Loading…
Loading…
11,187 results • Best match
Construction of C.C. Road from Highway to Adibasipara and all way within adibasipara Ward no 01 under Khirpai Municipalit
Emergent repairing of potholes by precoated chips at different roads within the jurisdiction of Sadarghat Highway Sub-Division-II
Illambazar-Dubrajpur Road (SH-14) Enhancement of steel structure at Sal Bridge (44.00 km) under ILLambazar Highway Sub-Division
LAVPUR TO GUNUTIA ROAD FROM 0.00 KMP TO 2.800 KMP URGENT REPAIRING (IN STRETCHES) UNDER BOLPUR HIGHWAY SUB-DIVISION
Construction of Footpath from NH 10 highway toward Narey Chhetri House Sansad IX at Teesta GP under 15th FC
Joypur-Pathdanga Road from 0.00 Km to 3.50 Km, Surfacing work under Murshidabad Highway Division No.II during 2023-24
Construction of Drain at 17.355 Km of Sindri-Manbazar Road under Purulia Highway Division in the District of Purulia.
Installation of new Air Conditioning Machine at various Section of Burdwan South Highway Division ,PW (Roads) E I work
Construction of Boundary Wall at Sagarpara Stack-Yard compound under Murshidabad Highway Division No.I. during the year 2024-2025.
Repairing and painting of SE office adjacent Rest Room under Midnapore Highway Division in the district of Paschim Medinipur.
Srikol Shyampur Road 0.00 Kmp to 4.65 Kmp, Surfacing work Under Howrah Highway Division in the district of Howrah.
guardrail for highways Guardrail For Highways ( 100 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Type Guard Rail Set One set of WSS1BP: W- Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Anchorage Plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 10 Nos. Hexagonal Headed bolts 4 Nos. The Length of Post 700mm (standard) ; One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard), One set of WSS1BP: W-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Anchorage Plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 10 Nos. Hexagonal Headed bolts 4 Nos. The Length of Post 700mm (standard), One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2050mm (standard) 1/4, One set of WSS2: W- Beam 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed Bolt 20 Nos. Hexagonal headed anchor bolts 8 Nos. The standard Length of Post is 2600 mm (Long post), One set of WSS2BP: W-Beams 2 Nos. Posts with Base Plate 2 Nos. Spacers 4 Nos. Anchorage plat 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 950 mm (standard), One set of WDS1: W- Beams 2 Nos. Posts 2Nos. Spacers 4 Nos Dome Headed Bolts 20 Nos. Hexagonal Headed Bolts 8 Nos. The Length of Post 1800mm (standard), One set of WDS1BP: W-Beam 2 Nos. Posts with base Plates 2 Nos. Spacers 4 Nos. Anchorage plates 8 Nos. Hexagonal headed anchor bolts 8 Nos. Dome Headed Bolts 20 Nos. Hexagonal Headed bolts 8 Nos. The Length of Post 700 mm (standard), One set of TSS1: Threi-Beam 1 No. Posts 2 Nos. Spacers 2 Nos. Dome Headed Bolts 16 Nos. Hexagonal Headed Bolts 6 Nos. The Length of Post 2000mm (standard), One set of TDS1: Threi-Beams 2 Nos. Posts 2 Nos. Spacers 4 Nos. Dome Headed 2/4 Bolts 32 Nos. Hexagonal Headed Bolts 12 Nos. The Length of Post 2000 mm (standard) ; DGSamp;D Drawing No. DGS&DG RAILWSS1-BP - DGSamp;D Drawing may be downloaded from the url https:dgserver.dgsnd.g ov.inrcDRG.Highway20 Rail.pdf - Compliance to DGSamp;D Drawing Yes - Read DGSamp;D Drawing and fully understood Yes - CONSTRUCTIONAL Length of Beam, (mm) 4318 Width of Beam 311 mm for W-Beam section 311 mm for W-Beam section, 505 mm for Thrie-Beam section Depth of Beam (mm) 83 - Thickness of Beam (mm) 3 - Mass of Zinc coating for W-Beam, PostSpace channel, Fish Tail Terminal, Bolt & Nut, washer (g/m2) 550 - CERTIFICATION ISI Marked HR Coil to IS:5986, latest, Grade 255, min. Yst 255MPa, T.S 520MPa, Elong., 17% Yes - Test Report for ISI marked HR Coil amp; Zinc Coating from Govt/NABL/ILAC accredited lab to prove conformity to the specification Yes - Test Report No and Date - - Name and Address of the Lab - - Test Report to be furnished to the buyer on demand Yes - * Bold specifications are the golden parameters. 3/4 Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 R Sekar 734007, Dett 1031 (I) ESPL CARE 532 SSTC C/O 99APO Teen Batti More Silliguri 100 15
removal of debris in the form of sand, earth droping, rubbish from vehicles plying over the bridge on a daily basis clearing of the drainage spout of the bridge deck slab free from all dirts as and when required Removing the weeds and roots
Annual Maintenance work for Repair and Replacement of damaged crash barrier in VVIP route of Vidyasagar Setu including main bridge for the year of 2022-2023 For Kolkata side Viaduct, Howrah side viaduct and Kona expressway only
Construction of Brick masonry Covered storm water drain and RCC box drain from Gas Godown to Fatullapur crossing on Kalyani Expressway under Bilkanda II Gram Panchayat and ward no 28, 29 of Panihati Municipality(Sl No 01)
Dismantling of poles and fittings from the existing position, installation of new pole, LED fittings, laying of different size of cable by sullying the same under Feeder piller Box no. 6 and supply, delivery and laying of new cable in replace
Mtc. and Patch repairing of Kashemnagar-Natunhat-Srikhanda Road (KNS-II) from 20 kmp to 22 kmp and 26 kmp to 27 kmp under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Surfacing work (in stretches) to Mongolkote P.S. Link Road from ch 0.00 to 0.250 km, from 0.40 to 0.50 km, from 0.65 to 0.70 km and from 0.85 to 0.95 km under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division inthe distofPB 2nd call
Maintenance and patch repairing of Fulgram Link Road from ch. 0.00 kmp to 1.00 kmp and Monteswar Dainhat to Chandrapur HC link road from 0.00 kmp to 1.00 kmp under Bhatar Highway Sub-Division No. II of Burdwan North Highway Division in the dist of PB
Tamluk Moyna Road Patch repairing of damages due to incessive rain fall and Yass from 0.75 Km to 4.5 Km and 7.0 Km to 15.43 Km by repairing potholes, 20 mm PC and Seal Coat under Tamluk Highway Sub -Division of Tamluk Highway Division in t
Repair and maintenance of DCDKM Rd from 0 to 4 Kmp, 11 to 12 Kmp Different stretches by providing potholes, 20 mm PC, SC Type-B etc. under Purulia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Repair and maintenance work in Stretches on Karjona-Muratipur-Natunhat Road (SH-7) from 2.00 kmp to 3.00 kmp and 16.00 kmp to 17.00 kmp of Bhatar Highway Sub-Division No. I under Burdwan North Highway Division during the year 2025-26 in the dist of P
Uchalan-Kaity(VR)-Patch repair works from 1.00 km to 2.00 km and 5.00 km to 8.00 km in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24
Repair of Egra Bazar Road from 0.000 km to 0.750 km by repairing Potholes and thorough 20 mm PC and SC Type B under Contai Highway Sub Division under Tamluk Highway Division in the District of Purba Medinipur during the year 2019 2020.Ch. To N
Repairing of Begunkodar-Jhalda Road from 0 to 8 Kmp on patches by 20 mm P. C. SC, Construction of Causeway at Ch. 3.40 Km under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.(2nd Call
Repair and Mtc of Kustaur Raiway Station to Chas Road from 5 to 10 Kmp and 14 to 17 Kmp (Different Stretches ) by providing 20 mm PC, SC under Puurlia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22
Majdia Bhajanghat Road from 1.00 kmp to 2.00 kmp, 3.00 kmp to 4.00 kmp and 4.30 kmp to 6.30 kmp, patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the
Repairing of Balarampur-Bagmundi Road from Ch. 2 to 4 Kmp and 12 to 16 Kmp by repairing 20 mm P. C. S.C. Type-B under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22. (2nd Call)
Maintainance and Patch Repair of link road from Bhatar-Samanti Road to village Chhatni from 0.50 km to 1.50 km and 2.50 km to 3.50 km under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman year 22-23
Maintenance and Patch repair of Link Road from Bhatar Samanti Road to Village Chhatni from 0.50 km to 1.50 km and 2.50 km to 3.50 km under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the
Repairing of Balarampur-Bagmundi Road from 10 to12 Kmp, 18 to 20 Kmp, 23 to 25 Kmp by providing 20 mm P. C, Seal Coat Type-B etc. under Balarampur Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Patch repair work in stretches of Kaichor-Nandigram-Singhi Road (MDR) from 5.00 km to 6.80 km and 8.20 km to 9.00 kmp under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24. (2nd Call
Auction cum sale of 100 (one hundred) nos standing trees required for removal for the purpose of the Widening and Strengthening work of K-B-G-M-R Road (SH-7) from 0.00 Kmp. to 28.55 Km under Murshidabad Highway Highway Division No.II, P. W. (R) Dte.
Maintainance and Patch Repair in stretches of Link Road from Bhatar Samanti Road to village Chhatni from 0.00 kmp to 0.50 km, 1.50 km to 2.50 km and 3.50 km to 4.00 kmp under Bhatar Highway Sub-Division-II of Burdwan North Highway Division FY 23-24
Patch repair work in stretches of Kaichar-Nandigram-Singhi Road (MDR) from 22.20 Km to 22.60 Km and 22.80 Km to 24.20 Km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 26-27(2nd Call)
Patch repairing Work in stretches of Bardwan Katwa Road to Sunur from Ch. 0.00 kmp to 4.00 kmp and Amarun Rly Stn. to Amarun Village with a link to Arrah from 0.00 Kmp to 4.00 Kmp under Bhatar Highway Sub-Division No.-II of Burdwan North Highway.....
Jalpaiguri to Choulhati road from ch.2.55km to 3.00km surfacing work under Jalpaiguri Highway Division during the year 2023-2024
Englishbazar kotwali road from 0.00 kmp to 4.00 kmp, Surfacing work under Malda Highway Division in the District of Malda.
Restoration of Damages due to DANA on Road namely Palladaha kalyani highway more to Jubak Sangha under Barrackpur - II Block
Jhalda-Bagmundi Road from 15.00 Kmp to 15.52 Km, Improvement work under Purulia Highway Division in the District of Purulia.
Bishnupur Patrasayer Road from 3.00 kmp to 8.00 kmp, Surfacing work under Bankura Highway Division in the district of Bankura.
Nimbari-Harishchandrapur Road from 0.00 kmp to 5.62 km, Surfacing work under Malda Highway Division in the District of Malda.
Shyampur Shibganj Road from 1.60 Km to 5.99 Km , Surfacing work under Howrah Highway Division in the District of Howrah
Muchia- Singabad Road from 2.20 km to 8.31 km, Surfacing work under Malda Highway Division in the District of Malda.
Installation of Gantry Signage Board at 0.00kmp to Lataguri Kranti Road under Jalpaiguri Highway Division in the district of Jalpaiguri
Bagnan - Amta Road from 0.00 Kmp to 13.40 Km, Surfacing Work Under Howrah Highway Division in the district of Howrah.
Heria Mugberia Road from 0.00 Kmpto 7.90 Km., Surfacing Work under Tamluk Highway Division in the district of Purba Medinipur.
Road from Asian Highway 2 to SSK Polling Station Tawan Basti Hybrid Basti,Warish Jotes House and Gaur Singhs House
Adina-Chakli Road from 25.66 km to 33.68 km, Surfacing work under Malda Highway Division in the District of Malda.
GANESHPUR DEWANTALA ROAD FROM 0.00 KMP TO 5.200 KM, STRENGTHENING WORK - UNDER HOWRAH HIGHWAY DIVISION IN THE DISTRICT OF HOWRAH