Loading…
Loading…
2,560 results • Best match
Construction of Cement Concrete Road from Mungiakami PHC to Jalaitu Para of Ramkrishnapur VC under Mungiakami RD Block as per PWD SoR - 2023.
Construction of 10 Bedded PHC (Ground Floor) at Kaya Haduk, Borakha, Patni, Jirania Sub-Division during financial year 2021-22 (without Ramp wing)
Construction of Boundary wall and approach road including Laying of Paver block in front of Dayarampara PHC at Golaghati, Jampuijala Sub-Division, Tripura.
PROVIDING EI IN 04 NOS TYPE I 04 NOS TYPE II AND 02 NOS TYPE II QUARTERS AT BRAJENDRANAGAR PHC UNDER DMR SUBDIVISION
Providing Permanent Internal Electrification work for Construction of BPHU at Baijalbari PHC under Padmabil RD Block as per PWD SoR-I/Elect-2021
Renovation of existing Ranirbazar PHC Quarters, West Tripura SH Building portion including internal water supply, Sanitary installation, sewage, drainage work etc Gr-I
Maintenance of Haludia Health Sub-Center and construction of Sinking of SBDTW at Haludia Health Sub-Center Under Mungiakami PHC of Khowai District
Upgradation and Renovation of Surendranagar Sub Centre of Hezamara PHC under Hezamara RD Block during 2019-20 DT-107 Dated 24/02/2020
Upgradation and Renovation of Balurband Sub Centre of Hezamara PHC under Hezamara RD Block during 2019-20. DT-105 Dated- 24/02/2020
Construction of Vertical extension of Baikhora PHC under RD Santirbazar Division, South Tripura District during the F.Y. 2025-26 (Based on SoR 2023)
Installation of Oxygen Plant at South District Hospital, Santirbazar, South Tripura.
Annual Maintenance of Khowai District Hospital as per PWD SoR 2023
Construction of boundary wall at Teliamura Sub-Divisional Hospital (Front Side)
bedclothes rubberised coir mattress cushions and pillows hospital mattresses and pillows
Providing PA System in the District Hospital, Unakoti Tripura. 2nd Call
Maintenance of Sewage pipe line surrounding Unakoti District Hospital, Bhagabannagar Kailashahar
Patient Transfer Mats or Sheets for Hospital/Ambulance (Q3) (3 (3 ))
Maintenance of all pump motor and replacement of damage starter , main switch including installation of submersible pump motor etc at AGMC and G .B .P Hospital complex , Agartala 79 Tilla quarter complex during the year 2022-23.
Providing Annual Maintenance Contract AMC of all the UPS Make Numeric installed in NTH I NTH II Medicine building College building and Super specialty building of AGMC GBP Hospital Agartala Tripura West during the year 2026 27
Construction of Allied Health Institution at AGMC Complex,GBP Hospital,Agartala,West Tripura/SH Building portion LGF (one),LGF(two), and GF Including retaining wall,approach ramp,internal water supply and sanitary installation.
Construction of Trolley Bay with Galvalume sheet cover from Eye block to NTH-l to old emergency block to New Super Specialty block in FY 2024-25 under AGMC and GBP Hospital, Agartala
Construction of another patient party waiting shed along with attached shed from Gynae gate to main road after demolishing the existing waiting shed in FY 2024-25 under AGMC and GBP Hospital, Agartala
Maintenance of Internal road (L 250 m) with steel fencing of Garden area at Mordern Psychiatric Hospital, Narsingarh during the year 2025-26/SH Brick work, steel work, tiles, WBM, Premix carpeting etc
SR work for replacement of dilapidated GS Roofing, MS Frame, False ceiling work, including allied electrical works at ESIC Branch Office and ESI Dispensary complex at Agartala, Tripura.
Providing internal electrification at Khilpara HSC, Mogpuskarini Govt. Homeopathic Dispensary,Dudhpushkarini HSC,Dhuptali HSC,Pitra HSC,Lovestory HSC under Matabari and Kakraban R.D.Block under R.D.Udaipur Division,Gomati District.
Vertical Extension of CHC Takarjala for the Construction of Block Public Health Unit (BPHU) Health Management Information System , Jampuijala, Sepahijala District FY 2024-25( PWD SoR 2023)
Conversion of existing ICU to 24 bedded ICU at Unit-I, Department of General Medicine within the premises of AGMC and GBP Hospital during the FY-2026-2027(2nd Call)
2. Construction of Mortuary in different Districts Hospital during the year 2022-2024/ (Mortuary in Gomati District Hospital) /SH Civil Works, Internal water supply and sanitary installation etc
Maintenance/ Renovation of Residential buildings at Dhalai District Hospital Quarter Complex/ SH- Mtc. Of Dhalai District Hospital Staff quarters (Type - I, II, III) at Kulai, Ambassa, Dhalai Tripura.
Annual Maintenance of existing electrical installations at Sub Divisional Hospital Sabroom South Tripura for the year 2025 26
Construction of separate Ladies bathroom and replacement of existing water supply pipeline connections at Netaji Subhash State Homoeopathic hospital, Renters Colony, Agartala, Tripura West / SH Earthwork, RCC work, Brick Work,new pipe connection etc
Maintenance of all Pump motor and replacement of damage starter, main switch including installation of sub miscible pump motor etc. at AGMC and GBP Hospital complex, Agartala,79 tilla quarter complex during the year 2021-22.(2nd Call).
building construction items.
Providing annual maintenance of EI at Amarpur SubDivisional Hospital Oxygen plant and Shelter house attached to Amarpur SubDivisional Hospital Amarpur Gomati Tripura
Providing Repair and maintenance of 02 Nos 320 KVA Sl NO ESN 84507942 and 84506042 Model QSL9 G19 Brand Jackson Cummins along with their AMC installed in the premises of AGDC and IGM Hospital
Establishment of Critical Care Block (CCB) and Communicable Disease Centre (CDC) at AGMC and GBP Hospital Complex, Agartala, Tripura West / Building portion including retaining wall internal water supply, Sanitary installation, Sewage and Drainage wo
Construction of RCC post and base for lifting and lowering of submersible pump and motor in/c mtc. of pipeline and other ancillary works at AGMCa nd GBP Hospital during the FY-2026-2027
Construction of Health Sub-Centre (AAM) at South Taranagar GP(East Taranagar HSC) under Mohanpur CHC during the year 2025-26 S.H Earthwork and PCC work , all structural work like RCC work, Brick Masonry work etc.
Improvement of road from Udaipur-KIlla road to Killa PHC(L 0.280 KM) and Road from Joing Bari Bazarto Killa-Dewanbari road (L 0.70 KM) portion from Ch.0.10 Km to Ch.0.41 Km under SHYAMA PRASAD MUKHERJI RURBAN MISSION (SPMRM) At Killa Cluster
Upgradation
Upgradation
Providing AMC of One No 1010 KVA Jackson Cummins DG Set SL NO ESN 25430574 Model KTA 38 G5 and One Nos 250 KVA Jackson Cummins DG Set SL NO ESN 84514922 Model 6L 8 9 TAA G4 installed in the premises of ABV RCC Hospital
Providing Annual Internal Electrification maintenance work in all the buildings Super Specialty Old Building Jayanti Medicine Building NTH-I and NTH-II Building Blood Bank Mortuary Block and other work stations of the hospital of AGMC and GBP Hospita
Supplying installation testing commissioning of 1 no 1 KVA UPS 19nos 12 V 42AH sealed mtc free SMF VRLA battery in the Hematology Service Lab Histopathology section in the Department of Pathology College Building AGMC GBP Hospital Agt Tripura
Veterinary Dispensary, Kanchanbaari
Supplying Installation Testing and Commissioning of 250 KVA DG Set at Karbook Sub Divisional Hospital Karbook Gomati District Tripura
Mtc. and upgradation of 03(Three) Nos. Health Sub Centre at 1. Polku 2. Jaksuiya 3. Twichakma under Taidu PHC under Ompi RD Block
Upgradation and Renovation of Purba Simna Sub Centre of Katlamara PHC under Hezamara RD Block during 2019-20 DT-110 Dated 24/02/2020
Upgradation and Renovation of Purba Tamakari Sub Centre of Chachubazar PHC under Hezamara RD Block during 2019-20. DT-111 Dated 24/02/2020
Upgradation and Renovation of Sonai Bazar Sub Centre Of Chachubazar PHC under Hezamara RD Block during 2019-20 DT-112 Dated 24/02/2020