Loading…
Loading…
11,133 results • Best match
Rampurhat Tarapith Road from ch 0.00km to 6.00km and Tarapith Atla Road from ch 0.00km to 2.617km, patch repairing work in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division- I, in the district of Birbhum, during the year 2025
Sagrai Raina road Repair and Maintenance works form 9.00 kmp to 11.00 km in stretches under Sadarghat Highway Sub Division No-1 of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the year 2022-23
Attagarh Shaktigarh Road (MDR), Repairing Work from 0.00 km to 2.50 km in Patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2024-25
Maintenance and repairs to Kashemnagar Natunhat Shreekhanda Road (KNS-II) from 5.00 kmp to 7.00 kmp in stretches under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22.
Uchalan Kaity Road (VR) Urgent Repairing of Four Numbers Culvert at 2.405 km, 3.050 km, 3.505 km, 5.310 km of Sadarghat Highway Sub Division No-I under Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman
Urgent patch repairing work of Jamar Health Centre (VR) from 0.00 km to 2.00 km and Link Road from Jamar H.C. to Hatgobindapur from 0.00 km to 1.14 km under Burdwan Highway Sub Division No-I of Burdwan South Highway Division
Rathtala Osmanpur Village Road from 1.00 km to 5.00 km emergent repairing and maintenance of Road Surface under Kalna Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman during the year 2026-2027
Balance work emergent Patch repairing work of Ghoshpara Jagulia Road from 15.50 Km to 17.00 Km except KMDA resturation area of Kalyani Highway Sub-Division under Nadia Highway Division No.II during the year 2025-26 in the District of Nadia.
Habra Kumra Road from 0.00 Km to 1.40 km and 9.00 Km to 10.68 km. Emergent Pot Holes repairing work in stretches under Habra Highway Sub - Division under Barasat Highway Division No. II in the District of North 24 Parganas
Tilpara Massanjore Road from 0.00 kmp to 3.00 kmp and from 6.50 kmp to 8.00 kmp Patch repairing work in stretches under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2024-25.
Gantimore to Gandharbapur Road (VR) Pre monsoon repair works from 3.00 kmp to 4.150 kmp and 5 nos Link road Total length 1.950 km in patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte
Routine maintenance of DANKUNI ROB over Howrah-Bardhaman Chord Line at Dankuni, of Dist. Hooghly of Serampore Bridge Highway Sub-Divn. under Hooghly Highway Division No.-II, P.W. (Roads) Directorate during the year 2023-24 in the district of Hooghl
Abdulpur - Hariharpara Road from chainage 0.00 km to 4.10 kmp, Restoration work of road flank and road on the damaged portion which is formed by PHED pipe laying in stretches under Berhampore Highway Sub-Division of Murshidabad Highway Division No-I
Dewatering of water logging at 7.5 kmp. on Patipukur - Rajarhat Road and near Rajarhat Choumatha on Dum Dum - Lauhati Road during monsoon under Baguihati Highway Sub-Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Maheshganj Nabadwip Ghat Road from 0.80 km. to 1.80 km. Patch Repairing and Maintenance work under Krishnagar Highway Sub-Division No.-1 of Nadia Highway Division No-I, P.W.(Roads) Dte. in the District of Nadia during the year 2026-27
Restoration of Road surface below the Northern side of VIP road station of proposed Dumdum New Garia Metro corridor on K.N.I. Avenue (V.I.P. Road) of Airport flank main carraige way under Baguihati Highway Sub Division under Barasat Highway Divn I
Repairing of Damaged Bituminous Road Surface in patches of Birnagar Aranghata Road from 3km to 3.70km under Ranaghat highway Sub-Division of Nadia Highway Division No-II PW Roads Directorate in the district of Nadia during the year 25-26
Repairing of footpath Slab, RCC railing etc. of Bridge over river Bidyadhari at Chaitalghat at 20Km chainage of Taki-Murarisha-Bhebia-Chaital Road under Basirhat Highway Sub-Division of Barasat Highway Division No.I in the district of N 24-Pgs.
Flanks protection work during monsoon by dressing and chilchalling with cutting kutcha drain at Margram Sarda Road from 0.00kmp to 13.40km under Rampurhat Highway Sub-Din of Birbhum Highway Division-I in the district of Birbhum during the year 26-27
Conducting Traffic Census and Axle Load Survey and Topographic Survey at Haripur Baganchra Road from 0 KM to 4.66 KM of Ranaghat Highway Sub-Division under Nadia Highway Division NoII PW(Roads) Dte in the district of Nadia during 26-27
Emergent patch repairing an maintenance work at Illambazar banashanka road from 5.00 km to 7.50km (in streaches) under Illambazar Highway Sub-Division of Birbhum Highway Division. No-II, PW (Roads) Dte. in the District of birbhum during the year 2026
NH-34 Mira Plassey to Kaliganj Health Centre Road from 0.00 kmp to 8.00 kmp, emergent installation of Rumble Strip, speed breaker By Bituminous of Plassey Highway Sub-Division under Nadia Highway Division No-I, in the district of Nadia.
Swarupganj U.B.I more to Anandabas Road from 1.50 km to 3.50 km and 4.60 km to 5.10 km, patch repairing work in stretches of Krishnagar Highway Sub-Division No.-I under Nadia Highway Division No-I, in the district of Nadia.
Plassey Betai Road from 0.00 kmp to 1.00 kmp, 9.00 kmp to 10.00 kmp , 19.00 kmp to 21.00 kmp, Potholes Repairing work in different stretches of Plassey Highway Sub-Division under Nadia Highway Division No-I, in the district of Nadia.
Restoration of blacktop surface by 80 mm thick concrete paver block in the distressed zone of Kamarkundu ROB Service road L S Tarakeswar End of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghl
Emergent repairing of potholes in different stretches by brick stitching of Ghateswar Road Branching from kulpi Road from 0.00 Km to 1.26 Km of Lakshmikantapur Highway Sub-Division under Diamond Harbour Highway Division in the district of South 24 Pa
Flank Protection work during monsoon by dressing and chilchalling with cutting surface drain at Rajgram Mohanpur Rd from 0.00km to 13.00km under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the Dist of Birbhum during the year 26-27
Nanoor Basapara road MDR Rehabilitation work of Box Culvert at 6.50 Km under Kirnahar Highway Sub Division
Retrofitting works of existing Steel truss Bridge over suburban Head-Cut Channel at Paschim Chowbhaga, Basanti Highway
Construction of PCC Road from Highway to Masjid via Mandir via Abdul Halim house,at Sansad- XVII.
CONSTRUCTION OF CC ROAD FROM ASIAN HIGHWAY 02 TO SANJIB SINGHA VIA DULAL ROY AT BAZAR SANSAD
Repairing and renovation work of Raipur Inspection Bungalow under Bankura Highway Division in the district of Bankura.
Emergent Protection work of Dharaikuri River Bridge pier protection of Mallickhat-Sitapara Road under Jalpaiguri Highway Division
Installation of Sign Board to the Bridges, ROBs and Roads of Midnapore Highway Division, P.W. (Roads) Directorate
Maheshpur Birshibpur Hatgachia Boaliaghat Road from 0.00 Kmp to 8.77 Kmp Surfacing Work under Howrah Highway Division
Madanpur Bhagirathi Shilpasram Road from 0.00 Kmp.to 3.90 Km. Strengthening Work under Nadia Highway Division No-II.
Providing signage and allied works at different roads under Jalpaiguri Highway Division in the district of Jalpaiguri.
Construction of Road from Bhojerhat Basanti Highway to Bhatipota Mathpar at Tardah GP under Bhangore-I PS.
Temporary restoration of Durgapur Patnoliaghat road in the district of Uttar Dinajpur under Uttar Dinajpur highway division
REPAIRING OF DHAPA ROAD FROM BASANTI HIGHWAY TO CHAINAGE 2058.00 MTR IN WD NO-58, BR-VII.
Sutarbag Bridge at 13.00 km of Kashinagar-Roypur-Ferryghat Road, Rehabilitation work Under Diamond Harbour Highway Division
Post 5 Years Maint. of road from Highway to Khadempukur Village Road vide Pkg No. WB04 ADB22
Repairing of Bituminous Road from Highway to Sk Ajijul house under ward no 02, within Haldia Municipality.
Sukanta Setu, Rehabilitation work Under South 24 Parganas Highway Division in the District of South 24 Parganas
Gujarpur Boropole Bridge at 14.70 km of Ranihati - Haridaspur - Amta Road, Rehabilitation work Under Howrah Highway Division
Repairing and Painting of EEs Residential Quarter under Murshidabad Highway Division No.I. during the year 2026-2027.
FOR CONSTRUCTION OF VARIOUS FOBS,ROBS,FLYOVER,METROS,BRIDGES,HIGHWAYS,TUNNELS,INSTITUTIONAL BUILDINGS,STADIUM,AIRPORT,STP,WTP,WORKSHOPS/DEPOT,RAILWAY ELECTRIFICATION,SEA PORTS,RAILWAYSTATION DEVELOPMENT FOR EXISTING/UPCOMING PROJECTS ACROSS PAN INDIA
Construction of Pedestrain guard rail in between service road and raised concrete drain from 0.55 km to 1.55 km of NH-117(Kona Expressway) in the district of Howarh during the year 2021-22.
Assessment of present capacity of Extended portion of LLL2K Sultanpur khal Drain of belgharia expressway within block PS Barrackpur for preparation of desiltaion Scheme by conducting hydrographic topographic survey under the jurisdiction EE UDD
Maintenance of permanent hedges and planting of flowering plants in median for one year from 0.557Kmp to 7.163Kmp (Kona Expressway) of NH-117 under NH Division-I in the District of Howarh, West Bengal.