Loading…
Loading…
9,644 results • Best match
Annual maintenance of Irrigation colony at Badami for the year 2025-26
Annual maintenance of GRBC Lokapur Irrigation colony for the year 2025-26
PRESSURE BAG FOR 3 LITRES FLUID USED FOR UROLOGY AND HYSTOCOPE IRRIGATION
PRESSURE BAG FOR 3 LITRES FLUID USED FOR UROLOGY AND HYSTOCOPE IRRIGATION
Repair and maintainence of canal
Improvements to roads in Doddabyadigere village in Hebbalu G.P, Rayapura Koppalu village in Bantenahalli G.P, Improvements to canal bund at selected reaches of kudlur canal and Construction of Retaining wall to Kudluru canal Atchkat under Yagachi Reservoir Project in Belur Taluk
Providing protective works, Box drain in2nd 3rd ,17th PO Canal and Providing protective works in 24th dy at selected reaches under VC and Construction ofBox drain and protective works to 105th PO canal under CDS main canal in Pattasomanahally village.
Construction of Multi Aarch Check Dam at Sawantwadi patil at Managuatti village in Hukkeri Taluka Belagagvi Dist
Removal of silt
Removal of silt & jungle clearance from chainages km 30.00 to 40.00 of main canal and tamba canal from 0.00 to 8.00km of NBC (selected reaches)
Improvement of Canal in damaged portions of Minor-5(KM-6.00-10.00) offtaking at Ch-9.940KM of Dy-4 of UTP Main canal (Selected Reaches)
AME of Main canal from Ch.50.00 to 60.00 KM & Cross regulator gate at Ch.51.150 of Nagathan Branch Canal for the year 2025-26.
AME of Canal Network for IBC main canal from Ch17.50km to 20.00km and Dy.No 4 and its laterals of IBC for the year 2025-26
Improvements to canal and Service road of High level canal coming under Dharma project in Hanagal taluk of Haveri District for the year 2025-26.
Removal of Silt and Jungle Clearance of main canal from Ch 62.00 Km to 69.00 Km of MLI West Canal for the year 2026-27
Removal of silt and jungle clearance and repairs to dilapidated portions in Distributary No. 19, 19( R),20,21,22,23,24,25,26(R) ,27,28 and 28( R) of HRBC.
Replacement of Existing 1300HP VT pumps, providing trash rack to Head regulator, EOT crane for the maintenance of gate valves & NRVs, servicing and overhauling of air chamber surge protection, CC thrust blocks to 1500mm dia PSC pipe line joints and ... and check dam across ...
Block level Survey for the command area of Uduthorehalla Reservoir Project canal with RS maps to show the area proposed for the FIC network to mark the field channels on the RS maps which shall correlate on the ground profile The FICs shall be preferably along the boundaries as per the field conditions in the alignments suitable cross drainage and structural works are to be proposed at required the position and designed Preparation of estimates for FICs Collection of documents like RTC etc with detailed drawings and designs comprehensive report L sections of FIC and Preparation of AUTOCAD maps joining map and individual sketches and Superimposing of sketches on the RS Map etc
Earthwork excavation, formation of embankment, providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal , Repairs and improvements to the damaged canal ... UTP canal network.
REMODELLING OF NAGAMANGALA BRANCH CANAL
Improvements to Hemavathy park near HLBC main canal in Channarayapatna.
Modernization of Distributory No-35 under Kabini right bank canal
Improvements to Service Road of RBC canal of Turuvekere Tank
Repairs of Canal Escape in Ch 85.905 km of HLBC.
Repairs to Lining at ch 4.45km of MBC Main Canal
Restoration damaged CC lining at Ch10.76m of JBC Main canal.
Restoration of Lining at Ch 67.40Km of SBC Main Canal.
Excavation for POs channel and FIC under BHLIS canal network
Providing Crash barrier to HLBC main canal near BCM hostel.
Providing Consultancy services for Survey, Investigation, Preparation of Detailed Estimates and Drawings for Irrigation of 605 Ha ICA by lifting water at Chainage 3.90 km from VLIS Main Canal For Stage-II work, including DTP Works, with Submission of 7 Nos of hard copies and Soft Copies
Removal of Silt and Jungle clearance in selected reaches of main canal for smooth flow of water in canal for tank filling schemes
Removal of Silt and Jungle clearance in selected reaches of main canal for smooth flow of water in canal for tank filling schemes
Improvement of ayacut road from main canal Guggam Land to towards revansiddappa land of Bedagpalli village under LMP Project in Chincholi Taluka.(Sedam Constituency)(Category-IIA Reserved Work)
CONSTRUCTION OF A FOOT BRIDGE ACROSS THE LEFT BANK CANAL ROAD CONNECTING TO SIRIYURU CANAL FROM DIWAKAR LAND IN KALLAHALLI GRAMAPANCHAYATH BHADRAVATHI TQ, (Reserved For SC)
AME of Canal Network of IBC Main canal From Ch.5.00km to 10.00km and Dy no.2A main,left and right for the year 2025-26
AME of Combined canal from km 0.00 to 2.10 and west canal from km 0.00 to 52.925 km of Chimmalagi LIS for the year 2025-26
Removal of Jungle from Ch 0.00 to 11.50km of Giribettadakere Link canal coming under the atchkat of D-24 of DD Urs Canal(RESERVED FOR SC)
Repairs to damaged portion of UTP Main Canal in between ch. 7 to 8th km to arrest leakage from canal bed for the year 2025-26
Conducting survey & preparation of detailed project estimate for the Improvements of Padamane pickup canal in Lakya Hobli Chikkamagalur Taluk and Balehalli pickup canal in Chikkamagalur Taluk.
Improvements and Removal of Silt in 15th Dy, 21st Dy, 23A dy, Minor of 24th Dy, Maraliga tank Sluice Canal and Kodihalli Pickup Canal under KBR
Improvements to canal system for Distributories D2(Ch455m to 2910m) and D3A(Ch 0m to 250m) in selected reaches coming under Tumkur branch canal(Balance Work)
Repairs & Maintenance for Drainage system and Electrical repairs and Annual maintainance of Savadatti office Irrigation colony and Irrigation colony near SLAO Cross for the year 2025-26.(Reserved for SC bidder)
Repairs, painting and maintenance of LI 4 Subdivision office & staff quarters of Savadatti office Irrigation colony and Irrigation colony near SLAO Cross for the year 2025-26 (Reserved for SC Bidder)
Improvements and restoration of breached portion of canal at ch-245.325km, ch-250.04km, ch-252.90km and ch-256.80km off Dy-6 of offtaking at ch-244.450km of UTP main canal (due to heavy flood) (Proposed chainage 232.00km to 242.00km of UTP main canal)
Annual Maintenance of irrigation Colony of Shirasanghi and chikk-Nargund. ( Including Electrical Bill )
Annual maintenance of office and irrigation Colony Hirekumbi for the year 2025-26
Renovation of A-1 type Quarters to MLA office at Saundatti irrigation Colony
Continuation work of Repairs to Roof of IB building at Irrigation Colony, Badami
Establishment of irrigation system to cardamom mother block at ICAR-IISR- RS, Appangala
DISPOSABLE IRRIGATION ASPIRATION CANNULA (SIMCOE) Accepted Make/Brand:Cardiocare brand Disposable Simcoe cannula 22G