Loading…
Loading…
11,176 results • Best match
Guskara Kashemnagar Road from 3.00 kmp to 9.00 kmp, Repairing by Bituminous Pot-holes and topping with Seal Coat under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Patch repairing and maintenance work from 0.00 Km to 3.00 Km of Katwa Town Link Road and from 0.00 Km to 1.00 Km of Gangatikuri Station Link Road under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the district of Purba.......
Manikhira CoOperative to Sutia Bazar Road from Ch. 0.00 Kmp to Ch. 4.00 km, Emergent Patch Repairing work in stretches under Bongaon Highway Sub-Division of Barasat Highway Division No. II, Govt of West Bengal in the District of North 24 Parganas.
Dhubulia Belpukur Road from 0.00 kmp. to 1.00 kmp. and 3.00 kmp. to 4.00 kmp. (in stretches) by Emergent Repairing of Potholes with Seal Coat under Krishnagar Highway Sub Division No.I under Nadia Highway Division No. I in the District of Nadia
Surface Repairing work of damaged road surface (in patches ) of Dignagar Badkulla Road from 3.500 km to 5.400 km of Ranaghat Highway Sub-Division under Nadia Highway Division II, P. W.(roads) Directorate in the District of Nadia, during the year25-26
Repairing work of damaged road surface (in patches) from 9.400 km to 10.900 km of Dakshin Belepara to Badkulla Palpara Road under Ranaghat Highway ub-Division of Nadia Highway Division-II, in the District of Nadia, during the year 2025 2026. (2nd C
Pandua-Kalna Road From 15.00 kmp to 16.00kmp and 17.00 kmp to 20.00 kmp, Repairing work by WBM, Repairing potholes, 20mm. Premix Carpet, Seal Coat etc. (In patches) of Bansberia Highway Sub Division No-II under Hooghly Highway Division-II in the dist
Construction of 1200 mm dia NP4 Double Barrel Hume Pipe Culvert by replacing Damaged Hume Pipe Culvert at Ch. 9.79 Km of Balgona Guskara Mankar Road under Bhatar Highway Sub-Division-II of Burdwan North Highway Division in the dist of Purba Bardhaman
Akui-Torkona-Mogolmari Road (MDR)-Urgent Patch Repair works from 4.00 kmp to 6.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division in the district of Purba Bardhaman during the year 2025-26. (2nd Call)
Bongaon-Jhowdanga-Panchpota Road from 4.00 Kmp to 5.60 Kmp, 7.60 kmp to 11.20 kmp and 14.20 kmp to 17.00 kmp, Emergent Patch repairing work in stretches under Bongaon Highway Sub-Division of Barasat Highway Division No. II, in the District of North
Temporary Safety measures of different Weak Bridges and along with repairing of approach road from 2.00 kmp to 6.00 kmp of Monteswar-Dainhat Road (SH-15) under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bard
Emergent potholes repair work for Rajinagar Sarbangapur road from 0.00 kmp to 2.00 kmp, 4.00 kmp to 7.00 kpm, 10.00 kmp to 12.00 kmp (in small stretches) under Berhampore Highway Sub-Division of Murshidabad Highway Division No-I during the year 2023-
Protection of Road side flank with Eucaliptus Bullah piling and small PCC Guard wall at the side of Flank at 3rd Km of Monteswar - Dainhat Road (SH-15) of Katwa Highway Sub-Division under Burdwan North Highway Division in the district of PB
Floor apron with curtain wall at both upstream and downstream side of Six Cell Box Bridge Chatua Bridge at 21.40 Km of Jhalda Bagmundi Road under Balarampur Highway Sub-Division of Purulia Highway Division in the Dist of Purulia during 21-22.
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15-5.15 kmp. from Kolkata flank of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I for the period of one
Day to day sweeping the main carriageway service road footpath and removal disposal of waste materials from 0.0 1.00 kmp. from both side of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division No I for the period of 1 year
Arbetai- Sahapara Road from 0.00 km to 2.00 km and from 5.00 km to 9.00 km for Patch repairing and maintenance work in different stretches under Krishnagar Highway Sub Division No.-I under Nadia Highway Division No.-I in the District of Nadia
Repairing and maintenance work of Balgona-Guskara-Mankar Road (SH-14) from 6.00 kmp to 7.50 km in stretches under Bhatar Highway Sub-Division No. II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Bituminous Patch repairing of Bhatar Samanti Road from 0.00 kmp to 3.00 kmp and 5.00 kmp to 7.00 kmp under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022_23. (2nd Call)
Karjona-Muratipur-Natunhat Road (SH-7) within Ch.- 9.00 kmp to 10.00 kmp, Protective work by Boulder Sausage Crate with back filling by dept. borrowpit earth under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the district PB
STKK to Khamargachi Feeder road from 0.00 kmp to 1.23 kmp in Stretches Patch repairing work by repairing Pot holes PC SC WBM and ICPB of Bansberia Highway Sub Division I under Hooghly Highway Division II in the District of Hooghly during the
Restoration work of road damaged due to laying pipeline under JJM project of PHE Dept at Debagram Katwaghat Road from 0.00 Kmp to 17.40 Kmp , under Plassey Highway Sub-Division under Nadia Highway Division No.-I in the District of Nadia during the
Re-Construction of 1.00m. span slab culvert (replaced by old and broken slab culvert ) at ch. 0.700km of old Kalna Katwa Road ( ODR) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year
Patch repairing work from 2.00 km to 12.24 km in stretches and shoulder protection work at 3.50 km of Murarai Mitrapur Road under Rampurhat Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Alangiri Bilbara Kosbagola Road Patch repairing of damages due to incessive rain fall and Yass from 0.00 Km to 7.00 Km by repairing potholes, 20 mm PC and Seal Coat under Contai Highway Sub-Division of Tamluk Highway Division in the District o
NH-34 Gadamarahat to Mondouri Road. From 0.00 kmp to 2.071 kmp and 3.704kmp to 6.665 kmp- Emergent potholes repair in stretches under Habra Highway Sub-Division of Barasat Highway Division No. II in the district of North 24 Parganas (2nd Call)
Maintenance of hedges and trees from 4.00 kmp - 8.00 kmp. of K.N.I Avenue (VIP Road) covering the full width of the Right of Way (ROW) including footpath, road side flanks and middle verge under Baguiati Highway Sub Division of Barasat Highway Divis
Plaseey Betai Road from 2.00 Kmp to 4.00 Kmp and from 6.00 Kmp to 8.00 Kmp emergent restoration and repairing work in different stretches with potholes repair under Plassey Highway Sub-Division of Nadia Highway Division No.I in the District of Nadia
Restoration of road embankment by Bullah Pilling of Ramjibanpur-Ketugram-Katwa Road (SH-6) from Ch. 96.50 km to 96.58 km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the District of Purba Bardhaman during the year 23-24
Repairing and Rehabilitation work of existing 3 nos RCC Bridges over river Khari at 7.396 Km, 7.726 Km and 7.793 Km of Bhatar - Samanti Road under Bhatar Highway Sub-Division II of Burdwan North Highway Division in the district of Purba Bardhaman
Emergent construction and maintenance of road side drain at the junction of Kulgachi Barnia Road and Debogram Tehatta Road at Ch. 13.70 Km. for drainage of water from the road surface under Plassey Highway Sub Division of Nadia Highway Division No. I
Badulia-Khandaghosh road (VR) Urgent pre monsoon patch repair works from 0.00 Kmp to 4.00 Kmp under Sadarghat Highway Sub-Division No-I of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the year 2022-2
Patch repairing work from 18.00 km to 25.50 km and 28.00 km to 30.80 km in stretches of Mollarpur Majhipara Bolpur road under Mollarpur Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Mtc and patch repair of Balgona Guskar Mankar Road from Ch 0_00kmp to 2_00kmp 4_0kmp to 5_0kmp and 19_15km to 20_10km of Bhatar Highway Sub Division No_II under Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Day to day sweeping the main carriageway and removal disposal of waste materials from both flank of VIP Flyover from 2.95-5.15 kmp. of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No-I for the period of one year.
Mtc. And Rep. of Singerkone to Pandua Kulti road via Badla from 0.00 kmp to 2.00 Kmp by pot holes repairing ( in stretches) 20 mm thick P.C. and type B seal coat of Kalna Highway Sub Division under Burdwan South Highway Division
Mukundadighi - Bainan - Dharmaghata Road from 0.00 Kmp to 2.20 Kmp., Surfacing Work under Uluberia Highway Sub-Division of Howrah Highway Division in the district of Howrah,PWRD (Under Head 25-5054-03-789-00-004-53-00-V of State Development Schemes
Construction of New Hume Pipe Culvert at 1.620km of Transport Road under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2024-25. 2nd call of eNIT-06/24-25/02
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 2.00-3.15 kmp. from both side of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of six mnt
Nabadwip Municipal Link Road from 0.00 Km to 2.70 Km. for patch Repairing and Maintenance work under Krishnagar Highway Sub-Division No.-1 of Nadia Highway Division No.-I, P.W. (Roads) Directorate in the District of Nadia during the year 2024-2025.
Maintenance of hedges and trees from 0.00 kmp 4.00 kmp. of K.N.I Avenue VIP Road covering the full width of the Right of Way ROW including footpath, road side flanks and middle verge under Baguiati Highway Sub Division of Barasat Highway Divis
Patch Repairing Works to Feeder Rd. from S.T.K.K Rd. to Khamargachi Feeder Rd. from 0 to 1 km by WBM, Priming Coat, Repairing Potholes, 20mm P.C, S.C, Paver Blocks etc. In patches under Bansberia Highway Sub Division I under Hooghly Highway Division-
STKK (SH-6) road from 10.00km to 17.00km- Repairing work in patches by providing potholes with open premixed carpet an seal coat of Bansberia Highway Sub-Division No.-I under Hooghly Highway Division No.-II, in the district of Hooghly during the year
Construction of barriar wall for protection of road side Govt. land at 18th Km. of Plassey - Betai Road near Palashipara Bustand under Plassey Highway Sub-Division of Nadia Highway Division No -I, in the district of Nadia during the year 2025-26.
Repairing of Jhalda Bagmundi Road from 0 to 4 Kmp on patches by repairing potholes 20 mm premix carpet seal coat Type B etc of Balarampur Highway Sub-Division under Purulia Highway Division in the District of Purulia during the year 2021-22.
Re-construction of 1.50m span RCC slab culvert (replaced by old and broken slab culvert) at Ch. 1.40 kmp of Karajgram Bankapasi Road (MDR) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman FY 22-23
Urgent repairing of Sarishahat-Nainan Road from 0.00 Kmp to 3.00 Kmp, 4.00km to 6.50km and 7.50km to 8.50km under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2021-2022.
Urgent Repair Works of Majhergram Malamba Road (MDR) from 2.00 km to 8.00 km in Patches, under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24
Egra Bypass Road from 0.00 km to 0.975 km repair by patch WBM potholes thorough 20 mm PC and Seal Coat etc under Contai Highway Sub Division with in Tamluk Highway Division in the District of Purba Medinipur during the year 2022 2023
Patch repairing work from 12.00 km to 22.35 km in stretches (Excluding Mastic Zone 22.224 km to 22.230 km) of Bahina More to Andi Road via Kamraghat under Mollarpur Highway sub Division of Birbhum Highway Division-I during the year 25-26