Loading…
Loading…
9,644 results • Best match
Removal of Silt & Jungle in selected Reaches of Doddankatte pickup anecut canal and B.Bachahalli High level canal Coming under HLBC .
Improvements of PO Canal at Ch.9.78 & 10.178 Km of Shimsha Right Bank canal of Maddur Taluk and Mandya District.
CONSTRUCTION OF SALAPURA BRANCH CANAL - 1 FROM CH 9.00 to 10.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF SALAPURA BRANCH CANAL-2 FROM CH 1.00 to 2.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
CONSTRUCTION OF SALAPURA BRANCH CANAL - 1 FROM CH 2.00 to 3.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS
CONSTRUCTION OF SALAPURA BRANCH CANAL - 1 FROM CH 1.00 to 2.00KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Removal of Silt & Usage of Machinery Hydraulic Excavator for silt & jungle removal.
Providing the Man power services for 3 months on outsourcing basis for dredging of drains/canals with precautionary measures for rainy season. and refer tender documents for detailed description.
Facility Management Services - LumpSum Based - Office of Executive Engineer KNNL BLIS Division Afzalpur; Computer Operator 04 Nos and Drivers 04 Nos and Light Mazdoor 03 Nos for period of 1st April 2025 to 31st March 2026; Consumables to be provid..
Repairs to Gates and Removal of silt from ch 33.00 km to 37.00 km of Malebennur Branch Canal Reserved for CAT-II A
Improvements to Structures and Service road of 5th Z/D and 6th Z/D of Malebennur Branch Canal in Honnali Taluk Davanagere district.
Repairs to Regulator no.4, POs of 13th, 14th, 15th, & 9th B Distributorys, watchman room at R4 and R5 under Davanagere Branch Canal
Supply of man power for water management of Tugabhadra Left Bank Main Canal from Mile-24.00 to 36.00 and Distributaries No-17 to 25 with their sub distributaries of TLBC ,Odderahatti Camp Colony including Upper Gangavathi and Lower Gangavathi ... No.1 Canal Sub ...
Supply of man power required for water management of Anvery Branch Canal from Ch.0.00 to 66.67Km and Distributories from 1 to 40 under bhadra canal annual maintenance and AME of WRD coloy and AME of Vehicle KA-17 G-462 at Sasvehalli under Bhadra annual maintenance for the year 2025-26
Repairs to Roof of IB building at Irrigation Colony Badami
AME (Manpower) of Distributary 59 from ch 21.0 to 23.0km and ch 25.00 to 27.00 of ILC for the year 2025-26
Restoration of Distributary-1 on IP Side from Ch. 0.550 KM to 0.920 KM and 1.665 KM to 2.005 KM of ALBC
REPAIRS TO CANAL LINING DAMAGE AT 10.50 KM TO 11 KM OF ALLAGI MAIN CANAL DUE TO FLOOD UNDER BLIS AFZALPUR.
Removal of Jungle in Marse pick up canal of dalvoy tank and Shettikere canal of Shettikere tank(RESERVED FOR CAT-1).
Removal of Silt and Jungle in selected Reaches of Doddankatte Pickup Anecut Canal And B.Bachahalli High Level Canal Coming Under HLBC.
Removal of Silt and Jungle clearance of selected reaches coming under Sonthi Feeder canal & Sonthi main canal(Excluding Trough aqueduct portion)
Repair of canal lining and SR Improvement of Sonthi Main Canal from Ch. 10.00 Km to 18.00 km of Sonthi LIS
CONSTRUCTION OF SALAPURA BRANCH CANAL-2 FROM CH 4.00 to 5.00 KM OF SALAPURA MAIN CANAL INCLUDING STRUCTURES UNDER SALAPURA LIS.
Removal of Silt and Jungle of Kalliguddi Main Canal & Hulakund Branch Canal (Selected reaches) under SRLIS for the year 2025-26.
Endomethasone Root Canal Sealer (Powder 14gm.+ Liquid 10ml.) OR Endomethasone Root Canal Sealer in Paste form (Base+Catalyst) 14gm.+ Liquid 10ml.)
Endomethasone Root Canal Sealer (Powder 14gm.+ Liquid 10ml.) OR Endomethasone Root Canal Sealer in Paste form (Base+Catalyst) 14gm.+ Liquid 10ml.)
Improvements to 2 No. of Pickups & 4 No. of pickup Canals, Improvements to Kolur LIS under D-13 of RBHLC, Construction of Korlagundhi / Dammur LIS near Dammuru Village in Ballari Tq & Dist Under KMERC Grant. (Including operation and maintenance for a period of 5 years after successful completion of work on Turn-Key Basis)
Package work for Removal of silt ,and jungle from ch 0.020 to 1.800 of L/S canal of parapur tank , from ch 0.020 to 2.500 of Huligudda tank canal , from ch0.020 to 2.680 of jeenahalla link canal, from ch 0.020 to 3.120 of Galag tank canal of Devadurga Taluk
Re Construction of Bridges and Karadihalla Pickup at CH 5.00 KM, CH 11.01KM , CH 15.00 KM and CH 16.60 KM of Malebennur Branch Canal
Removal of slipped earth in Nuggehalli LIS canal.
Improvements to Lakshmipura Branch Canal Coming Under MLBC
Improvements to Antharavalli tank canal in Malavalli Taluk.
Removal of Jungle from Ch. 0.00 to 3.00 KM of D42 (DY91350) and DPO canals from DPO27 to DPO35 of DDUC for the year 2025-26.
Minor repairs to dy-10 of west canal and removal of silt and jungle to canal of Dy-10 and its minor of west canal of DC-2 of TBLIS for the year 2025-26
Construction of bridge to canal near Nagarle village and other Improvements work under Hullahalli canal in Nanjangudu Taluk (Reserved for SC Contractor)
Raising of Plantation at Islampur Main canal to Gulabal Main Canal- 3 Km in Sf Range Shorapur for the Year 2026-27
Hiring of machineries for clearing jungle in D-40 of Taraka left bank canal, left and right sluice canal of Savve tank
Improvements of PO Canal at Ch.11.750 Km of Shimsha Right Bank canal (7th Mile PO) of Maddur Taluk and Mandya District.
Improvement of Canal in damaged portions of Minor-12 offtaking at Ch-15.376KM of Dy-4 of UTP Main canal (Selected Reaches)
Improvement of Canal in damaged portions of Minor-7 offtaking at Ch-13.009KM of Dy-4 of UTP Main canal (Selected Reaches)
Improvements to canal system for Distributory D-6 in selected reaches coming under Tumkur Branch Canal of Tiptur taluk(from 6.5-10.88km)
Restoration of canal section and repairs to Slipped portion from km 73.000 to 73.400 in Km No-74 Under GRBC Main canal
Construction of Draft canal to Seetarampura kere, improvements to Doddakere Draft canal, Protection wall in Sy No.126 near Gondi Canal At 37.00 km of Gondi RBC) of Seetharampura Village of Bhadravathi Taluk Package No.8
Removal of silt in selected reaches to zone 9 (A) at 32.00 km of Malebennuru Branch Canal in harihara constituency for the year 2025-26
Removal Silt and jungle of Avaradhi Distributary from Km 0.00 to 6.00 Km and its Laterals under GRBC for the year 2025-26.
AME (Manpower) of Laterals R-10, R-11, L-1 and L-2 of Distributary 22 of IBC for the year 2025-26
Removal Silt and jungle of Avaradhi Distributary from Km 6 to 13 and its Laterals Coming under GRBC For the year 2025-26.
Removal of silt from Ch-28.00 kmto 32.00 km of Malebennuru Branch Canal in harihara constituency for the year 2025-26 (Reserved for SC Category )
Annual maintainance of munavalli irrigation colony for the year 2024-25.
Providing & fixing sheet roof to A1 quarters of Saundatti irrigation colony.