Loading…
Loading…
11,112 results • Best match
Re Construction of collapsed part of the Boundary wall at Chakdah Stack yard compound due to the major Super cyclonic storm YAASH under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division in the district of South 24 Parganas.
Preparation of Traffic Census Report (7daysx24 hrs. including axle load survey ) at chg.18.20 km of STKK Road of Bansberia Highway Sub-Division No-II under Hooghly Highway Division No.II, P.W.(Roads) Directorate in the district of Hooghly, during th
Link road to Bidhapara road from Burdwan-Kalna Road from 0.00 km to 1.00 km for Surfacing work with profile corrective course of Kalna Highway Sub-Division under Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15-5.15 kmp. from both side of KNI Avenue and both flank of VIP Road Flyover under Baguihati Highway Sub Division of Barasat Highway
Felling of dead trees and Planting of trees by the road side (Avenue trees) on Swarupnagar-Hakimpur Road and Gobra-Gobindapur-Swarupnagar Road of Basirhat Highway Sub-Division under Barasat Highway Division No.I in the dist. of North 24-Parganas
Rain damage repair work in stretches with potholes of Kaichar-Nandigram-Singhi Road (MDR) from 14.00 km to 16.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2023-24.
Akra-Santoshpur-Taratala Road at ch.4.10 km, Emergent road restoration work (Damaged caused due to road cutting/open by CESC) of Alipore Highway Sub-Division under South 24 Parganas Highway Division in the district of South 24 Parganas(SL-03)
Sankrial to Manikpur Hirapur Bazer Road, From 2.25 kmp to 2.950 kmp, Emergent temporary restoration Work in various Stretches for laying of PHE pipe line under Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah during
Dhubulia Belpukur Road from 0.20kmp to 1.0 kmp, from 1.174 kmp to 4.0 kmp and4.674 kmp to 4.874kmp Emergent Patch repairing work in different stretches under Krishnagar Highway Sub Division No.-I under Nadia Highway Division No.-I in the District
Urgent repairing and restoration work (Bituminous patch in stetches) due to exessive rainfall of Panrui Batikar Road (MDR) from 0.00 kmp to 3.00 kmp under Bolpur Highway Sub - Division of Birbhum Highway Division -II , in the District of Birbhum dur
Sundalpur House of Biren Mondal to Mollahad via Babupara and Shekpara Road from 0.167 Kmp. to 3.167 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia
Emergent restoration for damaged rigid approach road at Lot 8 LCT Jetty due to desiltation in Muri Ganga River at Kakdwip, under Kakdwip Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas during 2020-21.
Supplying and Installation of Road Identification Board at 2.50 Km intervals at both sides of the Roads and Delineators at different Roads of Uluberia Highway Sub-Division under Howrah Highway Division in the district of Howrah ,PWRD During 2019-2020
Routine maintenance of DANKUNI ROB over Howrah Bardhaman Chord Line at Dankuni of Dist. Hooghly of Serampore Bridge Highway Sub-Divn. under Hooghly Highway Division No.-II P.W. Roads Directorate during the year 2025 26 in the district of Hooghly
Ranihati-Haridashpur-Amta Road, from 1.00 Kmp to 7.00 Kmp, Patch Repairing Work and Filling Cracks with Slurry Seal at Different streches of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year 2026-27
Sankrial to Manikpur Hirapur Bazer Road, From 1.250 kmp to 2.150 Kmp, Emergent temporary restoration work in various Stretches for laying of PHE pipe line of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah, PWRD
Repairing of STKK Road from 22.00 Kmp. to 26.00 kmp ( in patches) by Repairing Potholes , 20 mm. thick Premix Carpet , Seal Coat etc. under Bansberia Highway Sub-Division No.II of Hooghly Highway Division No.II in the district of Hooghly, during th
Maintenance of Link road from STKK to Somrabazar from 0.500 kmp to 1.40 by repairing potholes 20 pc , seal coat, jhama metal onsolidation etc in patches of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II, In the District Hooghly
Providing view cutter by G.I sheet on boundary wall and fencing at garden portion of office compound of Bansberia Highway Sub-Division No.-II under Hooghly Highway Division No-II. in the district of Hooghly during the year 2023-24.
Sali Harnagar Road from 4.00 Kmp to 5.50 Kmp emergent restoration and repairing work in different stretches with potholes repair under Plassey Highway Sub-Division of Nadia Highway Division No.I in the District of Nadia during the year 2025 - 2026
Dewanghata - Bowbazar Road with link to Deulpur H.C 0.00 kmp to 2.20 Km - Emergent repair of depression at edge filling by potholes materials and Protective work under Howrah Highway Sub-Division of Howrah Highway Division in the district of Howrah,
Nabanna Bus Terminous to Kona Road from 0.00 kmp to 0.660 km, Restoration of damage road portion by Concrete Interlocking Paver Block of Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah during the year 2024-2025.
Uchalan-Kaity Road (VR)-Patch repair works from 5.00 km to 8.00 km in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman during the year 2025-26
Flank protection, construction of embankment at Bulundi Kanaria Road from ch. 2.10 km to ch.2.55km, ch.4.10km to ch.4.65km and ch.6.35km to ch. 6.90km (effectively 1550m) in stretches under Arambagh Highway Sub-Division under Hooghly Highway Division
Repairing of Tamba Kamarpara Road from 4.50 Kmp to 6.615 Kmp In patches by Repairing Potholes 20 mm. thick Premix Carpet Seal Coat etc under Bansberia Highway Sub-Division NoII of Hooghly Highway Division NoII in the district of Hooghly
Gantimore to Gandharbapur Road (VR) Urgent Repair and Maintenance works from 0.00 kmp to 3.00 kmp in patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division in the district of Purba Bardhaman during the year 2025-26
Emergent repairing and maintenance of Mogra Dasghara Road at Gurap abandoned portion of SKD from 0.00 km. to 2.00 km. in patches in different stretches under Hooghly Highway Sub Division of Hooghly Highway Division No. I in the district of Hooghly
Supply of Pre-coating stone aggregate with MC-800 bitumen at Arambagh Stackyard for repairing potholes at different roads of Arambagh Highway Sub-division during monsoon season as and when necessary basis under Hooghly Highway Division No.1 during th
Surfacing work of Marshit Basant Buri Tala Road from 0.00kmp to 1.35kmp by providing repairing potholes PC SC WBM etc. of Chandannagar Highway Sub-Division under Hooghly Highway division No-II In the District of Hooghly during the year 2021-22
Repairing of Sarisha Noorpur Road to Hooghly River Bank Road from 0.00 Kmp to 1.10 kmp under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2024-2025.
Repair of Road from Polashi No. I to Polashi Sugar Mill in Kaliganj Block under PATHASHREE programme under jurisdiction of PWD (R) Dept., Plassey Monument Road from 0.00 Kmp to 3.20 Km under Plassey Highway Sub-Division of Nadia Highway Div ....
Maintenance and patch repairing in stretches of Bhatar-Nasigram Road from ch. 0.00 kmp to 8.00 kmp under Bhatar Highway Sub-Division No. II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Urgent temporary restoration of Kaichor Nandigram Singi Road (MDR) from 4.50 kmp to 7.00 kmp by patching of potholes by jhama metal (in stretches) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist. of Purba Bardhaman
Restoration work of Road Pavement damaged by PHE Department for their pipe laying work at Singur-Ugly Road from 0.050 km to 0.923 Km of Serampore Bridge Highway Sub-Division under Hooghly Highway Division no.-II during the year 2024-25.
Link Road from STKK to Borail from 0.00 kmp to 0.92 kmp repairing work in stretches with patching potholes PC SC clearing jungle cutting kutcha drain of Bansberia Highway SD- I under Hooghly Highway Division -II in Hooghly during 2026-27
Cleaning rubbish from CD deck and cleaning of weep holes and hume pipe along with road side earthen drain cleaning on various roads of Ramjibanpur Highway Sub-Division under Burdwan North Highway Division in the dist of Purba Bardhaman during........
Repair and Mtc of Chatumother Health Center Road from 0.00 Kmp to 7.50 Kmp (Different stretches) by providing 20mm thick premix surfacing, Seal Coat (Type-B) etc. under Purulia Highway Sub-Division of Purulia Highway Division during the year 20-21.
Kulgachi to Bernia Road from 8.00 Kmp to 10.37 Km Emergent Restoration and Repairing work in different stretches with potholes repair under Plassey Highway Sub Division under Nadia Highway Division No.-I in the District of Nadia during the year
Tamba-Illchoba Road at 1.00kmp-replacing of 1 no old damaged brick culvert by construction of new Single Cell- 4.00m x 3.00m R.C.C box culvert under Bansberia Highway Sub Division No-II under Hooghly Highway Division No-II, P.W Roads Directorate
Dewatering of water logging from different chainage at Haldiram Junction from ch. 6.15 kmp. to 6.50 kmp. on K.N.I. Avenue during monsoon under Baguiati Highway Sub Division of Barasat Highway Division No-I. in the Dist. of North 24 Parganas
Badulia Khandaghosh Road (VR)-Patch Repair works from 6.00 kmp to 7.00 kmp, 9.00 kmp to 10.00 kmp and 15.00 kmp to 17.375 km in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte.
Repair and maintenance work in stretches during monsoon period of Monteswar-Dainhat Road (SH-15) from 0.00 Km to 6.00 Km and 19.00 Km to 26.20 Km under Katwa Highway Sub-Division of Burdwan North Highway DivisioninthedistofPurba Bardhaman..(2nd Call)
Patch repairing work at different stretches from 1.60 km to 3.00 kmp of TarapurHealth Centre to Parulia Via Budhigram Road under Sainthia Highway Sub - Division of Birbhum Highway Division -I in the District of Birbhum during the year 2025-26
Rasulpur-Khandaghosh-Chakpurohit (RKC) Road (SH 8)-Urgent repair and maintenance works from 10.00 kmp to 14.00 kmp in stretches- under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba
Badkulla-Kulgachi Road from 0.00 km to 4.00 km, Patch repairing and restoration work in different stretches under Krishnagar Highway Sub-Division No-II of Nadia Highway Division No-I in the district of Nadia during the year 2026-2027
Dressing and Chilchalling of road side flanks and Divider from Ch 3.30 Km to 7.59 Km of Muragacha Kalyani Road of Kalyani Highway Sub-Division under Nadia Highway Division No II in the District of Nadia during the year 26-27
Rampurhat Tarapith Road from ch 0.00km to 6.00km and Tarapith Atla Road from ch 0.00km to 2.617km, patch repairing work in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division- I, in the district of Birbhum, during the year 2025
Sagrai Raina road Repair and Maintenance works form 9.00 kmp to 11.00 km in stretches under Sadarghat Highway Sub Division No-1 of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the year 2022-23
Attagarh Shaktigarh Road (MDR), Repairing Work from 0.00 km to 2.50 km in Patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2024-25
Maintenance and repairs to Kashemnagar Natunhat Shreekhanda Road (KNS-II) from 5.00 kmp to 7.00 kmp in stretches under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22.