Loading…
Loading…
11,181 results • Best match
Emeregent Repairing Work of surface in 2.000 kmp to 2.350 km of Jangipara Borol Road, under the jurisdiction of Serampore Highway Sub-Division of Hooghly Highway Division-I, P.W.(Roads) Dte, in the District of Hooghly in the year 2025-2026.(2nd Call)
Surfacing work by 20 mm P.C and Seal Coat (Type B) along with WBM potholes in different stretches of Bhagwanpur Paschimbar Road from 2.500 Km to 4.000 Km under Tamluk Highway Sub Division of Tamluk Highway Division in the District of Purba Medinip
Emergent repair and maintenance of Guskara-Kashemnagar Road (GK) within ch. 0.00 kmp to 5.00 kmp during the monsoon period under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during theyear 2025-26
Restoration of Tamba- Kamarpara Road from 0.0 km to 6.62 km of Bansberia highway Sub- Division-No.ll in connection with the laying of Service Connection Pipe Line by PHE under Hooghly Highway Division-ll in the district of Hooghly during the year 20
STKK to Patuli Railway Station with a link to Patuli Bazar Road (ODR) from 0.00 Km to 6.00 Km, Strengthening work under Burdwan North Highway Division of Western Highway Circle No. I, West Zone, P.W.(Roads) Directorate in the dist. of Purba Bardhaman
Repairing and Maintaince work of Akui-Torkona-Mogalmari Road from 1.50 km to 6.50 km and 8.00 km to 10.00 km in stretches under Sadarghat Highway Sub Division-I of Burdwan South Highway Division in the district of Purba Bardhaman during 2026-2027.
Bagnan Mankur Road, At Chainage 0.20 Km, 0.40 Km, 0.60 Km, 1.3 Km, 1.5 Km, 1.8 Km, Base Layer Rectification Work in Patches under Uluberia Highway Sub Division of Howrah Highway Division in the District of Howrah during the year 2025-26
Emergent restoration work in connection with the damages due to laying of Pipe line by Barasat Arsenic Division, PHED at chainage 1.70Km(R/S) of Old Satkhira Road under Basirhat Highway Sub-Division of Barasat Highway Division No.I in dist N 24 PGS
Maintenance of road by clearing and grubbing road land , dressing and chillchalling road flanks of STKK Road from 18.00 kmp to 33.88 kmp of Bansberia Highway Sub-Division No.-II under Hooghly Highway Division No.-II P.W.(Roads) Dte. in the District
Aherbelma Pahalanpur Road (MDR) Repair and Maintenance works from 0.50 km to 1.00 kmp, 4.50 km to 6.00 kmp and 14.00 kmp to 16.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte.
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 0.00-1.00 kmp. from both side of KNI Avenue under Baguihati Highway Sub Division of Barasat Highway Division NoI for the period of 1 yr
Mtc. and repairing work to Karjona Muratipur Natunhat Road (SH-7) from 3kmp. to 6kmp. and 7kmp to 11kmp (in stretches) under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022_23.
Installation of Road Safety Measures for Black spot at chainage 14.40 Km (Nagar Petrol Pump), Chainage 14.909 Km (Murcha More) and chainage 26.50 Km (Panchgram More) of Kuli-Moregram Road (SH-7) under Kandi Highway Sub-Division of Msd Highway Divn-II
Balagarah -Feeder Road from 1.00 km to 3.12 km Emergent repairing work in patches by paver block, pot holes repairing, and premix seal coat of Bansberia Highway Sub-Division-I under Hooghly Highway Division-ll in the Dist. of Hooghly during year 2023
Bridge (Lochan Das Setu) over river Ajoy from Ch. 122.693 Km to 123.251 Km of Ramjibanpur-Palita-Palitpur-Natunhat Road (SH-7) Mtc. and Repairs work of wearing coarse in stretches under Bhatar Highway Sub-Division No. I of Burdwan North Highway......
Repair and rehabilitation of distressed bridge at 2.30 KM of Nalikul on BTC Road to Bandipur Bazar to Gaja Bakultala Link Road under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No.-II, in the District of Hooghly, during the ye
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 6.50 8.05 kmp. from both side of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No I for the 1 yr.
Maintenance and repair works in stretches of Kashemnagar-Natunhat-Sreekhanda Road (KNS-II) from ch. 20.00 kmp to 23.00 kmp under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025..
Footpath repairing and others allied work on Kona traffic OFC to Manditala Road from 0.00 km to 0.210 km and Road Around Nabanna from 0.400 km to 0.600 km of Howrah Highway Sub Division under Howrah Highway Division in the Dist. of Howrah.
Kerb Painting work and repairing of footpath on Foreshore Road to Railway museum via Grand Foreshore Road and office of the Commissioner of Police from km 0.00 to km 1.55 under Howrah Highway Sub Division of Howrah Highway Division in the District
Urgent repairing work of Dubrajpur Hetampur Feeder Road from 0.00 kmp to 3.57 kmp and Link Road to Hetampur Rajbati from 0.00 kmp to 1.20 kmp (in patches) under Suri Highway Sub-Division of Birbhum Highway Division-II in the District of Birbhum.
Majdia Banpur Road from 0.00 km. to 7.50 km. emergent patch repairing work in different stretches with potholes repair including 20 mm PC and SC under Krishnagar Highway Sub Div No. II under Nadia Highway Division No. I in the District of Nadia
Aherbelma Pahalanpur Road(MDR)Repair and maintenance works from 16.00 kmp to 18.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 23-24
Patch Repairing work by mending potholes PC SC WBM from 0.00 km to 2.00 km of Balagarh CDP Road and 0.00 km to 1.30 km of Sirpur Bazar Road In Stretches of Bansberia Highway Sub Division I under Hooghly Highway Division II
Repair and Maintenance work of Kashemnagar-Natunhat-Sreekhanda Road (KNS-II) ch. from 0.00 kmp to 5.00 kmp and 12.00 Kmp to 17.00 Kmp during the monsoon period under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist.....
Dewatering of water logging from different places in between ch. 13.10 kmp. to 14.70 kmp. of Jessore road an airport slip road ch. 8.00 kmp. during monsoon under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of Nort
Ghoshpara Jagulia Road from Ch 17.10 Km to Ch 17.20 Km repairing and maintenance work with Interlocking Concrete Paver Block Pavement under Kalyani Highway Sub Division of Nadia Highway Division No II in the District of Nadia during the year 26-27
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 1.00-2.00 kmp. from both side of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of 1 yr
Mirzapur-Kaligram-Kusumgram-Nadanghat-Samudragarh Road (SH-8), Pre-monsoon Patch Repairing Work from 2.00 km to 7.00 km and 12.00 km to 17.00 km under Burdwan Highway Sub Division No-I of Burdwan South Highway Division in the dist of Purba Burdwan
Patch repairing work from 18.00 km to 23.50 km and 27.00 km to 31.30 km in stretches of Mollarpur Majhipara Bolpur Road under Mollarpur Highway sub Division of Birbhum Highway Division -I in the district of Birbhum during the year 2025-26.
Repair and maintenance work in stretches with Paver Blocks of Old Katwa Kalna Road from 9.20 Km to 11.50 Km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2026-27. (2nd Call)
Haringhata Gaighata Road from Ch 0.00 Km to Ch 0.050 Km repairing and maintenance work with Interlocking Concrete Paver Block Pavement under Kalyani Highway Sub-Division of Nadia Highway Division No II in the District of Nadia during the year 26-27
Repair and Maintenance work of Karjona-Muratipur-Natunhat Road ch. from 5.00 kmp to 9.00 kmp during the monsoon period under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2026-27.
Singerkone to Pandua Kulti Road via Badla road from 0.00 kmp to 1.20 km and 2.40 km to 3.60 km (in stretches) emergent maintenance and repairing work of Kalna Highway Sub Division under Burdwan South Highway Division during the year 2026-2027.
Manikhira Cooperative to Sutia Bazar Road from Ch. 0.00 Kmp to Ch. 4.00 Kmp, Emergent Patch repairing work in stretches under Bongaon Highway sub division of Barasat Highway Division No. II, Govt. of West Bengal in the District of North 24 Parganas.
Emergency Repairing work at ch. 20.15 km near Hazipur more of Arambagh Goghat Ramjibanpur Road (SH-7) under Arambagh Highway Sub Division under Hooghly Highway Division No. I, P. W. (Roads) Directorate, in the District of Hooghly daring 25-26 2nd Cal
Link road from GT road to Mogra Health Centre from 0.00 km to 0.48 km surfacing work with pot holes, PC,SC, of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II, In the District of Hooghly during The Year 2026 -2027.
Repairing work of Singur High School to Durgapur Exp. Way Via Dhirganj Road from chainage 0.00 km to 2.80 kmp under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No-II, in the Distrct of Hooghly , during the year 2026-27.
Repairing of potholes and Stitching of stretches of Amta Bridge Approach Road from 3.28 Km to 5.36 Km of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah in the year of 2025-26. (Under Head- Non Plan)
STKK Road (SH-6) from 53.00 kmp to 83.00 kmp Providing Road marking as Road Safety Measures on Speed Breakers under Nabadwip Highway Sub Division of Burdwan South Highway Division in the district of Purba Bardhaman during the financial year 2026-2027
Replacement of existing 900 mm dia Hume Pipe Culvert with 1000 mm dia NP4 Hume Pipe Culvert at 4.82 km of Link road connecting to Raina Damuniya road to Aherbelma Pahalanpur Road under Sadarghat Highway Sub Division-I of Burdwan South Highway Divn
Patch Repairing work from Ch.0.00 kmp to Ch.4.00 kmp and 6.30 km to 8.30 km in stretches of Kedar Roy Road under Mollarpur Highway Sub Division of Birbhum Highway Division- I, in the district of Birbhum during the year 2026-27
Patch repairing work from chainage 0.00 kmp to 1.00 kmp and from 10.00 kmp to 11.00 kmp in stretches of Sibagram Satpalsa Road under Sainthia Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2026-27
Patch Repairing work from Ch.2.00 kmp to 5.00 kmp and 5.50 Km to 7.00 Kmp in stretches of Takipur Kushmore Road under Rampurhat Highway Sub Division of Birbhum Highway Division- I, in the district of Birbhum during the year 2026-27
guardrail for highways Guardrail For Highways ( 116 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Type Guard Rail Set One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard) ; One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard), One set of WSS1BP: W-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Anchorage Plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 10 Nos. Hexagonal Headed bolts 4 Nos. The Length of Post 700mm (standard), One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2050mm (standard) 1/4, One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2600 mm (Long post), One set of WSS2BP: W-Beams 2 Nos. Posts with Base Plate 2 Nos. Spacers 4 Nos. Anchorage plat 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 950 mm (standard), One set of WDS1: W- Beams 2 Nos. Posts 2Nos. Spacers 4 Nos Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 1800mm (standard), One set of WDS1BP: W-Beam 2 Nos. Posts with base Plates 2 Nos. Spacers 4 Nos. Anchorage plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed bolts 8 Nos. The Length of Post 700 mm (standard), One set of TSS1: Threi-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Dome Headed Bolts 16 Nos. Hexagonal Headed Bolts 6 Nos. The Length of Post 2000mm (standard), One set of TDS1: Threi-Beams 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed 2/4 Bolts 32 Nos. Hexagonal Headed Bolts 12 Nos. The Length of Post 2000 mm (standard) ; DGSamp;D Drawing No. DGS&DG RAILWSS1 - DGSamp;D Drawing may be downloaded from the url https:dgserver.dgsnd.g ov.inrcDRG.Highway20 Rail.pdf - Compliance to DGSamp;D Drawing Yes - Read DGSamp;D Drawing and fully understood Yes - CONSTRUCTIONAL Length of Beam, (mm) 4318 Width of Beam 311 mm for W-Beam section 311 mm for W-Beam section, 505 mm for Thrie-Beam section Depth of Beam (mm) 83 - Thickness of Beam (mm) 3 - Mass of Zinc coating for W-Beam, PostSpace channel, Fish Tail Terminal, Bolt & Nut, washer (g/m2) 550 - CERTIFICATION ISI Marked HR Coil to IS:5986, latest, Grade 255, min. Yst 255MPa, T.S 520MPa, Elong., 17% Yes - Test Report for ISI marked HR Coil amp; Zinc Coating from Govt/NABL/ILAC accredited lab to prove conformity to the specification Yes - Test Report No and Date - - Name and Address of the Lab - - Test Report to be furnished to the buyer on demand Yes - * Bold specifications are the golden parameters. 3/4 Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 R Sekar 734007, Dett 1031 (I) ESPL CARE 532 SSTC C/O 99APO Teen Batti More Silliguri 116 15
guardrail for highways Guardrail For Highways ( 381 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Type Guard Rail Set One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard) ; One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard), One set of WSS1BP: W-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Anchorage Plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 10 Nos. Hexagonal Headed bolts 4 Nos. The Length of Post 700mm (standard), One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2050mm (standard) 1/4, One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2600 mm (Long post), One set of WSS2BP: W-Beams 2 Nos. Posts with Base Plate 2 Nos. Spacers 4 Nos. Anchorage plat 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 950 mm (standard), One set of WDS1: W- Beams 2 Nos. Posts 2Nos. Spacers 4 Nos Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 1800mm (standard), One set of WDS1BP: W-Beam 2 Nos. Posts with base Plates 2 Nos. Spacers 4 Nos. Anchorage plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed bolts 8 Nos. The Length of Post 700 mm (standard), One set of TSS1: Threi-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Dome Headed Bolts 16 Nos. Hexagonal Headed Bolts 6 Nos. The Length of Post 2000mm (standard), One set of TDS1: Threi-Beams 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed 2/4 Bolts 32 Nos. Hexagonal Headed Bolts 12 Nos. The Length of Post 2000 mm (standard) ; DGSamp;D Drawing No. DGS&DG RAILWSS1 - DGSamp;D Drawing may be downloaded from the url https:dgserver.dgsnd.g ov.inrcDRG.Highway20 Rail.pdf - Compliance to DGSamp;D Drawing Yes - Read DGSamp;D Drawing and fully understood Yes - CONSTRUCTIONAL Length of Beam, (mm) 4318 Width of Beam 311 mm for W-Beam section 311 mm for W-Beam section, 505 mm for Thrie-Beam section Depth of Beam (mm) 83 - Thickness of Beam (mm) 3 - Mass of Zinc coating for W-Beam, PostSpace channel, Fish Tail Terminal, Bolt & Nut, washer (g/m2) 550 - CERTIFICATION ISI Marked HR Coil to IS:5986, latest, Grade 255, min. Yst 255MPa, T.S 520MPa, Elong., 17% Yes - Test Report for ISI marked HR Coil amp; Zinc Coating from Govt/NABL/ILAC accredited lab to prove conformity to the specification Yes - Test Report No and Date - - Name and Address of the Lab - - Test Report to be furnished to the buyer on demand Yes - * Bold specifications are the golden parameters. 3/4 Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 R Sekar 734007, Dett 1031 (I) ESPL CARE 532 SSTC C/O 99APO Teen Batti More Silliguri 381 15
Khadside protective work at 12.45 Km of Peshoke-Mungpoo Road under Darjeeling Highway Division during 2019-20.mm
Maruganj VR 1.00 km to 2.00 km protection work under Coochbehar Highway Division in the district of Coochbehar,
Preventive measures against hazardous objects along Oodlabari-Kranti Road under Jalpaiguri Highway Division in the district of Jalpaiguri
Interior and Furniture works in connection with up gradation of InspectionBungalowatBolpurunderBirbhum Highway Division-II,intheDistrictof Birbhum.(2nd call)