Loading…
Loading…
11,187 results • Best match
Interior and Furniture works in connection with up gradation of InspectionBungalowatBolpurunderBirbhum Highway Division-II,intheDistrictof Birbhum.(2nd call)
Kulik Bridge over River Kulik at Bindol Bishnupur road rehabilitation of the bridges under Uttar Dinajpur Highway Division
Providing of Security guards for Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2022- 23.
Renovation work of Mungpoo Inspection Bungalow under Darjeeling Highway Division in the district of Darjeeling. Project Id PD242521981S000
Hiramoti Gurudebpur road from 0.00kmp to 2.40km surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri.
Construction of Community Toilet besides Highway near SRSV College at Kamalpur under Tilpara G.P. within Suri-I P.S.
Construction of Bituminous road from Basanti Highway (Kalitala More) to Joygram school under Minakhan GP within Minakhan Block
Road Safety Measures at different spots of Kandi-Bharatpur Road under Murshidabad Highway Division No.II during 2023-24
Construction of Toilet Room and repair of Bituminous approach Road at Kalyanpur Stackyard under Kandi Highway Sub-Division
Khalaigram-Khetifulbari Road from 5.00kmp to 13.00kmp, surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri
Pitani Bridge over river Pitani at 24th km of Kanki Goagaon road_rehabilitation work under Uttar Dinajpur Highway Division
Construction of Roller shed at Tilpara office compound under Birbhum Highway Division-II, in the District of Birbhum
Providing of Security guards for Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2024- 25.
Bondel Gate ROB, Rehabilitation work Under South 24 Parganas Highway Division in the District of South 24 Parganas
Permanent road restoration of Bombai Amtala More to Kalyani Highway via Duley Para ward no -32 and 33
Chopra Udrail Road Bridge at 6th KMP over Teesta Canal Rehabilitation and restoration under Uttar Dinajpur Highway Division
EEmergent repairing and renovation work to the office of the Assistant Engineer Bansberia Highway Sub Division No-I
Renovation of different site at the campus of Bankura Highway Division ie gate lighting and allied electrical works
Providing of Security guards for Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2020- 21.
Providing of cycle and motor bike shade at ground floor, Sarak Bhaban campus of Birbhum Highway Division-II,
Installation of High Mast Solar Light with Pole at Dhakshin Ghari beside Basanti Highway Dist North 24 parganas
Illambazar Haldar Sweet House to Illambazar High School And Highway More via Illambazar Hospital More under Illambazar Block
Fatapukur-Gadra road from 9.70km to 12.00kmp, surfacing work under Jalpaiguri Highway Division in the District of Jalpaiguri.
Construction of PCC protection work at 6.70 kmp of Nilganj-Santoshpur Road under Barasat Highway Division no - II.
Simlapal-Khatra Road, at ch. 17.60 km, Restoration work under Bankura Highway Division in the District of Bankura.
Providing of Security guards for Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2025 26
Construction of boundary wall around periphery of the land beside Barrackpore-Kalyani Expressway (Eastern Side), for setting up of proposed SWM facility of Panihati Municipality (600m approx.), at Mohishpota Mouza, under Bilkanda- I Gram Panchayat.
Clearing drainage congestion under the bridge of Kalyani Expressway in Ichapur Khal for a length 45 metre inMohanpur GPBarrackporeII Block PSBasudebpur DistNorth 24 Parganas Under Urban Drainage SubDivision NoI of Urban Drainage Division during the
ISI Marked HDPE/PP Bags For Packaging Foodgrains (Q3)
Cleaning, Jungle Cutting, removal of debris, water Hyacinth, weeds and floating materials time to time (as and when required) from Notun Rasta More to Kalyani Expressway in Ward No - 34 Within Panihati Municipal area for maintaining
Silt clearance and disposal of the same from Notun rasta More to Kalyani Expressway and Technovalves company to Apurba Nagar culvert ..............management of vector borne diseases and to ensure smooth drainage of water under Panihati Municipality
Procurement and installation of Pumps, construction of Pump room with proper safety arrangements, pipelines (Over ground and Underground) with intermittent catch-pits and other allied works on new Kolkata Bound carriageway of Kona Expressway at Garpa
Repairing of pot-holes and ditches by Paver Block and Cement Concrete work (RMC) to maintain pot-holes free road at Drainage Canal Road from Ichapur water tank to Kona Expressway under HMC ward no-42,43.
Supplying, fitting and fixing of new one layer crash barrier below the existing crash barrier on both sides at VVIP route of Vidyasagar Setu (Kolkata side viaduct, Howrah side viaduct and KONA Expressway), Kolkata, West Bengal.
Estimate of Supply and installation 3 set CC Camera with 12 nos 4MP COLOR VU AUDIO IP Camera at Nimtala Bus Stand XIN, Buddha Park High road More Towards Expressway, Around Buddha Park, under Kalyani Municipality.
Construction of Cement Concrete road and drain at Kona expressway from H/o of Ashok to H/o Dibendu Boral to H/o Tapas Patra to H/o Sushil Bag under HMC ward no-44 (BEUP)
DIVERSION OF 132 KV D/C RISHRA - LILUAH TRANSMISSION LINE IN BETWEEN TL NO- 33 and 34 NEAR DANKUNI FOR PROPOSED SIX LANE EXTENSION OF DURGAPUR EXPRESSWAY BY NHAI AND ALLIED WORKS ON TURN KEY BASIS
Improvement work of LED Street Lights from the crossing of Sastri Narendranath Ganguly Road and Chowdhury Para Lane to the crossing of Brojonath Lahiri Lane and Kona Expressway (Jana Gate) under Ward No-44 of H.M.C.
Cleaning, Jungle Cutting, removal of debris, water Hyacinth, weeds and floating materials time to time (as and when required) of Belghoria Expressway drainage channel within South Dum Dum Municipal area, for maintaining smooth drainage path throughou
Cleaning, Jungle Cutting, removal of debris....and floating materials time to time (as and when required) of Borrowpit adjacent to Belghoria Expressway within Dum Dum Municipal area, for maintaining ...throughout for 6(six) months. (2nd call).
Mtc. and Repairs work of Karjona-Muratipur-Natunhat Road (SH-7) ch. from 0.50 to 2.00 Km, 9.00 to 10.00 Km and 14.50 to 16.00 Km in stretches under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in thedistrict of PurbaBardhaman..
Maintenance and Rehabilitation Work of Culverts (5Nos.) and 1 No. Minor bridge at 0.10 Km, 1.80 Km, 2.65 km,5.50 Km, 6.00 Km and 6.90 Km of Shyampur - Shibpur Road of Uluberia Highway Sub-Division under Howrah Highway Division in the district of How
Emergent Re-Construction of a damaged double barrel Hume Pipe Culvert by a new double barrel 1000 dia NP4 Hume Pipe culvert at 19th km. of KNS-II road under Bhatar Highway Sub-Division No. -I of Burdwan North Highway Division, P.W.D. Roads Direc
Maintenance and patch repairing of Monteswar-Dainhat to Chandrapur HC link road of Balgona-Chandrapur Road from ch. 0.45 Km to 1.00 Km and Fulgram link road from 0.00 Kmp to 1.00 Kmp under Bhatar Highway Sub-Division No. II of Burdwan North Highway..
Surfacing work by 20 mm P.C and Seal Coat Type B along with WBM and potholes in different stretches of Bhagwanpur Paschimbar Road from 0.000 Kmp to 2.000 Kmp under Tamluk Highway Sub Division of Tamluk Highway Division in the District of Purba Medi
Mtc and Repair at Kashemnagar-Natunhat-Srikhanda road (KNS-II) from 22.5 km to 24 kmp (in stretches) and 27 kmp to 28.5 km (in stretches) under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the dist of Purba Bardhaman
Patch repairing work from chainage 2.00 kmp to 4.50 kmp and from chainage 5.00 kmp to 8.00 kmp in stretches of Tokipur Kushmore Road under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 24-25
Restoration of Tamba Kamarpara Road from 6 kmp to 6.62 kmp of Bansberia Highway Sub-Division No-II in connection with the laying of Pipe Line by PHE under Hooghly Highway Division-II, in the district of Hooghly during the year 2022-23. (2nd CALL)
Repair and mtc of Hura-Puncha Road from 10 to 18.00 Kmp Different stretches by providing 20 mm thick P.C. S.C Type-B etc under Purulia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22. (2nd Call)
Patch repair work of Hariharpara - Rukunpur road in stretches from 0.00 kmp to 1.00 kmp, 3.00 kmp to 3.50 kmp, 5.00 kmp to 6.00 kmp and 6.50.00 kmp to 7.00 kmp under Berhampore Highway Sub-Division of Murshidabad Highway Division No-I _2nd Call