Loading…
Loading…
11,133 results • Best match
Stainless steel lettering HMC Logo on Biswa Bangla Globe and repairing of drain pit, grill, priming and colouring work at Bholanath Chakraborty Sarani (Drainage Canel Road) near crossing of Kona Expressway within H.M.C. Area.
Development of Alipur Rabindra Nagar Dr. Ambedkar Mission Uddyan and Rabindra Nagar Sishu Udyan and Beautification beside Nayanjuli near Belgharia Expressway in Ward No-31 for Green City Mission under North Dum Dum Municipality
Emergent patch repairing, maintenance work at Jaydev Kenduli Illambazar road from 3.5 km to 4.5 km and 5.5km to 6.5 km( in streaches) under Illambazar Highway Sub-Division of Birbhum Highway Division. No-II, PW(Roads) Dte. in the District of birbhum
Kashemnagar Natunhat Shreekhanda Road from 5.00 kmp to 8.00 kmp and 17.00 km to 28.50 km, Repairing by Bituminous Pot-holes and topping with Seal Coat under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the district of Purba
Patch repairing and maintenance work from 78.00 Km to 84.00 Km, from 85.00 Km to 88.00 Km and from 93.00 Km to 94.00 Km of Ramjibanpur-Ketugram-Katwa Road (SH-6) under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the.........
Repairing work of NH2 by pass to Naity road via Gobra R.S. from 1.00kmp to 4.44kmp by repairing potholes, WBM, concrete paver block, 20mm PC, seal coat etc(in stretches) of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No.-II,
Restoration of road embankment by Bullah Pilling of Ramjibanpur-Ketugram-Katwa Road (SH-6) from Ch. 95.50 km to 95.62 km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the District of Purba Bardhaman during the year 23-24
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 5.15 6.50 kmp. from both side of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No I for the 1 yr.
Repairing work of Rukunpur - Ramkrishnapur road from1.00 km to 2.50 km, 3.00 km to 5.00 km, 6.00 km to 8.00 and 9.00 km to 10.00 km under Berhampore Highway Sub-Division of Murshidabad Highway Division No-I, during the year 2023-2024
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 2.00-3.15 kmp. from both side of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of on
Re-construction of left side wing wall (towards Gotan) of Sanknara Bridge at 4.80 km of Raina Damuniya Road under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division in the district of Purba Bardhaman during the year 2025-26
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 2.00-3.15 kmp. from both side of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of one yr
Patch repair work in stretches of Katwa Karui Road from 2.30 Km to 4.50 Km and 5.30 Km to 6.00 Km, under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Dressing and Chilchalling from 0.00 Kmp. to 10.00 Kmp. and Potholes Repairing with Seal Coat from 0.00 Kmp to 5.80 Km. of Dhubulia Mayapur Road under Krishnagar Highway Sub Division No. I of Nadia Highway Division No.I in the District of Nadia
Repair and Rehabilitation of minor bridges of Ramjibanpur Ketugram Katwa Road (SH-6) at ch. 90.20 Km, 90.60 Km, 92.20 Km, 93.20 Km and 94.70 Km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman du
Construction of Box Culvert (3 x 3 - 1 cell) at 0.500 KM of Nadanghat Bus Stand Bazar Link Road under Nabadwip Highway Sub Division of Burdwan South Highway Division, in the district of Purba Bardhaman in the District of Purba Burdwan. (1st Call)
Construction of a 2m X2m Box Culvert at Baidyapur more at 0.00 kmp of Kalna Baidyapur road of Kalna Highway Sub-Division under Burdwan South Highway Division In the Dist. of Purba Bardhaman during the year 2021-22 (2nd Call) (Non plan)
Patch repair work in stretches of Katwa-Karui Road from 2.00 km to 4.00 km and 11.00 km to 13.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Repairing of potholes and distress of Nimtita Aurangabad Road Ch 0.00 Km to 0.3 Km, 0.8 Km to 1.00 km, 1.20 km to 1.40 km and 1.70 km to 2.00 km under Raghunathganj Highway Sub-Division under Murshidabad Highway Division No-I.
Mtc. and repair (in stretches) to Ramjibanpur-Palita-Palitpur-Natunhat Road (SH-7) from 118 to 120 Kmp under Bhatar Highway Sub-Division No. -I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year22-23 (2nd Call)
Restoration of Road edge damaged due to laying of pipes by PHE Dte. at Hatugunj Usthi Road from 0.00 kmp to 8.34 kmp in stretches of Diamond Harbour Highway Sub-Division under Diamond Harbour Highway Division in the district of South 24 Parganas
Jhalda-Bagmundi Road from 0.00 to 9.00 Kmp in stretches maintenance and repair work (by providing potholes repair, 20 mm P. C. and Seal Coat Type-B etc. under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia.
Patch repairing work from chainage 0.00 kmp to 2.00 kmp and 3.00 kmp to 6.00 kmp in stretches of Murarai Health Centre Road under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2025-26
Emargent Repairing Works by pre coated chips, stone metals, cutting kutcha drain etc at different roads under section-I and II of Bansberia Highway Sub-Division No-II of Hooghly Highway Division No-II in the district of Hooghly during the year
Replacement of Expansion joint and Wearing course of the Bridges (NDA/PR/H1/KRISH_NABAD/MIN/13/2L) at 12.876 Km. of Krishnagar- Nabadwip Dham Road under Krishnagar Highway Sub-Division No.-I of Nadia Highway. Division. No-I in the Dist. of Nadia
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15 5.15 kmp. from Airport flank of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division No I for the period 1 yr.
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 1.00 2.00 kmp. from both side of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division No. I for the period of o
Repair and maintenance of Damda-Chakoltore-Daradi-Kenda-Manbazar Road from 8 to 11 Kmp by providing 20 mm PC, SC Type-B etc. under Purulia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Restoration of Pandua Kalna Road from 12 kmp to 17 kmp of Bansberia Highway Sub-Division No-II in connection with the laying of Pipe Line by PHE under Hooghly Highway Division-II, in the district of Hooghly during the year 2022-23.
Repair and Maintenance of Bispuria Bankura Boarder Road from 0.00 Kmp to 4.50 Kmp (Different stretches) by Pothole repairing, 20mm thick P. S., S. C. (Type-B) etc under Purulia Highway Sub-Division of Purulia Highway Division during the year 2020-21.
Patch repairing work from chainage 0.00 kmp to 2.00 kmp and 3.50 km to 7.00 km in stretches of Murarai Health Centre Road under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2025-26
NH-2 to Durgapur Barrage road emergent patch repairing work from 0.00 to 1.00 km and 2.50 km to 4.00 kmp under Durgapur Highway Sub-Division of Asansol Highway Division,P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year22-23
Sautanchak Tengrakhali road from 0.00 km to 5.00 km patch repair work of damaged blacktop portions by WBM Gr II repairing Potholes 20 mm PC Seal Coat Type B etc. under Tamluk Highway Sub Division of Tamluk Highway Division in the Di
Aherbelma Pahalanpur Road (MDR) Patch Repair works from 2.00 kmp to 5.00 kmp and 12.00 kmp to 14.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte In the district of Purba Bardhaman.
Arbetai- Sahapara Road from 2.00 km to 5.00 km and 7.00 km to 10.00 km for Patch repairing and maintenance work in different stretches under Krishnagar Highway Sub Division No.-I under Nadia Highway Division No.-I in the District of Nadia
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 5.15 6.50 kmp. from both side of KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I for the 1yr
Repair and Rehabilitation of Subgachhtala Bridge at 5.10 Km of Joypur-Khalna-Mukundadighi Road with a Link to Old Khalna Bus-Stand of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year of 2024-25.
Rain damaged repair of Link Road from Panskura Station to Panskura Durgachak Road from 0.43 km to 1.485 km by thorough surfacing under Tamluk Highway Sub Division of Tamluk Highway Division in the District of Purba Medinipur during the year 2022 23
Patch repairing work from chainage 0.00 kmp to 3.00 kmp and 7.00 km to 9.00 kmp in stretches of Bahara Belia Road under Sainthia Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2025-26.
Kashemnagar-Natunhat-Sreekhanda Road (KNS-II) from Ch. 15.00 km to 20.00 kmp of Mtc. and Repairing potholes topping with seal coat (Type-B) under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman
Emergent restoration of Flank with Eucaliptus Bullah Pilling at Pond side of STKK to Patuli Railway Station Road at Ch. 0.40 km to 0.57 km (Right Side) under Katwa Highway Sub-Division of Burdwan North Highway Division in the District of PB
Emargentreparing work of different roads in patches by pre coating stone aggregates under Sec -III and IV of Bansberia Highway Sub-Division No. - I , Under Hooghly Highway Division No-II P.W( R) Dte. in the District Of Hooghly during the year 2023-
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 5.15-8.05 kmp. from both side of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No I for the Six
Dhubulia Belpukur road from 0.00kmp to 1.0kmp and from 1.50kmp to 4.0kmp emergent patch repairing work in different stretches under Krishnagar Highway Sub-Division No-I of Nadia Highway Division No.-I in the District of Nadia during the year 2024-20
Khejuri Heria Road from 0.000 Km to 16.000 Km and 18.000 Km to 22.000 Km patch repairing work by repairing potholes, 20mm Premix Surfacing, Seal Coat (Type B) and brick stitching under Contai Highway Sub Division of Tamluk Highway Division in t
Emergent Construction of a diversion road for deviation to traffic from a severely distress bridge at 12th km. of Bhatar Bonpas road under Bhatar Highway Sub-Division No. -I of Burdwan North Highway Division, P.W.D. Roads Directt. in the dist of Pur
NH-34 (Mira) to Kaliganj Health Centre Road from 1.00 Kmp. to 4.00 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Krishnagar to Nabadwipghat Road from 6.00km. to 11.30 km. Emergent Patch repairing work with potholes, 20 mm thik P.C. and S.C. etc. (in stretches) under Krishnagar Highway Sub Division No. I of Nadia Highway Division No. I in the District of Nadia
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15-5.15 kmp. from Airport flank of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of one
Thorough Repairing of STKK Road to Dumurdaha Rly Stn. Link Road from 0.420 km to 1.00 km by WBM Concrete paver blocks under Bansberia Highway Sub Division II of Hooghly Highway Division II in the District of Hooghly during the year 2024 2025