Loading…
Loading…
13,359 results • Best match
Construction of retaining wall on KMJ Canal near Manjeru Village
Improvements to inlet at Km 20.750 of PABR Right Canal
Construction of cause way @ 38.32 across canal syphon of YLMC
Improvements to SP at Km 22.670 of PABR Right Canal
Providing CC Road at Rajiv Nagar Canal in 21st ward
Construction of Inlet at Km 95.100 on PABR Right Canal
Jungle clearance in Power canal section reaches of TB Dam
Restoration of canal slip portion at km 63.750 of RBHLC
Cleaning and desilting of Y.Kothapalli Major canal under GKLI Scheme
Repairs to TGP Main Canal Chainage from KM89.200 to KM89.300
Providing Steel foot bridge at Km 5.900 of Power Canal
Repairs to TGP Main Canal Chainage from KM88.270 to KM88.440
Repairs to TGP Main Canal Chainage from KM93.135 to KM93.285
Reconstruction of DL Bridge on Injaram canal near Nelaparthipadu village
Improvements to HLC Canal and Quarters at Ballari and Allipura.
Improvements and repairs of 24th Distributory of M.P. South Canal
Providing Ramps at Km 3.000 and 16.000 of Power Canal
Cleaning and desilting of Y.Kothapalli Major canal under GKLI Scheme
Improvements to outlet at km 90.950 of PABR Right Canal
Repairs to TGP Main Canal Chainage from KM89.100 to KM89.200
Repairs to TGP Main Canal Chainage from KM88.100 to KM88.270
Repairs to TGP Main Canal Chainage from KM93.800 to KM93.950
Repairs to TGP Main Canal Chainage from KM86.100 to KM86.250
Repairs to TGP Main Canal Chainage from KM85.300 to KM85.450
Repairs to TGP Main Canal Chainage from KM93.650 to KM93.800
Repairs to UT at KM 81.200 of TGP Main Canal
Repairs to TGP Main Canal from Chainage KM90.520 to 90.720
Completion of incomplete B.T.Road at Vittanalavari canal in 14th ward
Repairs to UT at KM 79.400 of TGP Main canal
Repairs to inlet at KM 10.400 of Tadipatri Branch Canal
Construction of walkway across Main KC Canal at Km 7.000
Improvements to the 15th distributory of mid pennar south canal
Construction of walkway across Main KC Canal at Km 15.100
Improvements to Canal Escape at Km.117/565 of RBLLC.
Improvements to 2nd distributory of M.P.North Canal of MPR Dam
Construction of Inlet at Km 94.550 on PABR Right Canal
Sub Head Providing Electrical installations to the Gno1 and restoration of three phase power supply to pump room and office building by replacement of damaged UG cable and other allied works.
Desilting of K.C. Canal within Kurnool Municipal Corporation Limits.
Providing Leading channels in Gosthani river from Thatipudi to Boni Head water works in various places and providing sand bags across irrigation canal to divert the water in gosthani river at the time releasing water from thatipudi reservoir under AE-24 section under summer action plan-2024
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management of HS of kunkalamarru channel at k.m 77.300 L/B of Commamuru canal,HS of karamchedu new channel at k.m 85.050 L/B near kunkalamarru and karamchedu villages in karamchedu mandal of Bapatla Dist.
Water Resources Department- B.R.R. Vamsadhara Project- S & L Operation estimate for entire canal network under Mahendratanaya Offshore Reservoir Project to provide irrigation facilities for an ayacut of 24600 acres in Meliyaputti, Nandigam and Palasa Mandals as well as providing drinking water facility to the Palasa-Kasibugga Municipality
Annual Maintenance Estimate of Operation and Maintenance of Polavaram Irrigation Project Right Main Canal for Silt Removal Accumulated Earth due to heavy rains in catch drains on L/s and R/s from Km 0.000 to Km 68.911/71.500 for the the period 01.04.2025 to 31.03.2026
Removal of Tape Gross on Narasapuram Canal from km.30.400 to 40.200 and Achanta Channel and its branch channels from Km.0.00 to 11.00 and Rapaka Channel and branch channels from Km.0.00 to 26.000 and for the F-1433 in the jurisdiction of Irrigation Section, Marteru.
Strengthening of Channel bank on Junnuru left side Channel from Vedangi to Chakirevukunta village limits in Palakollu Mandalam in the jurisdiction of Irrigation Section, Narasapuram
Strengthening of damaged bund in deep cut portion of CBR Right Canal between Km.20.000 to Km.25.000 in Lingala Mandal of YSR Kadapa District
Providing CC side walls to improve the canal conveyance efficiency in vulnerable reaches for main canal in between Km 288.400 to Km 288.600 of TBP LLC
Beautification of the Canal bund on South side of Eluru delta canal from Car Repair stand to Sumitra wine shop along Tanuku road in Tadepalligudem Municipality.
Supply & erection of control panel board with all necessary accessories at samalakota canal loacks to provide power supply for pumping the water during canal closure period .
Providing CC Side walls in Phase to improve the canal conveyance efficiency, including vulnerable reaches between Km 304.250 to Km 305.650 of TBP LLC Main canal.
Providing CC Side Walls to LLC Escape at KM 322.220 and to GDP Project to LLC Main Canal to improve canal conveyance efficiency in vulnerable reaches