Loading…
Loading…
13,359 results • Best match
O&M weed removal on channels including DPs of Krishna Eluru canal under the jurisdiction of KE canal section Atkuru for the year 2020-21
Maintenance of Greenery at Eluru canal bunk left side and right side of canal bund from 01-02-2018 to 31-01-2019 (General Funds)
Removal of Silt in Tail channel of OT Sluice 113L Branch canal of KCC Main canal near Maddur village of Pamulapadu Mandal in Kurnool District.
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for Summer 2024(2nd call)
O&M weed removal on channels including DPs of Krishna Eluru canal under the jurisdiction of KE canal section Atkuru for the year 2020-21
FDR 10/20225 SP BPRC Temporary Restoration of L/s Canal Bank in between Km 0.800 to Km 2.150 of GMD (11R) of Kavali canal
Repairs to shutters on West Escape at Km (Gate No.. 6-7-9 ) on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town
Construction of Off Take at Km.7.700 on L/s Bank of 14 R Major of 7th Branch Canal Under Sri Satya Sai Ganga Canal.
Excavation of silt from the canal bed between km 7 100 to Km 9 750 on CBR Right canal in yellanur mandal of Anantapur District
Providing protection wall, CC apron & causeway to damaged super passage and removal of shoals at Super Passage Km 27.199 in Water Supply Canal, YLM Canal
Repairs to shutters on West Escape at Km (Gate No. 10-11-12) on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town
Replacement of shuttering arrangements with M.S Screw gear box to the Off- Take Sluice of 2B Branch Canal at KM 19.00 of SSG Main Canal
Restoration of Canal breach at Km 51.900 and at km 52.800 of Madakasira Branch Canal near Manche Palli (V) Somandepalli (M) Sri Satya Sai ( District)
FDR Restoration canal regulator shutters across L/s canal at Ch. 6.50 Km near Anjur (V) of Kalangi reservoir in K.V.B.Puram mandal of Tirupathi district.
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for summer 2021 (2nd Call)
Removal of Silt in Tail channel of OT Sluice 113L Branch canal of KCC Main canal near Maddur village of Pamulapadu Mandal in Kurnool District.
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for Summer 2022 (2nd Call)
Providing shuttering arrangement for taking drinking water to Kurnool Branch Canal from Gajuladinne Left Canal at Km 3.00 in Kurnool District under Neeru Chettu Programme
Fabrication, Supply and erection of shuttering arrangements of Cross Regulator @Km2.410, Km 3.360 including construction of Pipe culverts and strengthening of Inspection Pathon LMC Distributory of Sri. Budda Vengala Reddy Siddapuram Lift Irrigation Scheme.
Restoration of Irrigation System for effective water regulation including Monitoring and Management of New Goteru, New Kavalipuram, Old Goteru and Old Kavalipuram Channels in the jurisdiction of Irrigation Section, Penumantra.
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Rayakuduru East Side Channel from km 0.000 to km 2.800 in the jurisdiction of Irrigation Section, Penumantra.
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Inlet at Km.11.100 to Yanamadurru Drain L/B in Duvva (V) Limits in Irrigation Section, Mandapaka
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Mattaparru channel and its branch channel in the jurisdiction of Irrigation Section, Palakollu in West Godavari District
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Inlet at Km 10.525 on Yanamadurru Drain L/B in Duvva (V) limits in Irrigation Section Mandapaka
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Rayakuduru East Side Channel from km 0.000 to km 2.800 in the jurisdiction of Irrigation Section, Penumantra
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Inlet at Km.11.100 to Yanamadurru Drain L/B in Duvva (V) Limits in Irrigation Section, Mandapaka
Restoration of Irrigation System for effective water regulation including Monitoring and Management of Veeravasaram West Side Channel from km 5.800 to km 10.100 in the jurisdiction of Irrigation Section, Penumantra.
Construction of Retaining wall at East canal in 22nd ward of Tenali Municipality (Recall)
Repairs of canals and structures at Km. 1.100 of the 3L Minor and Km. 0.250 of 4L Minor of 1L sub-minor in Block No.6 TGP under VBR
Restoration of canal system including Monitoring & Management, Flood Protection works and Strengthening of flood banks for smooth water regulation during Khariff 2024 in Left Main Canal from Km 0.000 to Km 21.975, 12R Branch Canal from Km 0.000 to Km ... Branch Canal from ...
Improvements to Canal Escape at Km.117/565 of RBLLC.
Formation of inspection path on Injaram canal near Venturu Village
Improvements to canal escape at Km.117/565 of RBLLC.
Construction of Inlet at Km 94.550 on PABR Right Canal
Road from Attili to Mandapaka via canal in Attili Village.
Construction of walkway across Main KC Canal at Km 7.000
Construction of walkway across Main KC Canal at Km 15.100
Improvements and repairs to 19th Distributory of M.P. South Canal
Improvements for Sluice at Km 12.600 of PABR Right Canal
Repairs to TGP Main Canal Chainage from KM92.833 to KM92.985
Construction of retaining wall on KMJ Canal near Manjeru Village
Improvements to outlet at km 90.950 of PABR Right Canal
Improvements to PABR right Canal betweenKm.25.000 to Km.30.000
Construction of Pipe Culvert at Km.2.500 of M.P.North Canal
Modernisation of M.P.South Canal from Km.0.000 to Km.40.000
Improvements to Canal Escape at Km.117/565 of RBLLC.
Improvements to U.T. at Km.19.895 of PABR Right Canal
Improvements to 2nd distributory of M.P.North Canal of MPR Dam
Construction of Inlet at Km 94.210 on PABR Right Canal
Construction of Inlet at Km 93.590 on PABR Right Canal