Loading…
Loading…
9,644 results • Best match
Earthwork Excavation, formation of embankment, Repairs and improvements to the damaged canal lining and structures due to rain flood in Main canal Km 203 to 206Km coming under UTP Main canal.
Desilting work of Storm water drains and canals located in Ward No 35 33 27 32 in Zone-03 of SCC (Reserved for SC)
Removal of slipped earth and clearence of jungle in atchkat canals of Vignasanthe tank ,Alburu tank and Bajaguru tank for the year 2025-26
Removal of silt in Kallahalli branch Chamalapura branch , patel uddi, Kumbara hikkalu,17, & 17(A) hikkalu, pickup canals & uddi under 9th branch of CRBC
Repairs to POs CDs, Gates, Embankment, Lining and Removal of silt and jungle of D-66B, D-67 Including Minors and Thonnur Tank Canals
Annual maintenance watch & ward of canals and water management of Gayathri Reservoir for the year 2025-26 for the period from 01.04.2025 to 31.03.2026
Supply of Irrigation Equipments & Agricultural Equipments to NSS, Hesaraghatta.
Supply of Various categories of Man power required for water management under Annual Maintenance of canal and for Annual Maintenance of IB & ID colony at Harihara & Vehicle KA-17-G-0647 under Annual maintenance for the year 2025-26 Pertaining to KNNL ... H.B. Canal Sub ...
Hiring of machinery for clearing jungle from ch. 0.00 to 1.10km of link canal of Taraka right bank canal
Jungle clearance of Main canal from ch. 45.000 to 55.000 km of MRB Canal for the year 2025-26
Removal of Silt & Jungle in selected Reaches of Hosaholalu high level canal and Rayarane pickup canal Coming under HLBC.
Removal of Jungle and silt in Khajanegowda pickup canal,sakamma pickup canal of Dalvoy tank.(RESERVED FOR CAT-IIA)
Repairs To Gates Bijapur Main Canal and Malagon West Canal including Control Room at Y Junction MLI Stage - III
Removal of silt and jungle in Intake canal & Forebay for Savalagi-Tungal East canal for the year 2025-26
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 5.00 to 6.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 0.00 to 1.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 2.00 to 3.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 1.00 to 2.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 4.00 to 5.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Maintenance repairs and improvement works in 128, 130, 132, 136, 137, 145 & 149 PO Canal under CDS Main Canal.
Earthwork excavation formation of embankment, providing lining to canal damaged portion due to rain flooding and control the seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal ... main canal from ... UTP canal network
Construction of cut & cover conduit in deep portion at ch. 55.450 to 55 .930 of MRBC Main canal and other canal improvements works in Km 63 to 71 of MRBC Main canal
Clearing apu jondu in Katttemallavadi anecut canal
Removal of silt in Nuggehalli LIS canal.
Improvements to GLBC Main Canal Service Road
Improvements to Kallahally branch under Hullahally Canal
SPREADING OF PIPE LINE AND IRRIGATION TO ALL EXPERIMENTAL GARDEN AT CPCRI RS VITTAL
CONSTRUCTION OF SALAPURA BRANCH CANAL-2 FROM CH 7.00 to 8.15KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
DISPOSABLE IRRIGATION ASPIRATION CANNULA 22G %u2013 SIMCOE -THE IRRIGATION AND ASPIRATION PORT SHOULD BE VERY CLOSE TO THE TIP, ALLOWS FREE FLOW OF FLUID
CONSTRUCTION OF TIMMAPURA BRANCH CANAL FROM CH 6.00 to 7.00KM OF TIMMAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Jungle clearance and silt removal of selected Reaches of GLBC Main Canal, Mudhol Branch Canal & other connected canal network & other repair work coming under Mudhol sub division for the year 2025-26
Providing safety barrier/crash barrier to Southermane branch canal near Talkad hale beedi under Madhavamantri anecut canal and from ch.0.00km to 0.40km & from ch.58.00km to 59.00km of Ramaswamy Anecut canal.
Providing water management to 17L Sub-Distributary & laterals of NBC From KM 0.00 to KM 10.00 for the year 2025-26
Removal Of Silt And Jungle Clearance of trough Aqueduct from2 Ch 3.8km to 5.42 km of , Distributary-3 of MLIS-1
Repairs and Maintenance of office building pertaining to No.3 Bhadra canal subdivision, Thyavanigi for the year 2025-26 (Reserved for SC)
Construction of Bridge at ch-22.60km of Anvery Branch canal Near Channamumbapura Village of Honnali taluk (Including foot bridge and service road)
Removal of silt & Jungle at selected reaches from Km0. 00 to 8.94 of Gorebal pick up feeder canal coming under Distributory 36 of TLBC
Supply of Various categories of Man power required for Water Management under Annual Maintenance of Canal and Annual maintenance of IB & ID Colony at Davangere and Vehicle crew charges KA-17 G-0615 for the year 2025-26 pertaining to KNNL, No.2 Bhadra ... Bhadra Canal Sub ...
Removal of Jungle in Marse pick up canal of dalvoy tank and Shettikere canal of Shettikere tank.(Reserved for SC)
Restoration of damaged portion of canal and SR formation at 4.2km to 4.5km of DC-2 Main Canal of TLIS
CONSTRUCTION OF SALAPURA BRANCH CANAL - 1 FROM CH 6.00 to 7.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Repairs to Breached Bankwork and Canal Lining at Selected Reaches From CH 11.00 to 14.00 of KLIS-II RBC Canal
Removal of Silt & Jungle clearance Main Canal from 0.00 to 10.00 Km & Dy-1 of Nagathan Branch canal ( Selected Reaches)
AME of Canal Network of ILC Main canal From Ch.0.00km to 8.50km of ILC for the year 2025-26
CONSTRUCTION OF SALAPURA BRANCH CANAL - 1 FROM CH 8.00 to 9.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF SALAPURA BRANCH CANAL-2 FROM CH 6.00 to 7.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Removal of Silt And Jungle in selected Reaches of Rayarane pickup canal and Hosaholalu High Level Canal Coming under HLBC.
AME of Canal for the year 2026-27 of Sonthi Branch Canal & its laterals and sub laterals of Sonthi LIS
Removing Silt in deep cut section of canal and distributries coming under Karimasuti west canal for the year 2026-27
Removing Silt in deep cut section of canal and distributries coming under Halyal west canal for the year 2026-27