Loading…
Loading…
11,110 results • Best match
Balarampur Bagmundi Road from 1.00 Kmp to 2.00 Kmp, 8.00 Kmp to 15.00, 20.00 Kmp to 24.00 Kmp, Maintenance and Repair work in stretches by providing potholes, Seal Coat TypeB etc under Balarampur Highway Sub-Division of Purulia Highway Division
Maintenance and repair works in stretches of Guskara-Kashemnagar Road (GK) from 3.00 Km to 6.00 Km under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Mogra-Damra-Bishpara-Raghunathpur Road Repairing and Patch Surfacing work from 0.00 kmp to 1.500kmp and 4.000kmp to 6.000kmp of Bansberia Highway Sub Division-I under Hooghly Highway Division-II in the district of Hooghly during the year of 2022-2023
Beldanga Amtala Patikabari Road from 35.10 to 37.10 Km. Emergent Repairing work in different stretches with potholes repair including 20 mm. P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia
Cutting of kattcha drain and removal of stagnant water on the road flank by supplying Road Mazdoor under different roads of Gurap and Pandua Highway Section during entire rainy season for 3 months under Hooghly Highway Sub Divn of HHD-I
Protective Work by Eucalyptus bullah pilling at left side embankment of Uchalan-Kaity Road from chainage 0.550 km 0.590 km under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhama
Nabadwip Municipal Link Road from 0.00 Km. to 2.50 Km. for patch repairing and maintenance (In stretches) under Krishnagar Highway Sub-Division No. I of Nadia Highway Division No. I in the District of Nadia during the year 2021 2022
Restoration work of road flank by Jhama metal at Gangatikuri Station Link Road from 0.00 kmp to 1.00 kmp, under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Premonsoon Repairing of Berhampore-Hariharpara-Amtala Road from 20.00 km to 25.00 km (in stretches) under Berhampore Highway Sub-Division of Murshidabad Highway Division No. I in the District of Murshidabad during the year 2023-24. from 11.00Km to 11
Repair and Mtc. of Hura Puncha Road from 10.00 Kmp to 22.00 Kmp (Different Stretches) by providing Pothole , 20mm thick Premix Surfacing, Seal Coat (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division during the year 20-21.
Dayerbazar Kalinga Canal Road from 2.00 Kmp. to 7.00 Kmp. Emergent patch repairing work in different stretches under Krishnagar Highway Sub Division No. I of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Barasat Bye Pass (Beliaghata Prithiba-Khosdelpur Road) from 11.975 kmp to 13.00 km and from 10.070 km to 10.235 km-Emergent restoration work in stretches under Habra Highway Sub-Division under Barasat Highway Division no.ll in the district of North 2
Repairing work of Bituminous surfaces in patches from 0.00 kmp to 6.00 kmp by repairing potholes, premix surfacing and seal coat of Monteswar-Dainhat Road under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardham
Inside and outside painting of rest shed cum inspection bungalow at Krishnagar including construction of new staff Toilet under Krishnagar highway Sub-division No.-I of Nadia Highway Division No.-I in the district of Nadia during the year 2023-2024
Feeder road from STKK to Balagarh CDP road from 0.00 km to 2.00 km Right side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Divisio
Bethuadahari Agradwip Ferryghat Road from 5.00 Km to 6.50 Km (In Streches) and Balance work from 9.50Km to 13.80 Km (In Streches), patch repairing and maintenance work under Krishnagar Highway Division No-I of Nadia Highway Division No.I in the Distr
Emergent patch repair of Bhaluka Bot Tala to Bhaluka Hospital Road from 0.50 Km. to 2.50 Km. under Krishnagar Highway Sub Division No. I of Nadia Highway Division No. I in the District of Nadia during the year 2020 2021
Aherbelma Pahalanpur Road (MDR) Repair and maintenance works from 9.00 Kmp to 11.00 Kmp in stretches under Sadarghat Highway Sub Division No.-I of Burdwan South Highway Division, P.W.(Roads)Dte. in the district of Purba Bardhaman during the year 24-
2. Emergent potholes repairing work in stretches from chainage 1.00 km. to 3.00 km.and from 5.00Km to 7.00Km of Gobra-Gobindapur-Swarupnagar road under Basirhat Highway Sub-Division of Barasat Highway Division No.-I in the district of North 24 Parga
Emergent Temporary Restoration work at flood damaged portion of Katwa-Churpuni-Billeswar-Palita Road at 6th and 7th km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Rain damaged repairing of Rautari to Teraparajalpai Road from 6.00 km to 10.00 km in patches under Haldia Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2022 2023. Ch To Non Plan
Emergent restoration of flanks at both side approaches of Bridge at chainage 3.50 km (approx) by providing PCC Toe Wall, Earth work etc. at Banpur Gede Road under Krishnagar Highway Sub Division No. II of Nadia Highway Division No. I
Emergent patch Repairing Work of Bethuadahari Agradwip Ferryghat Road from 0.00 Km to 5.00 Km (In Streches) under Krishnagar Highway Sub-Division No-I under Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025
Embankment Protection work by UC Bullah Pilling at Ch. 3.75 Km from Bhatar - Samanti Road to Village Chattni under Bhatar Highway Sub-Division-II of Burdwan North Highway Division in the District of Purba Bardhaman during the year 2023-24.
Emergent Temporary Restoration of Damages due to flood of Udaynarayanpur Pancharul road via Shibpur Charir Dokan with a link to Shibanipur from 0.00 Kmp to 7.00 Kmp of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah
Debogram Katwaghat Road from 5.00 Kmp. to 8.00 Kmp. Emergent Restoration and Repairing Work in different stretches with potholes repair including 20 mm P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Rd.) dte.
Pandua Kamtai Baloon Road from 2.86 km to 4.14 km reparing work in Patches by patching potholes,PC,SC etc of Bansberia Highway Sub-Division - II under Hooghly Highway Division -II, In the District of Hooghly during The Year 2026 -2027
Thorough Repairing of STKK Road to Dumurdaha Rly Stn Link Road remaining portion from 0.512 km to 0.58 km by WBM and Concrete paver blocks under Bansberia Highway Sub Division II of Hooghly Highway Division II in the District of Hooghly
Protective work by Eucalyptus bullah pilling at left side embankment of Uchalan-Kaity Road from chainage 8.200 km - 8.250 km under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte in the District of Purba Bwn
Patch repairing work at different chainage using Brick Stitching of Chakdaha Bhagirathi Ferryghat Road at Ch 0.00Km to Ch 1.500Km of Kalyani Highway Sub-Division under Nadia Highway Division No.II during the year 2025-26 in the District of Nadia.
Repairing of Khanyan-Tamba road from 0.00 Kmp. to 1.0 kmp ( in patches) by Repairing Potholes , 20 mm. thick Premix Carpet , Seal Coat etc. under Bansberia Highway Sub-Division No.II of Hooghly Highway Division No.II in the district of Hooghly, dur
Patch repair work of Link Road connecting from Raina Damuniya to Aherbelma Pahalanpur Road from 3.00 kmp to 6.00 kmp under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte In the district of Purba Bardhaman
Providing R.C.C Cover slab of drain on remaining length of Dhubulia-Mayapur road from 2.094km to 4.345 km under Krishnagar Highway Sub-division-I under Nadia Highway Division No. I in the district of Nadia during the year 2023-24.
Restoration work of Road Pavement damaged by PHF Department for their pipe laying work at Jangalpara Gangadharpur Road from 0.657 km to 0.957 Km of Serampore Bridge Highway Sub Division under Hooghly Highway Division no ll during the year 2024 25
Feeder Road from S.T.K.K to Missing Link to Jeerat Road from 0.00 kmp. to 4.37 kmp In stretches Patch Repairing work by repairing Potholes PC SC Bullah Pilling work of Bansberia Highway Sub-Division I under Hooghly Highway Division II
Construction of Hume Pipe Culvert at Nimtala Bazar area at 60.80 km of Saptagram - Tribeni - Kalna - Katwa (STKK) road (SH-6) under Nabadwip Highway Sub Division of Burdwan South Highway Division In the Dist. of Purba Bardhaman for the year 2022-
Repairing of Jhalda-Bagmundi Road from 4.00 Kmp to 12.00 Kmp on patches by repairing potholes, 20 mm thick premix carpet under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Restoration Works for Laying pipe line by PHED at Jamtala Hat from 19.50 km to 19.90 km of Jamtala Road Joynagar Jalaberia Kultali Road of Lakshmikantapur Highway Sub Division under Diamond Harbour Highway Division in the District of South 24 Pgs.
Tamba Illchoba Road within 2nd replacing of 1 no old damaged brick culvert by construction of new Single Cell 1.50m x 1.50m R.C.C box culvert under Bansberia Highway Sub Division No-II under Hooghly Highway Division No-II P.WRoads Directorate
Rasulpur-Khandaghosh-Chakpurohit (RKC) Road-Post monsoon patch repair works from 20.50 km to 25.50 kmp of Burdwan Highway Sub Division No-I under Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the year
Emergent Patch repairing work of Badkulla - Kulgachi road from 4.00 kmp to 6.50 kmp of Krishnagar Highway. Sub-Divn No-II under Nadia Highway. Division No-I, PW(Roads) Dte. in the Dist. of Nadia during the year 2023-24
Urgent temporary restoration of Kaichor Nandigram Singi Road (MDR) from 1 kmp to 2 kmp and from 9.50 km to 11 kmp by patching of potholes by jhama metal (in stretches) under Katwa Highway Sub-Division of Burdwan North Highway Division
Beldanga-Amtala-Patikabari road from 16.00 kmp to 22.00 kmp and 24.00 Kmp to 33.0 kmp, Patch Repair ( Bituminous Potholes, Surfacing by 20 mm P.C. and seal coat in stretches) under Berhampore Highway Sub-Division of Murshidabad Highway Division No.I
NH 34 (Mira) Health centre Road from 0.00 kmp. to 5.00 kmp. Emergent restoration and repairing works in different stretches with potholes repair including 20 mm. P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I
Sankarpur Nibhuji Bazar Road, Repairing Work from 0.00 kmp to 2.00 kmp in Patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24
Repair and maintenance of Tamna Helsa Arsha Road from 14.00 Kmp to 19.00 Kmp (Different stretches) by providing 20mm thick Premix Surfacing, Seal Coat (Type-B) etc. under Purulia Highway Sub-Division of Purulia Highway Division during the year 20-21
Protective works of road embankment between 11.10km to 11.20km on R.H.S of Krishnagar Nabadwip Dham road under Krishnagar highway sub-division No-I of Nadia Highway Division No-I in the district of Nadia during the year 2023-2024(3rd Call)
Repair and Mtc of DCDKM Road from 12.00 Kmp to 18.00 Kmp (Different Stretches) by providing Pothole , 20mm thick Premix Surfacing, Seal Coat (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division during the year 2020-21.
Maintenance of hedges trees from 4.00 kmp - 8.00 kmp. of K.N.I Avenue (VIP Road) covering the full width of the Right of Way (ROW) including footpath, road side flanks and middle verge under Baguiati Highway Sub-Division of Barasat Highway Divis
Feeder Road from STKK to Sripur Bazar road from 0.00 km to 1.30 km (Right side shoulder) Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Divis.