Loading…
Loading…
9,644 results • Best match
Removal of silt and jungle in tank atchkat canal of Mallagatta tank
Improvements to Bandihole Branch Canal & Aqueduct in Bandihole Village, Under MLBC Atchkat.
Improvements to Structure and lining of Raibag High Level Distributory-2 canal
Consultancy services for preparation of Detailed Project Report for Remodelling of Distributary No 1,2,3,4,5,6 and 15 and its Sub-Distributaries of PLI Canal
Selection of Irrigation Service Provider Contractor for the development of Pressurized Piped Irrigation Network and provision of irrigation services to 2145Ha in Hattikuni Project in Yadgir taluka, Yadgir district, State Karnataka under Modernization ... Piped Irrigation Network ...
Removal of Silt and Jungle clearanceof selected reaches coming under Distributory-5, Distributory-6 , Sonthi Main Canal, Lateral-1 &2 of Distributory-4 of Sonthi Main Canal of Sonthi LIS.
CONSTRUCTION OF BOX DRAIN AND IMPROVEMENTS TO DRAFT CANAL FROM CH 0.90 TO 1.800 KM OF MUDHUGERE TANK CONNECTING TO RAMPURA CANAL COMING UNDER SDL3 IN DY 69400 OF DDUC.
Construction of 1000mt cement canal to 9th P O of 12th distry from Sy No 136/1 to 156 for Appox 30 Acres of land in Bhadra right bank canal
Providing and CC Lining to 8th and 9th km of CSD Canal ,Construction of cut and cover in 3rd Km and other Improvements works of CSD of Nagamangala Branch canal
Improvements to Canal system for Distributory D-9A (Ch-0.00 to 2.00km) and D-5 (Ch-0.00 to 1.10km & 2.00 to 5.10km) coming under Tumkur Branch Canal in Tiptur Taluk.
Maintenance of One year old Plantation at Nargund - Malaprabha canal 27 km block-4 Km,Nargund - Malaprabha canal 14th main distribution-7.5 Km total 11.50 Km Gadag Range (KFDF-RSP)
Construction of Protection wall/Compound Wall parallel to canal from Ch-246.080KM to 246.516KM of UTP Main Canal (In Horticulture University Land of Devihosur Village of Haveri Taluk, Haveri District)
Removal of Silt and Jungle in selected reaches of the main canal from Ch 0.00 Km to 2.20Km, 5.30 to 8.00km of Managuli Branch Canal for the year 2026-27
Improvement to service road, restoration of banking in selected reaches & repairs to canal lining portion including raincuts of Sonthi Main canal from Ch Km 0.00 to 10.00 in selected reaches.
Annual Maintenance of Chumari Block in Vishweshwarayya irrigation colony Dharwad for the year 2025-26
IRRIGATION SET TURP - Y SHAPED , THUMB OPERATED CLAMPS , FLEXIBLE LATEX TUBING,TUBE LENGTH 150 CMS
IRRIGATION SET TURP - Y SHAPED , THUMB OPERATED CLAMPS , FLEXIBLE LATEX TUBING,TUBE LENGTH 150 CMS
Consultancy Services for investigation, survey preparation of designs, drawings, estimates for FIC network for Direct minor 52 outlets of main canal, Minor-5 outlets of Distributory no-6 and Direct outlets DOR-43, 46, 47, of main canal and minor 11 ... main canal
Asphalt Road Work.
Removing PCC /Shahabad slabs from the side lining of canal, Providing cohesive non-swelling (CNS) soil lining to canals using soil from borrow area, Earth work excavation for Foundation by mechanical means, Providing and laying insitu vibrated M-15 ... of canal , ...
Improvements to canal from Ch 0.00 km to 1.50 km of Gariguddakaval branch canal coming under Dy No 15 of PLIC,Construction of Sopanum to Gowri kere in Dy No 6 of HRBC,Improvements of Canal from Ch 2.00 km to 3.00 km of Dy No 2 of PLIC ,Improvements ... to canal ,Reconstruction ... branch canal to ...
Removal of Jungle and Silt clearance of Lat no.6 (from 0.00 to 2.51 km) Lat no.8 (from 0.00 to 1.90 km) of BD-5 of Distributary-15.
Repairs Of Distributary Gates No-3,4A,7,10B,12 of ARBC and Repairs to damaged portion of CC Lining from ch 2.10 km to 2.78km of dy 7 of ARBC
Removal of silt and jungle clearance and repairs to dilapidated portions in Distributary No. 29, 29(A), 30,31, 32.33,34,36,41, 41-A,42, 43, 44, 45 and 46 of HRBC.
Removal of silt and jungle clearnce from KM 0.00 to 1.990 of SL-1 of lateral -1 (L/S) of BD-6 of Distributary 18 (KM 20.00 to 40.00)
Protection wall IP Side Banking portion at ch.67th & 68th km of JBC Main canal& & Improvement to IP Side From Ch.64.80 to 65.100 km of JBC Main canal
Improvement of Ayacut Roads in Mugurmolle Village under KRBC Distributary No 38 in Alahalli and Mallali Malla Villages under Minor No 02 of KRBC Distributary No 40 and from Hemmige Kattepura Main Road to the Farmland of Sri Udayshankar in Hemmige Village and from Manjus Farmland to Prashant Farmland in Hulimaavu Village including Jungle Clearance Works in Ayacut Roads under KRBC Distributaries No 38 39 and 40
AME of Canal for the year 2025-26 from Ch KM 0.00 to 10.00 and its Direct DPOs & direct laterals-1 & 3 of Wadavatti Branch canal of Dy-9A of NRBC
Restoration of Service road and pipe culvert in Dy-6 of West Canal under CLIS (Restoration of Gates of west canal Dy-1-15 under CLIS.) for the Year 2025-26.
Raising of plantation at Devarahipparagi Tippu circle to Manur canal roadside-5km, Kondaguli to Tilagul canal roadside-3km, Kondaguli to korawar road P-II 3.20km during 2025-26. (RESERVED FOR OTHERS)
Consultancy services for Preparation of Detailed Project Report(DPR) and estimates including survey, detailed investigation, preparation of designs, drawings for Modernization of Ranikere Feeder Canal network (Canal re section, lining, & Canal ... existing canal structure ...
Special repairs to Manguli Branch Canal for the year 2025-26 comprises of Earthwork excavation, Canal Lining, Providing and filling murrum, supplying and placing TMT steel reinforcement, Providing PCC for levelling course and for all super structure.
Construction of Bridge at Ch 11. 200 of Chikkud Branch canal & Other works
Restoration of bed gradient of main canal and distributries of Alawandi Bettageri LIS
Reconstruction of Pipe culvert at ch 0.90 km in Tamba Canal of NBC
Re-Construction of CTC at Ch 8.200 of Chinchali Main canal & Other works
Removal of silt and weeds in selected reaches from Harohalli High level canal
Construction of draft canal to Veerapura tank of Veerapura village of Bhadravathi taluk
Construction of FICs on Right bank canal of Hubbehunase tank in Hanur taluk
Jungle Clearance & Silt Removing of vulnerable reaches of KLIS FEEDER AND LINK CANAL
Removal of jungle and silt from Hanumnal Canal under D-5 of HBC
Under Narega Canal Work from Medimallasandra village hosamane nagappa house to muniyappa land
Providing Metalling road connecting Yandahalli village coming under the atchkat of D.D.Urs canal.
Improvements and Restoration of Breached portion at Chainage 235.280km of UTP Main canal
Raising of Mansoon Road side Plantation Nagur to Jeevanagi cross canal sideKalaburgi Range
Supplying of Labours for Water Management of Halyal West canal During 2025-26
Tailing of Dy-1 of Teggi-Siddapur canal for the year 2025-26
In situ bioremediation work on biological purification in the Byridevarkoppa canal in hubballi
Dredging of Raja canal from Chowdeshwari temple to Doddakere in ward no 7
Construction of CTC at selected reaches in Hagalawadi DWSS canal of Gubbi Taluk