Loading…
Loading…
11,110 results • Best match
Errection of guard rail at approach of Bridge Hare Krishna Konar Setu at 9.40 kmp of Raina Jamalpur Road under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman
Urgent Repair and maintenance of Dhuturdah H C Road from 1.00 kmp to 2.00 kmp and 5.00 kmp to 6.00 kmp in patches under Basirhat Highway Sub-Division of Barasat Highway Division No-I, in the district of North 24 Parganas
Dressing and Chilchalling grubbing road land and removal of rubbish of Different Bridge flank Up Stream and Down Stream side Under Raiganj Highway Sub Division of Uttar Dinajpur Highway Division in the District of Uttar Dinajpur for the year 25-26
Moyna Bridge Approach Road from Ch 0.000 km to 0.570 km temporary patch repairing work by patching potholes repairing potholes20 mm PC and SC in stretches under Panskura Highway Subdivision within Tamluk Highway Division in the District of Purba Me
Patch repair work in stretches with potholes of Kaichar-Nandigram-Singhi Road (MDR) from 19.00 km to 23.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2023-24.
Emergent work for Embankment Protection along with other allied works over Khanyan Tamba road in stretches from 0.00 Kmp. to 1.73 km of Bansberia Highway Sub-Division No II under Hooghly Highway Division No II in the district of Hooghly
Advance collection of 1st class Jhama metal (kiln burnt) and moorum at Katwa Departmental Stackyard for patching of potholes by jhama metal at different road under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bard
Maintenance and repair works of Karajgram Bankapasi Road (MDR) from 11.50 kmp to 13.10 kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24. (2nd Call)
Barakpur Kalibari More on Chakdah-Bongaon Road to BBS Ghat on Sreepally-Bajitpur Road (Old alignmrnt of 1st KM of Sreepall-Bajitpur Road), Strengthening Work(One time repair) under Bongaon Highway Sub-Division of Barasat Highway Division No.II in the
Bhatar-Bonpas Road within ch. 3.900 kmp to 3.96 kmp, Protective work by Eucalyptus Bullah Piles with back filling by dept. borrowpit earth under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the District of Purba Bardhaman
Bridges at 1.190 kmp and 2.855 kmp of Kachua-Burkundahat-Gadamarahat Road and at 2.40 kmp of Kachua-Rajberia Road, Repair and Rehabilitation under Habra Highway Sub-Division of Barasat Highway Division No. II in the district of North 24 Parganas
Chandpara-Thakurnagar Road from 2.50 kmp to 5.00 kmp- Emergent Patch Repairing work in stretches with bituminous potholes repair,20mm P.C Seal Coat etc. under Bonga Highway Sub- Division of Barasat Highway Division No. II in the district of North 2
Repairing of Guskara-Ausgram-Chhoraphari Jungle Road from 5.00 kmp to 6.00 kmp and 12.00 kmp to 14.00 kmp in stretches under Sadarghat Highway Sub-Division No.-II of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim BWN
Urgent Restoration of damages made by PHE Department during their pipe laying work of Singur Banamalipur Road Shouldering from 0.00 km to 1.50 km of Serampore Bridge Highway Sub Division under Hooghly Highway Division no II during the year 2024
Emergent Patch Repairing of Dayerbazar Kalinga Canal Road from 0.00 Kmp. to 7.60 Kmp. by Potholes Repairing Premix Carpeting and Seal Coat under Krishnagar Highway Sub Division No. I under Nadia Highway Division No. I in the District of Nadia
Sagrai Raina road Emergent repair and maintenance works from 11.00 kmp to 12.00 kmp in stretches under Sadarghat Highway Sub-Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the yea
Link road from STKK to Borail from 0.00 km to1.17 km repairing work in stretches by ICPB block WBM work with patching potholes PC SC of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II In the District of Hooghly
Reconstruction of parapet wall including repairing work of bridges at ch. 81.505 Km, 94.905 Km and 95.629 Km of Ramjibanpur Ketugram Katwa Road (SH-6) under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardh
Urgent potholes repair with surfacing at different stretches of Burul-Bowali Road from 11.50 Kmp to 14.50 Kmp under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2020-2021.
Emergent repairing work of different roads in patches by pre coating stone aggregates along with repairing of road surface in patches at Balagarh Inchura Road from 0.00 km to 3.00 km of Bansberia Highway Sub-Division No. - I, Under Hooghly Highway
Jamar Village Junction to Hatgobindapur via Korar Road from 6.00 km to 9.50 km, Repairing Work in Patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division in the District of Purba Bardhaman during the year 2024-25
Urgent Restoration of damages made by PHE Department during their pipe laying work of Singur Banamalipur Road Shouldering from 1.5 km to 3.0 km In Stretches of Serampore Bridge Highway Sub Division under Hooghly Highway Division no II during the
Mtc. and Repair of Pachundi-Uddharanpur Road at 3rd km, 5th km, 7th km, 8th km and 9th km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22
Surfacing work from 1.8 Kmp to 3.14 Km of Link Road from Chandannagar Nasibpur Road to Bhadreswar Station Road of Chandannagar Highway Sub-Division under Hooghly Highway Division No II in the district of Hooghly in the year 2025-2026
Repairing work of Old G.T.Road (SH13) from 582kmp to 584kmp, 586kmp to 589kmp , 590kmp to 592kmp, 595kmp to 597kmp in patches under Burdwan Highway Sub Division No-II of Burdwan South Highway Division, P.W. (Roads) Directt. during the year 2020_21
Patch repairing of Badkulla - Kulgachi road from 0.00 kmp to 4.00 Kmp (In stretches) of Krishnagar Highway. Sub-Division No-II under Nadia Highway Division No-I, PW(Roads) Dte. in the Dist. of Nadia during the year 2025-26
Ramjibanpur-Palita-Palitpur-Natunhat Road (SH-7) at ch-114.457 Km near Gandhpur Bus Stand, Emergent restoration of broken railing of old and narrow box culvert over Kandar under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in..
Repairing a stretch of Old Egra Bajkul Road at 19th km near Amarshi Bazar by constructing a Cement Concrete Pavement under Contai Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2022 2023
S.H 13 at Ch. 601.95km to and Berui Baikunthapur Road at Ch. 0.214km, repairing works of Two nos. Culvert of Chandannagar Highway Sub Division under Hooghly Highway Division No II in the District of Hooghly during the year 2023 2024
Emergent repair and maintenance of Kashemnagar-Natunhat-Sreekhanda Road (KNS-II) within ch. 15.00 kmp to 20.00 kmp during the monsoon period under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman...
EMERGENT REPAIRING OF 2 TWO NOS. CULVERT AT CH 20.550 KM and 21.950 KM ON PANDUA KALNA ROAD OF BANSBERIA HIGHWAY SUB DIVISION NO II UNDER HOOGHLY HIGHWAY DIVISION NO II IN THE DISTRICT OF HOOGHLY DURING THE YEAR 2023 24
Pandua Kamtai Simlagarh Road from 0.00 km to 5.80 km ( In Patches ) by repairing potholes , P.C and S.C etc of Bansberia Highway Sub-Division-II under Hooghly Highway Division- II, in the District of Hooghly during the year 2024-2025.
Hijuli Matiari Road from 2.00 Km. to 7.35 Km., emergent repairing work with potholes, 20mm P.C. and S.C. in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Roads) Directorate during the year 2022 23
Patch repairing work from 5.00 km to 10.00 km and 11.00 km to 14.00 km in stretches of Nalhati Rajgram Road under Rampurhat Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26.
Akui Torkona Mogalmari road (MDR) - Repair and Maintenance works from 4.00 kmp to 7.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during th
Mollarpur Majhipara Bolpur Road from 18.50 kmp to 20.50 kmp 22.30 kmp to 23.00 kmp 27.00 kmp to 28.00 kmp and 29.00 kmp to 31.30 kmp Patch Repairing work in stretches under Mollarpur Highway Sub- Division of Birbhum Highway Division-I
Ghateswar Road branching from Kulpi Road from 0.00 Km to 1.00 Km Restoration of hard shoulder due to laying of pipelines by PHE Department under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Pgs
Habra Ashoknagar Bye Pass Road from 0.00 km to 0.030 km and from 0.320 km to 0.375 Emergent Repairing Work by ICBP under Habra Highway Sub-Division under Barasat Highway Sub-Division II in the District of North 24 Parganas
Patch repairing work from 0.00 km to 4.00 km and 5.30 km to 8.30 km in stretches of Kedar Roy road under Mollarpur Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Krishnagar-Debipur-Jalangi Road from 13.00 Km to 19.00 Km and from 25.00 Km to 30.29 Km, Patch Repair (Bituminous Potholes, Surfacing by 20 mm P.C. and seal coat in stretches) under Islampur Highway Sub-Division of Murshidabad Highway Division No.I
Barasat Bye Pass Road from 11.965 km to 11.992 km and from 10.175 km to 10.200 km Emergent Repairing Work by ICBP under Habra Highway Sub-Division under Barasat Highway Sub-Division-Il in the District of North 24 Parganas
Repair and Maintenance of Bispuria Bankura Road from 0.00 Kmp to 4.5 Kmp (Different Stretches) by providing 20mm thick Premix Surfacing, Seal Coat (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division during the year 2020-21.
Maintenance of hedges trees from 0.00 kmp - 4.00 kmp. of K.N.I Avenue (VIP Road) covering the full width of the Right of Way (ROW) including footpath, road side flanks and middle verge under Baguiati Highway Sub-Division of Barasat Highway Divis
Emergent restoration of ditches and surfacing work of NH 2 By-pass to Naity road via Gobra R.S. from 0.0 km to 0.800 km of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II in the district of Hooghly
Maintenance of hedges trees from 4.00 kmp - 8.00 kmp. of K.N.I Avenue (VIP Road) covering the full width of the Right of Way (ROW) including footpath, road side flanks and middle verge under Baguiati Highway Sub-Division of Barasat Highway Division
Santragachi - Mohiary Road at chainage 0.00 Kmp to 6.320 Km - Restoration of damaged road portion that will be done by KMDA for drinking water supply line under Howrah Highway Sub-Division of Howrah Highway Division, PWRD in the district of Howrah
Patch Repairing work of BARDA CHOWKAN to KHARAR Road from 0.00 KMP to 6.40 KM by reapiring potholes, premix carpet, seal coat, tack coat, flank treatment etc. under Ghatal Highway Sub-Division of Midnapore Highway Division in the District of Paschim
Repair work of Tamluk Moyna Road with bituminous materials from 5.50 km. to 7.00 kmp. in patches uunder Tamluk Highway Sub Division under Tamluk Highway Division in the District of Purba Medinipur during the year 2019 2020. Ch. To Non Plan
Construction of Road side drain at Bethuadahari- BirpurghatRoad from 7.37 Km to 7.65 Km. on left hand side under Krishnagar Highway Sub-Division No.-I of Nadia Highway Division No.-I in thec district of Nadia during the year 2025-26
Protective works of the road embankment adjacent to abutment wall of Bridge over river kunoor at 2.85 Km of Dauradanga-Baramallick Ghat Road under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman.....