Loading…
Loading…
23,354 results • Best match
THRISSUR CORPORATION 2024-25 OLLUR ZONAL OLLUR CHC BUILDING MAINTANANCE Pro.no.1990/24-25
Annual Plan-CHENGANNUR BP 2023-24/ PRO. 84/24-ALLIED WORKS FOR PADANAD CHC
THUNERI BLOCK 2022-23 Construction of security cabins and parking facilities at Valayam CHC
Annual Plan-Health Grant 2023-24 CHC Kanjeettukara rennovation -Koipuram BP-Pro no 155
NHM-Upgradation of Changankulangara subcenter under CHC Oachira into Health and wellness center, Kollam
Annual Plan-2024-25-CHC KALLOOPPARA PUBLIC HEALTH UNIT LAB RENOVATION PROJ NO 157
GENERAL-Kattappana BP 2023-24-ELECTRFICATION OF CHC UPPUTHARA-General Electrical Work 82/24
Annual Plan-Electrification of Laboratory in Champakulam CHC ,-under Champakulam BP.-General Electrical Work
Annual Plan 2024 25 Pro No 149 Infrastructure developement of Maranchery CHC Maranchery GP
Parakkode Block Panchayath 2020 -21 Maintenance and painting works in CHC Enadimangalam quarters building
IRIKKUR GP 2019-20 PRO NO 61/19-20 IMPROVEMENT WORKS TO IRIKKUR CHC
Cleaaring and Leveling the site for Construction of Propsed Multipurpose Hall in Elanthoor CHC
Annual Plan-S0101/23-Madappally Block panchayat 2022-23 Infrastructure Development for CHC Vakathanam
Annual plan 115/2022-23 Madappally BP Renovation of Sub Centre in Vakathanam CHC
Supply and installation of DG Set in CHC Vadakkekadu under Chavakkad block Panchayath Thrissur
PRO.NO- 215/2025-26-Basic infrastructure develpment of modification at Poovar CHC Second stage
Kuthuparamba BP _Proj. No 75/2021-22 _Renovation of CHC Cheruvanchery In Pattyam GP
Vazhoor BP Proj No.31/22 Karukachal CHC Building Maintenance in Karukachal G P
Kothamangalam Block PANCHAYATH Project Number-SOO34/26- Varappetty CHC Renovation Electrification- General Electrical Work
KBP - 195/22 - Construction of Compound wall for Kumbala CHC in Kumbala Grama Panchyath.
Annual Plan-Lalam Bloclk panchayath 2025-26 S0141/26-Ullanad CHC doctors quarters maintenance
General-Preliminary Soil Investigation work-Construction of new building for Anjuthengu CHC-Civil work
RENOVATION WORK TO COMPOUND AND COMPOUND WALL AT AMBALAVAYAL CHC IN AMBALAVAYAL GRAMA PANCHAYATH
612 25 Providing electrification for panelboard in the lift controlling room at CHC Poonthura
Supply and Providing 62.5 KVA DG Set for CHC Mayyil, under Irikkur Block Panchayth
Oachira Block Panchayat 2020-21 Renovation works to CHC Oachira in Oachira Grama Panchayat
Kottarakkara BP2022-23 Construction of Toilet Complex at Nedumonkav CHC (Project No. 111) Retender
AREEKODE BP 2022 23 MAINTANANCE TO CHC URANGATTIRI IN URANGATTIRI GP 253 22 23
Kalikavu BP 2022-23,Pro.No 171/23,Construction of a Building for CHC Kalikavu
Annual Plan- Pandalam Block 2023-24 Thumpamon CHC renovation- Renovation Works- General Civil Work
Annual Plan-Koipuram Block Panchayath- Kanjettukara CHC workstation electrification, ceiling, plumbing-138/23-24
Electrification to the Physiotherapy blockLaboratorytoilet block attached to CHC Alanellur under Mannarkkad Block Panchayath.
NHM- Upgradation of Valiyakulangara Subcenter under CHC Oachira into Health and wellness center, Kollam
Kgm Blk 274/26 CHC Cheroopa BlockPublic Health Unit Rennovation in Mavoor G P
Annual Plan-Kilimanoor BP 2025-26-78/26 -Pallickal CHC Maintenance-General Civil Work
GENERAL-Vamanapuram BP_2026_Electrical Works-Electrification of Pharmacy godown in Kallara CHC -General Electrical Work
VATHIKUDY GP 2025-26 - MAINTANANCE OF CHC SUB CENTERS IN VATHIKUDY GP ( 115/026)-
GENERAL-Vazhakkulam BP - Vengola GP - CHC Vengola-Physiotherapy centre new Wiring Generaral Electlical Work
MOEI and Fans, Compound Lights including R/M of pump sets, Generating Set, Passenger Lifts, Substation, Fire fighting equipments etc at CDC, Medical College Campus,Trivandrum.SH: Comprehensive Maintenance of AC units. Subwork/Packages: Single
Civil and Electrical Works for Setting up of ICU at Taluk Hospital, Sasthacotta, Kollam, Kerala as per Schedule of Work enclosed.
Civil and Electrical works related to Setting Up of High Dependency Unit at Government Victoria Hospital, Kollam
Premonsoon cleaning work 2023 Emergency cleaning of Anadyil Hospital to Pattom thodu in Pattom ward Trivandrum corporation
150mm Dia Borewell at ESI Hospital Jainimedu Ward 51 in Palakkad Muncipality Under Deposit Scheme 2023 24
Supply of Liquid Medical Oxygen by installing plant including service for 3 years at General Hospital Ernakulam
Supply of Raw Materials, Orthotic and Prosthetic Components to PMR (Artificial Limb Centre) of GMC Hospital, Manjeri
GENERAL-Kattappana municipality Project Number-SO575/26-Vazhavara Urban PHC Complection and Electrification Work in Ward-1, Electrification-
Pro.no.253/23 -Chathannur PHC subcentre compound wall rennovation
KOTTAMKARA GP Soakpit Construction in PHC and School Project no. 201/25
PLAN 2020-21-PHC BUILDING MAINTENANCE (PROJ NO.44) IN NARIPPATTA GP
534 GENERAL-Maradu Municipality-PHC VALANTHKAD-1st FLOOR ELECTRIFICATION-General Electrical Work