Loading…
Loading…
6,599 results • Best match
Upgradation/Improvement of lift irrigation station Kotgarhi H/L by way of replacement of worn out/rusted/damaged sections of 300mm dia. Mild steel rising main.
supply installation testing and commissioning of Link set and drop out set and other allied items at various Lift irrigation de-watering schemes of MISD-Sumbal
Irrigation works
Irrigation works
Irrigation works
Irrigation works
Irrigation works
Clearance of Tawi Syphon of distributary No. 9 of Main Ranbir Canal from RD 850 to 1600 Mtr. 4 Nos of road xing RD 4413 mtr, Nai Basti, RD 5900 mtr Digyana Pulli, RD 6600 mtr Digyana Ashram and RD 7700 mtr Gangyal of D-9 of MRC)
Hiring of private vehicle for inspect of various Government works/ Irrigation works of Irrigation Division Akhnoor during the year 2026-2027
RECTIFICATION OF LEAKAGES IN 750MM DIA D.I. TRUNK MAIN PIPELINE UNDERNEATH RAILWAY BRIDGE ALONG BANK OF IRRIGATION KHUL AT SEBDAN FOR WATER SUPPLY SCHEME SUKHNAG
Silt Clearance from Distributary No 3F RD 0 to 3900M Disty No.4 RD 0 to 6000M of MRC
Reconstruction of fall and canal section of Broota minor of D11 of MTC from RD 0-3200M at spots
Providing of men, Machinary, materials for execution of emergent works at site as per requirement due to breaches floods calamitiesencroachment removal etc of Dadi canal Major Medium Irrigation MandR 2701 for the F.Y 2026-27 Phase 2nd.
Irrigation works
Irrigation works
Irrigation works
Irrigation works
Irrigation works
Irrigation works
Silt and Mulba clearance of canal Syphon Dumra Ist at RD 29550 M of Main Ravi Canal
Silt/Mulba Clearance of Burni-II Canal syphon at RD 10408-10540 M of Main Ravi Canal
Kanir Canal-Construction of cement concrete drain at Dadwachoo minor of Kanir canal at RD-3680 downstream
Silt and Mulba clearance from Burni-2nd canal syphon from RD 10408-10540m of Main Ravi Canal
Annual maintenance of various 2 ton gates installed on Tawi canal and Ravi canal during closure period.
Silt and Mulba clearance from Burni-1 canal syphon from RD 9860-9965m of Main Ravi Canal
Silt and Jungle clearance from Burni 1st Canal Syphon and Main Ravi Canal RD 9860 to 10408M.
Protection Wall of Dabber Potha Canal at spots, restoration of Rajpur Kamila and Jindapeer Canal at spots
Restoration of Labertal canal branch of Karshan Canal at Sholipora by way cement concrete work near flume.
Constt. of Irrigation Channel at manoti wno 4
Improvement Augmentation of Irrigation channel of LIS Aryanpura.
Construction of Irrigation Khul Mohalla Floor Panchayat Salotri
Construction of irrigation Channel at W No. 6
Constt. of Irrigation Channel at manoti wno 4
Supply and Installation of Raingun Irrigation System at
CONSTRUCTION OF IRRIGATION GUEST HOUSE AT RAJAL NOWSHERA
Upgradation of Irrigation Khul at Lowar Sadyal Tuntitarar.
Purchase of various items for strengthening of irrigation
CONSTT. OF IRRIGATION LADH AT ATTEWUTH BLOCK ANANTNAG
CONSTT. OF IRRIGATION KHUL NEAR MS LEHAR SANGPUR
Development of Irrigation Khul at Bongham Khanmoh B
C/O IRRIGATION LADH AT ZARER KURAN TELWANI
C/O IRRIGATION CHANNEL AT KH PORA 2
Irrigation works
Irrigation works
Irrigation Works
Irrigation works
Irrigation works