Loading…
Loading…
1,892 results • Best match
Compressor, Model-RC2-470B VI 2.6, for Chiller Unit Model- LCWX2-270DiB and Model-LCWX1-135DiC, Evaporator, Model-LCWX1-135DiC, for Chiller Unit Model-LCWX1-135DiC, Evaporator, Model-LCWX2-270DiB, for Chiller Unit Model- LCWX2-270DiB
Repairing and overhauling of screw type chiller at ESS-3 and centrifugal type chiller at ESS-1 of IISER Kolkata Main Campus
Day to day repair, preventive maintenance, operation by providing Supervisor, High skilled, Skilled, Semi skilled, unskilled Manpower for Elect. installations, Lift, HVAC, FDP, STP, ETP, WTP, RO sys. at Hatuara SSH under jurisdiction of WBMSCL 1year
Setting up the establishment of District integrated public health Laboratory DIPHL at Murshidabad Medical College and Hospital in the district of Murshidabad-SITC of HVAC System for TB Lab, Bacteriology Lab and Extraction Room 2nd call.
Day to day repair, preventive maintenance, operation by providing Supervisor, High skilled, Skilled, Semi skilled, unskilled Manpower for Elect. installations, Lift, HVAC, FDP, STP, ETP, WTP, RO sys. at Salboni SSH under jurisdiction of WBMSCL 1year
Setting up the establishment of District integrated public health Laboratory DIPHL at Malda Medical College and Hospital in the district of Malda - SITC of HVAC System for TB Lab, Bacteriology Lab and Extraction Room 2nd call
BOX, CHILLER, DWN: 3.39. 71.30V/71693A-4203073977 (022)
Installation of Aqua Chiller near Anada Roy house
INSTALLATION OF CHILLER CUM PURIFER AT SHIRA MASJID
Supply and Installation of Recirculating Chiller (6 nos.)
BOX, CHILLER, DWN: 3.39. 71.30V/71693A-4203080071 (022)
INSTALLATION OF WATER PURIFIER CUM CHILLER KOMDHARA HIGH
CHILLER AIR COOLED WITH SOFTWARE FOR SEM WORKSTATION
BOX, CHILLER, DWN: 3.39. 71.30V/71693A - 4203085697 (022)
IMPROVEMENT OF AIR CONDITION DUCTING SYSTEM AT CONFERENCE HALL NO-01 OF CMO BUILDING.
Repairing of existing Ducting system and allied works at SSB MCH Kolkata COVID WARD
Operation and Comprehensive Maintenance of following HVAC system-Dr. Syama Prasad Mookerjee Super Specialty Hospital, 1000TR HVAC System and JCGPCR HVAC System in Indian Institute of Technology- Kharagpur Campus for 5 calendar years
Renovation of Electrical Installation, HVAC, Fire Detection and Ventilation system at 1st floor to 4th floor at Uttirna-HVAC Works.
SITC of VRF air conditioning system at NIC Bidyut Bhavan
Misc HVAC work at Howrah IT Park
Urgent covering all peripheral drains by concrete cover slab including covered Iron Gate at Common Collection Site and a platform along with railing support at chiller plant of Serampore SSH, Serampore, Hooghly under WBMSCL during the year 2024-2025
Supply and Installation of Ductable AC Machines at Webel IT Park Durgapur
Detailed E I estimate under Central AC zone at Roopkala Kendro Sector V Salt Lake City Kolkata 700091
MOEI & fans i/c RMO water pump, sub-station, automatic fire alarm system i/c stair case light in residential building and non-residential building, National Library i/c security light, boundary light & E.I. service of service building in National ... type AC Plant , ... of AC Plant )
1892/NKDA /Engg-36/2010-XII-Supply and Installation of Air Conditioner with VRF System for 1st and 2nd floor Banquet Halls and Split System for all the Guest Rooms, Lounges at Mezzanine Floor Level and Office room of Community Center II
1393/NKDA/Engg-36/2010-XII -Supply and Installation of VRF air conditioner system for 1st and 2nd floor Banquet Halls and Split Air Conditioner System for four nos. guest room, office room and lounges at mezzanine floor level of Community Centre-1
O & M of E & M services DG sets FF/FA system VRF System CCTV etc at CFSL at Rajarhat New Town( SH: Servicing & checking of AFAS system / wet riser / sprinkler system i/c mock drill test etc at CFSL office campus Rajarhat
Operation & maintenance of E &M services, DG Sets, FF/FA System, VRF System, CCTV etc at CFSL at rajarhat New Town ( Checking of CCTVor Bullet camera or PTZ camera( Make: Pelco) Access Control( make: Matrix) with minor repairing at CFSL office bldg Rajarhat)
Operation and Maintenance of E & M Services, DG Sets, FF ot FA System VRF System CCTV Lift etc at Central Forensic Science Laboratory at Rajarhat New Town during 2024 25 ( SH Comprehensive maintenance of 2 nos 13 passengers ( 884 kgs) KONE Make Lift
Operation & Maintenance of E &M services, DG Sets, Sub station FF/ FA system VRF System, CCTV system at CFSL at Rajarhat New town( SH : Servicing and checking of FF system, rectification of fault, repairing of Pump motor set etc at CFSL New Town)
ARMO Passenger & Goods Lifts, Fire Fighting and Fire Alarm System for GSI Office Complex at 27 & 29, J.L.Nehru Road and 15, Kyd Street, Kol-16. (SH: Repairing and Servicing of 22 HP VRF ODU at Conference Hall, GSI Building, Kyd Street, Kolkata.)
Operation & maintenance of E & M services DG sets FF/FA system VRF system CCTV etc at CFSL at Rajarhat New Town during 2025-26(SH: Refilling CO2 Fire extinguisher and supply DCP type fire extinguisher at CFSL DJ Block New Town Rajarhat Kolkata
3 x 500 TR capacity A.C. Plant at Bhasha Bhawan, National Library Complex, Kolkata (Operation and Comprehensive maintenance of AC Plant) during 2025-26. (SH: Operation & comprehensive maintenance of 3 X 500 TR chilled water central A.C. Plant including its. associated AHUs, grills & diffusers etc. at Bhasa Bhawan, N.L. Complex, Kolkata.)
Custom Bid for Services - Annual Rate Contract for Electrical Distribution System Maintenance including fans air Conditioning machine etc under Electrical Colony Maintenance Division DTPS DVC Durgapur713207 Similar Category Operation And Maintenance ... Of HVAC System ...
E-Tender for engagement of resourceful Contractors / Service Providers for one time repairing (along with supply of spare parts) of 2 nos. Air cooled chiller and 06 nos. of pump at Central Library located at Aliah University Kolkata New Town Campus.
Construction of Diesel Generator shed foundation, Air cooled chiller plant base on the roof of sub station and other necessary related works etc. in the compound of Open Campus cum Regional Centre of Netaji Subhas Open University at Newtown, Kolkata.
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR THE BLUE STAR MAKE CHILLER PLANT (2 NOS. 160 TR CHILLER UNITS) INSTALLED AT TOWN HALL, KOLKATA, UNDER KMC
Installation of Aqua Chiller near Purba Kalikapur FP School
INSTALLATION OF CHILLER CUM PURIFIER MACHINE AT MIRKHILA MASJID
Installation of Aqua Chiller ( solar ) near Iyasin Mondal House
INSTALLATION OF WATER PURIFIER CUM CHILLER AT HARIT AYUB
Supply and Installation of Water Purifier cum Chiller Machine
INSTALLATION OF WATER PURIFIER CUM CHILLER AT BETA MASJID
INSTALLATION OF WATER PURIFIER CUM CHILLER AT PANJIPUKUR HIGH
INSTALLATION OF CHILLER CUM PURIFIER MACHINE AT CHOUPALA PRY
BOX, CHILLER, DWN: 3.39. 71.30V/71693A-4203071094 (022) (Q3)
Day to day repair, preventive maintenance, operation by providing Supervisor and O and M Manpower for Electrical installations, Lift, HVAC, FPS system, STP, WTP and RO system round the clock of Critical Care Block at Alipurduar,(one year).
Improvement of Ductable AC system at the 5th floor of IT Centre, KMC.
Detailed estimate for false Ceiling under Central AC zone at Roopkala Kendro Sector V Salt Lake City Kolkata 700091
Rearrangement of existing HITACHI make 24 HP VRF outdoor units and allied VRF works at 2nd, 3rd and 4th floor of Town Hall at Nabadiganta Industrial Township, Salt Lake.