Loading…
Loading…
9,644 results • Best match
Construction of Pedestrian bridge for crossing of canal towards boundary at ICAR IIHR Farm Hirehalli, Tumkur
Annual Maintenance of Sub Division Konnur Office Building and irrigation Colony. (Including Electrical Bill )
Special repairs and AME of Irrigation Colony at Byahatti for the year 2025-26
Annual Maintenance of Temples in Vishweshwarayya irrigation colony Dharwad for the year 2025-26.
Annual Maintenance of Irrigation Colony V V Nagar Belagavi for the year 2025-26
Removal of silt & jungle
Providing Box drain to Ramegowdanapura tank feeder canal in T.Narasipura taluk.
Construction of FIC to DPO-1A of Block-4, DPO-3 of Block-6,DPO-4 of Block-7,DPO-5 of Block-8,DPO-7 of Block-10,DPO-8 of Block-17,under Chachadi Main Canal and OL-1 of Block-11, OL-2 of Block-12(FIC-1A&1B),OL-3 of Block-13,OL-4 of Block-14,OL-5 of ... under Distributary Canal -3 ...
Reconstruction of Pipe culvert at ch.1.00Km (after PO no.4) of 12th distributory & repairs of Damaged Road connecting from Honnur village to Vaddinahalli village under Davanagere Branch canal. (Reserved for CAT-IIA)
Removal of silt in Selected reaches of Nalluru Branch Canal from ch 0.000 to 10.917 km and Chowkalli Branch canal from ch 0.000 to 2.00 km under Hanagodu series
Construction of supervpassage at Ch 20.20Km of Gondi RBC and feeder canal to Hirekere tank of Hosamane Thammana Colony of Bhadravathi taluk.Widening of GONDI CANAL FROM CH 19.500 to21.380km
Removal of silt and Jungle in selected reaches of PO-05, kannikere tank canal and Madapura branch canal coming under Dy 09 of HRBC for the year 2026-27
Maintenance of Canal side and road side Plantation for the year 2024-25 raised during 2023 rains at Gap Filling at ALBC Canal side and Thangadagi road. (9600 Plants)
Improvement to Canal and Kaaginele tank Nala crossing at Ch.241.050 km and Improvement to Damaged Road Cross bridge of Kabbur Village at Ch.241.50 of UTP Main Canal.
AME of Providing Man power for Water Management from ch.38.00 to 43.694km (including Canal Syphon at ch. 37.498km) of Varahi Left Bank Canal for the year 2025-26
Maintenance of 2nd year old plantation at Kaknal to Donagapur Canal side, Nittur Circle and Chandapur Canal Side. Sy. No. - (Extent 12Ha.) in Bhalki Range During 2026-27 - (KFDF)
Removal of silt and jungle from Km 184.000 to 193.000 KM of UTP main canal, ,Direct Minors-37 to 41 of UTP Main Canal for the year 2025-26.
Providing and laying of 63 mm dia pvc pipeline from canal to cada bridge in ward no 5 and 6 AND old lake TLBC canal of maski town limit
AME of canal network for ILC Dy.No.20 and Dy no.21 of ILC and main canal from Ch 41.00km to 50.00km of ILC for the year 2025-26
Removal of silt and Jungle in selected reaches of PO-05, Kannikere tank canal and Madapura branch canal coming under Dy 09 of HRBC for the year 2025-26
Removal of Silt and Jungle Clearance from km 0.00 to 2.10 of Combined canal and its Dy-1 to Dy-3 of Combined canal and its laterals under CLIS.
Pursuant to National Disaster Management Regulations, de-silting of drains in Anavatti town panchayat, de-silting of royal canals for smooth flow of sewage and cleaning of town panchayat and government spaces.
Removal of Jungle and Silt clearance of Lat no.4 (from 0.00 to 1.11km) Lat no.5 (from 0.00 to 1.39 km) of BD-5 of Distributary-15
Supplying of man power for the water management of TBC & Distributary No 11A 12 &13 coming under the jurisdiction of No4 HCSD Gubbi for the year 2025-26
Supply of Manpower for Canal Water Management of D27 D30 D35 and from c h 55 to 62km 70 to 81 km c h 92 to 105 km and ch115 to127 km of DDU canal and Distributaries coming under these reaches Yenne hole RBC LBC and Kochan Halli pickup canal ... pickup canal LBC ...
Supply of Manpower for maintenance of Office building and Camp at Gillesugur camp, TLBC MAIN CANAL from mile 131 to 141, Distributaries 102A, 103, 104C, 104B, 104A, 104, 105 & 106 of TLBC for the year 2025-26.
Jewargi RangeRaising of Mansoon Road Side Plantation Nagarhalli to Kuralagera Main canal
Improvements to service road of HLBC main canal at ch.65th km.
Construction of Road Bridge at Ch 10.670 Km of CDS Extension canal
Maintainance and removal of silt in RBLL main canal and its branches
Repairs to Sattevva Direct outlet at Km 1.000 of GLBC Main Canal
Raising of Road side Plantation Chigarahalli Cross to Andola Main Canal side
Improvements to Nuggehally LIS gravity canal from ch 4.00 to 8.10 km
Construction of CC Drain to Gurugala Branch (Immavu Hundi) under Rampura Canal
Construction of Asphalt road at Ward no 14 NM Road to Canal.
Removal of Silt in Rampura RBC and LBC Pickup Canal under KBR
Raising of Road side Plantation Yakkanchi to Harakanchi Canal Side C/S
Raising of Road side Plantation Kurikota to Yakkanchi Canal Side C/S
Construction of CC Lining to Hallada Kaluve (Hadinaru Mole) under Rampura Canal.
Repairs to Gates of Dy-46,56 of Laterals of Indi Lift Canal.
Removal of silt from ch 0.00km to 17.50km of Kattemalalvadi Anecut Canal
Repairs to the lining of RMLIS canal for the year 2025-26
Construction of storm water drain or canal from Munishamappa house, Mothakahalli village
AME of Tamba canal and dy -18 for the Year 2025-26
Improvements to Left Side Sluice Canal of Devalapura Tank in Nagamangala Taluk.
Improvements to Nuggehally LIS gravity canal from ch 0.00 to 4.00 km
Improvement of road from Gujanal village to bellary canal of Gokak Taluka
Construction of Bridge at ch 8.700 of North Branch canal & other works
Improvements to SI Honnalagere Right bank canal in Maddur Talluk, Mandya dist.
Removal of Silt in Hodagatta Pickup and Hunjanakere Pickup Canal under KBR