Improvements to Structures and Service road of 3rd Z/D under Malebennur Branch Canal in Honnali Taluk Davanagere district.
Reconstruction of Pipe outlet and fixing of MS Gate in 7th Zone under Davangere branch canal in Mayakonda Constituency
Improvements to Structures and Service road of 4th Z/D of Malebennur Branch Canal in Honnali Taluk Davanagere district.
AME (Manpower) of Laterals L-1 to L-7 of Distributary 15 of IBC for the year 2025-26
AME (Manpower) of Laterals R-1 to R-8 of Distributary 22 of IBC for the year 2025-26
Repairs to damaged lining, CDs & SR in selected reaches of Distributary No.8A of NRBC Not considered in ERM
AME (Manpower) of Laterals L-9 to L-14 of Distributary 16 of IBC for the year 2025-26
AME of Distributary 30 and its Laterals L-1 to L-12 of of ILC for the 2025-26
AME (Manpower) of Laterals R-1 to R-4 of Distributary 16 of IBC for the year 2025-26
AME (Manpower) of Laterals L-1 to L-8 of Distributary 16 of IBC for the year 2025-26
Removal of silt and weeds in selected reaches from Harohalli pickup canal and and Neeralla pickup canal
Improvements to canal and construction of CD works in Dy 13 and 14 under Krishnarajanagar Branch Canal
Canal maintenance at Selected Reaches of 11th & 12th Block of MRB Canal for the year 2025-26
Improvements to canal and construction of CD works in Dy 11 and 12 under Krishnarajanagar Branch Canal
SOLAR PHOTO VOLTAIC IRRIGATION PUMP SYSTEM 15 HP
Repairs to Office building at Irrigation Colony Kulageri.
Repairs to Quarters building at Irrigation Colony, Badami
Repairing existing drainage system of irrigation colony Naragund
Repairs to Quarters building at Irrigation Colony Kulageri.
SIMCOE IRRIGATION ASPIRATION CANNULA 22G Accepted Make Brand;
Improvements to Canal & Service road
RESIN based Root canal SEALER (Dental)
Providing Irrigation facility through borewell to Land survey No.121/17 in Singapura village, Hireguntanur Hobli under SCP chitradurga taluk and district (Electrification)
Conducting third party inspection and consultancy services for quality assurance for Development works for Distributory Canals (D-71 to -D72) Coming Under HLBC
Removal of Silt and Jungle in selected reaches of MRBC and MLBC main canals and Repairs to structures for the year 2025-26
Improvements to Feeder Canals of Malavalli Tank and Improvements to Road Connecting Maddur Malavalli Road to Thalagavadi Village in Malavalli Tq, Mandya Dist
Removal of silt in selected reaches to zone 9 (B) at 32.00 km of Malebennuru Branch Canal in harihara constituency
AME of Canal Network of ILC main canal from Ch.15.00km to 32.50km for the year 2025-26
AME of Canal Network of ILC Main canal From Ch 8.50km to 15.00km for the year 2025-26
Removal of Jungle in Lateral -7, Lingaiahanakatte link canal of D-26 and Dyst.41.50km of D.D.Urs Canal.
AME of Canal Network of IBC Main canal From Ch 0.00km to 5.00km for the year 2025-26
Construction of Box Drain, Drops and CD works to Tavarekere Feeder Canal near Hundimala village under Hanumanthapura Canal.
Feeder canal lining
Earthwork excavation,Formation of Embankment,Repair and improvements to damaged canal Lining and structures due to rain Flood in Main canal Km 207 to 212Km coming under UTP Main canal .
Providing water management to D-6 Distributary of NBC From KM 6.00 to KM 12.00 for the year 2025-26
Providing water management to D-6 Distributary of NBC From KM 13.00 to KM 18.00 for the year 2025-26
Providing water management to D-6 Distributary of NBC From KM 0.00 to KM 5.00 for the year 2025-26
AME of Distributary 32 and its Laterals L-1 to L-15 of of ILC for the Year 2025-26.
Providing water management to D-6 Distributary of NBC From KM 18.00 to KM 24.00 for the year 2025-26
Removal of Silt and Jungle in Selected Reach of D-6 Distributary of NBC FROM KM 12.00 to KM 17.00
Removal of Silt and Jungle in Selected Reach of D-6 Distributary of NBC FROM KM 6.00 to KM 11.00
Removal of Silt and Jungle in Selected Reach of D-6 Distributary of NBC FROM KM 18.00 to KM 24.00
Construction of CC Drain from Gopala main road to Ramesh farmhouse coming under 7th Distributary of BRRBC in Tarikere taluk.
Removal of Silt and Jungle in Selected Reach of D-6 Distributary of NBC FROM KM 0.00 to KM 5.00
Replacement of pipeline in Ranaveera colony at w no 8 and Srinivasanagara in w no 6 Leakage repair and sand barrage at Mundli Dam providing wooden planks to Ramasamudra check dam 10 HP and 40 HP monoblock pump repair in Ramasamudra WTP in Karkala TMC limit
Repairs to Escape Gates at 65.550km in GRBC Main Canal
Re-construction of Bridges at Ch 1.80 km and Ch 2.30 km (near Kadajji village) in HPD under Davanagere Branch canal
Construction of Bridge at chainage 36.00km of Anvery Branch canal Near sadashivapura Village of Honnali taluk (Including sopanum and service road)
Removal of silt and Jungle and construction of Protection wall in Jalibenchi LIS Link canal Under D-14 of RBHLC (Reserved SC Category)
Quality testing machinery for PVC pipes and LLDPE and hydraulic laboratory equipments