to 6.320 Km - Restoration of damaged road portion that will be done by KMDA for drinking water supply line under Howrah Highway Sub-Division of Howrah Highway Division, PWRD in the district of Howrah.
Supplying and Fixing Grasses Tiles of Mexican Carpet/ Selection No. 1 Healthy and Fresh Grasses at All Weather Helipad 03 Nos. at Sagar Island of Kakdwip Highway Sub-Division under Diamond Harbour Highway Division in the District of South 24 Pgs.
Kustaur Railway Station to Chas Chandankiary Road from 14.00 to 20.00 Kmp, (Different stretches) Repair and Mtc work by providing potholes, 20mm th PC, SC (Type-B) under Purulia Highway Sub-Divn of Purulia Highway Division in the District of Purulia.
Renovation and Reconstruction of fallen portion of Boundary wall of Rest Shed cum Inspection Bungalow at Krishnagar under Krishnagar highway Sub-division No.-I of Nadia Highway Division No.-I in the district of Nadia during the year 2023-2024
Planting of trees of both sides of flanks of PanduaKulti Road from 0.00 km. to 6.00 km. of Bansberia Highway Sub-Division No- I under Hooghly Highway Division No.- II in the District of Hooghly during the year 2023-2024.
Emergent restoration and repairing work in different stretches with potholes repair at Sali Harnagar Road from 5.50 Kmp to 7.716 Kmp under Plassey Highway Sub-Division of Nadia Highway Division No.I in the District of Nadia during the year 2025 - 20
Chatra Rudranagar Jagigram Road 0.00 kmp to 19.00 kmp Patch Repairing work from 3.50 kmp to 5.00 kmp under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2020-21 (2nd Call)
Emergent repair and rehabilitation of minor Bridges at 92.00 K.M., 93.90 km.,94.50 km.,and 95.50 km.,of Ramjibanpur-Ketugram-Katwa road(SH-6) under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman
Egra Bajkul Road from 51.00 Km to 25.00 Km Urgent Rain Damaged potholes and big depressions repair in patches under Tamluk Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2021 2022. Ch. To
Bituminous patch repairing of Balgona Guskara Mankar Road from ch. 0.00 kmp to 2.00 kmp under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24. (2nd Call)
Emergent repairing of different stretches at Kalipahari Tirat Road(FR-17) from 0.00 km to 2.00 km by providing repairing potholes 20mm premix and seal coat(Type-B) etc. of Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Dte
Emergent construction of RCC Box Culvert at Ch.2.10 km and Ch.4.20 km of Mathura Vikdas Road under Arambagh Highway Sub-division of Hooghly Highway Division No.- I in the district of Hooghly during the year 2025-26. (2nd call)
Balance estimate for surface repairing in stretches of Damda-Chakoltore-Daradi-Kenda-Manbazar Road from 32.00 Kmp to 46.00 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 21-22(2nd Call)
Restoration work of Nepakuli-Bagnapara Road from 1.50 km to 2.50 km damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division of Burdwan South Highway Division
Kulgachi Barnia Road from 0.00 kmp. to 6.00 kmp. Emergent Patch Repairing work with potholes repair 20 mm. P.C. and S.C. in stretches under Plassey Highway Sub Division of Nadia Highway Division No.I P.W. (Roads) Directorate in the District of Nadia
Repair of Sararhat Birlapur Road from 6.00 Km to 8.00 Km and 9.00 km to 15.66 km under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2022-2023
Repairing of probable flood damages with jhama metal (63mm to 45mm) and Moorum supplied by the Department in the upcoming monsoon period at different roads under Arambagh Highway Sub-Division of Hooghly Highway Division No.I in the District of Hoogh
Pre-monsoon collection of Jhama Metal for maintenance of probable flood damages in different road surface(except DLP zone) under Arambagh Highway Sub-division of Hooghly Highway Division No.I, P.W.(Roads)Dte., in the district of Hooghly during the ye
Mtc. and repair of Balgona-Chandrapur Road from ch. 3.00kmp. To 4.00kmp. , 6.50km. To 7.00km. And 9.50km. to 10.00kmp. under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_2
Raina - Jamalpur road - Repair and Maintenance works from 3.00 kmp to 7.00 kmp in stretches under Sadarghat Highway Sub Division No-1 of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the year 2022-23
Traffic calming measures (for Road Safety) by construction of Circular Hamp on different link roads of Ahmedpur-Kirnahar-Ramjibanpur Road (SH-6)from 0.00 kmp to 15.00 kmp under Kirnahar Highway Sub Division of Birbhum Highway Division-II, P.W.(Roads)
Singur High School to Durgapur Exp. Way Via Dhirganj Road from 0.00 kmp to 0.500 km Widening work under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No- II, in the District of Hooghly during the year 2022-23.
Patch repair work in stretches with potholes of Kaichar-Nandigram-Singhi Road (MDR) from 15.00 Km to 18.00 Km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Brick stitching at different damaged stretches of Chanditala Seakhala Champadanga Road, from Ch 27.00 Km to 27.040 Km and Ch 30.00 Km to 30.100 km under Serampore Highway Sub-division of Hooghly Highway Division No.-I in the District of Hooghly
Patch repair work in stretches with potholes of Kaichar-Nandigram-Singhi Road (MDR) from 23.00 km to 26.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Emergent patch repairing work of Different stretches at Domohani-Churulia-Ajoy Ghat Road from 7.30 km to 8.70 km by providing patching potholes and 20 mm premixed carpeting work of Asansol Highway Sub-Division under Asansol Highway Division, P.W.(rds
Soil lInvestigation work for the construction of proposed new bridge over river Behula at Ch. 5.7 0 km of Berui - Bhankunthapur road at Pathargata ) of Chandannagar Highway Sub Division under Hooghly Highway Division-II in the district of Hooghly dur
Tilpara-Messanjor Road from 3.00 kmp to 4.00 kmp and 6.00 kmp to 6.50 kmp, patch repairing work in stretches under Mollarpur Highway Sub-Division of Birbhum Highway Division-I, in the District of Birbhum, during the year 2024-2025.
Emergent Rain Damage Restoration at approach of 1.7 Kmp Boro Gorji I andW Bridge at Link Road from Chandannagar Nasibpur Road to Bhadreswar Station Road of Chandannagar Highway Sub-Division under Hooghly Highway Division No II in the district of Hoo
Sankrial to Manikpur Hirapur Bazer Road, From 0.200 kmp to 1.150 kmp, Emergent temporary restoration work in various Stretches for laying of PHE pipe line under Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah durin
Rasulpur - Khandaghosh - Chakpurahit (RKC) road (SH-8) -Urgent Repair works from 6.00 kmp to 7.00 kmp, 14.00 kmp to 16.00 kmp , 20.00 kmp to 21.00 kmp in patches under Sadarghat Highway Sub Division No-1 of Burdwan South Highway Division, P.W.
Emergent Rain damage repair of Potholes and Depressions by stitching picked jhama bricks with one brick-on-edge laid in herring bone pattern at different roads under Plassey Highway Sub Division under Nadia Highway Division No I,P.W.(Roads)Dte. durin
Rain damaged repair of Doulatpur Health Centre Road from 4.50 km to 5.50 km by stitching picked jhama bricks in patches under Contai Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2022 2023
Uluberia- Shyampur Road, from Ch. 0.250 Km (Goruhata Bridge) to Ch. 4.500 Km (Malik More), Restoration of Road Damages at Left Side due to Laying of Electricity Network of WBSEDCL by HDD methodology under Uluberia Highway Section of Howrah Highway Di
Murarai Health Centre Road from 0.00 Kmp to 3.00 Km and 4.00 Kmp to 7.00 Kmp Patch Repairing work in stretches under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum,during the year 2024-25
Maintenance and Repairs to the superstructure of RCC Box Bridge over Kandor at 5.41 Km of Kashemnagar-Natunhat-Sreekhanda Road (KNS-II) under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the district of Purba Bardhaman
Bhadreswar Station to Chandannagar Nasibpur Road Reparing Work from 0.00 Kmp to 1.3 Kmp by Repairing Potholes ,20mm Premix Carpet and Seal Coat in pathches of Chandannagar Highway Sub-Division uner Hooghly Highway Divsion No II in the District of Ho