13,359 results • Best match
Repairs to the Inspection Path from km. 42.000 to km.45.000 of Mid Pennar North Canal
Formation of earthen road along the KC Canal at Munagalpadu Pumping Station in Kurnool Municipal Corporation
Strengthening of Left Bank from Km 80.00 to KM 90.00 in Reach-II of YLM Canal
VIWSCO - Providing CC roads at Government High school and hospital near Gunupudi village near YLM Canal.
Construction of S.I.Channel Box OT sluice at Km.37.200 Right side on G&V Mani Canal
Permanent Restoration to Flood Damage of PBC Canal Banks at km 21.100 Gollaprolu village and Mandal
Construction of Ponds at Bhadrampalli Major Canal at Km.2.800 and Km.4.500 under GKLI Scheme
Improvements to Right Main Canal at Km 17.100 of GDP in Gonegandla (M) in Kurnool Dt
Construction of Double Lane Bridge at Km 16.645 on Left Main Canal of B.R.R. Vamsadhara Project
Construction of Double Lane Bridge at KM 1.200 on Eluru Canal near Tummalapalli Kalakshetram in vijayawada.
O&M urgent repairs to LB of bandar canal near km,28.400 in Kankipadu section limits.
Filling of Raw Water to N.S.P Canal to Mukthinuthalapadu Cheruvu 1 & 2 in Division No.2
Repairs and Replacement of Vasanthawada L.I.Scheme onCentral Delta Main Canal in Athreyapura (M) Dr.B.R.Ambedkar, Konaseem District
Repairs to SLRB @ Km 33.300 on Guntur Channel Main Canal near Budampadu (V) in Guntur District
Providing New Submersible motor pumpset at Ratnagiri nagar vankayalapadu canal in Div no 40 Under GMC
Removal obstructions Improvements to inspection path from Km 86.000 to Km 90.600 of PABR Right Canal
Permanent Restoration to Flood Damage of PBC Canal Banks at km 25.100 Mallavaram(V), Gollaprolu(M).
Permanent Restoration to Flood Damage of PBC Canal Banks at km 21.100 Gollaprolu village and Mandal
Providing Basic Amenities to Christian Burial Ground near Joharapuram beside K.C. Canal in ward no.18.
Providing Shortcreting on R/S Slope from chainage 61.400 to KM 61.700 of TGP Main Canal
Providing Cement Concrete Lining up to TBL from Km 70.700 to Km 72.000 of SSG Canal
Providing additional amenities to cattle ramp at kw bank canal in Chilumuru village of Kolluru mandal
Providing Cement concrete lining up to TBL from KM 70.700 to KM 72.000 of SSG Canal
Strengthening of Branch canal of RMC to Pincha Project in T.Sundupalli (M) of YSR Kadapa District
Flood Protection Works to Gadigedda Right Main Canal near Garikivalasa(V) of Gurla (M) Vizianagaram District
Improvements to the inspection track of right bank of TGP main canal from KM70.000 to KM72.000
Providing approach roads and retaining walls to Ramannapalem Bridge at Km 7.053 bridge of YLM Canal
Providing CC Road from existing CC Road to Canal (along SC Burial Ground) in 29th ward
O&M repairs to head walls for Direct Pipes @ Km.49.757 Right Bank of Undi Canal
Construction of Double Lane Bridge at Km 16.645 on Left Main Canal of B.R.R. Vamsadhara Project
O&M Urgent repairs to LB of Bandar canal near km.28.400 in Kankipadu section limits.
O&M Urgent repairs to LB of Bandar canal near km.34.200 in Kankipadu section limits.
Improvements & Strengthening of TLIS main canal & distributories and their miniors from KM 35.200 to KM 51.00
Supply and Delivery Errection of 100HP Panel Board at KP Canal Pump House in Srikalahasti Municipality
Construction of Bamboo fencing along the canal bund at Bandar locks in work division-3 area
Maintenance and Improvements to the Public toilets @ Bangaru Peta KC Canal Bund side in 13th ward.
Construction of Bridge across Peter Canal near Kovur Village in Kovur Mandal of SPS Nellore District
Improvements of 8L Major of KR Left Main Canal in Podalakur Mandal of SPSR Nellore District.
Providing Shortcreting on R/S Slope from chaninage 61.050 KM to 61.350 of TGP Main Canal
Strengthening the bank and closing breached portion of KMJ canal in between Km 51.500 to 51.600
Construction of Ponds at Bhadrampalli Major Canal at Km.2.800 and Km.4.500 under GKLI Scheme
Construction of culvert on Bakingham canal on the Road From Kanaparthy to M.S.Pattapupalem of N.G.Padu (M)
Repairs to the Inspection Path from km. 25.000 to km.30.000 of Mid Pennar North Canal
Repairs and Restoration of TGP Block No.37 Major Distributory canal from Chainage KM2.925 to KM4.300
Removal of Silt & Jammu from Km.20.100 to Km.25.000 of SKD Canal under GKLI Scheme
Removal of Silt of KC Canal from Apsara back side to Ganjikunta Colony in East Zone
Providing Additional Amenities to Cattle Ramp at KW Bank Canal in Chilumuru Village of Kolluru Mandal
Reconstruction of new SP @ km 76.880 of Yeleru Left Main canal near Pamulavaka village (2nd call)
O&M repairs to head walls for Direct Pipes @ Km.49.757 Right Bank of Undi Canal
Development of Land Scape (Hard Scape) Works along Krishna Canal from Green City to Jute Mill