Loading…
Loading…
9,644 results • Best match
Removal of silt in selected reaches to zone 7 at 29.80 km and zone 8 at 32.00 km of Malebennuru Branch Canal in harihara constituency for the year 2025-26
Block level Survey for the command area of Tellanur Branch canal with RS maps to show the area proposed for the FIC network to mark the field channels on the RS maps which shall correlate on the ground profile The FICs shall be preferably along the boundaries as per the field conditions in the alignments suitable cross drainage and structural works are to be proposed at required the position and designed Preparation of estimates for FICs Collection of documents like RTC etc with detailed drawings and designs comprehensive report L sections of FIC and Preparation of AUTOCAD maps joining map and individual sketches and Superimposing of sketches on the RS Map etc
Removal of silt and jungle clearnce of lateral -1 (L/S) of BD-6 from KM 0.00 to 3.00 of Distributary 18 (KM 20.00 to 40.00)
Construction of Multi Aarch Check Dam at Kallappa Sunagar field at Yamakanmaradi RC Village Hukkeri Taluka Belagavi Dist
Due to letting of water in canal, there will be deposition of silt and debries in the canal which is obstructing the flow of water in the canal. The rain water falling on side slopes, and sum raeches heavy silt is diposited due to maintenance work is ... 2025-26. Canal will ... of canal . ... main canal from ... west canal . ... of canal letting ... in canal for ... of canal but ... main canal from ... west canal . ...
Consultancy service for conducting topographical survey and preparation of DPR for Improvements to Hongalavadi, Muralihalla, Saraguru, Kudluru, Homma, Hosahalli old & new, Alur old & new river canals under Suvarnavathy Reservoir Project.
Removal of silt and Jungle in selected reaches shanuboganahalli branch canal (Left side branch), Sulekote Branch and Chamarayanakote R/S branch canal of Dy 05 of HRBC
Removal of Silt and Jungle clearance in selected reaches of main canal from Ch 74.00 to 77.00 Km of MLI West Canal for the Year 2025-26
AME of Main canal from Ch.0.00 to 10.00 KM & Distributory-1 & Cross regulator gate at Y Junction of Nagathan Branch Canal for the year 2025-26
Removal of Silt and Jungle clearance in selected reaches of main canal from Ch 69.00 to 74.00 Km of MLI West Canal for the Year 2025-26
Removal of Silt and jungle clearence in selected reaches in Main canal from Ch 00.00 to 62.00 Km of Malghan West Canal for the Year 2025-26
AME of canal network for IBC main canal from Ch 15.00 to 17.50 Km and Dy.No. 3 and its laterals of IBC for the year 2025-26.
Improvements of PO Canal at Ch.7.65 Km and 16.55 km of Shimsha Left Bank canal near Adaganahalli and Tubinakere village of Maddur Taluk and Mandya District.
Improvements of Canal, Pipe outlet and Service Road and Connected Roads under Shimsha Right Bank Canal from 0.00 to 11.00 Km of Maddur Taluk and Mandya District.
Earthwork excavation, formation of embankment, repair and improvements to damaged canal lining and structures due to rain flood in direct minor -50A1 coming under UTP main canal
AME of canal for the year 2026-27 of Arakera Branch Canal Distry-No.9 (A) of NRBC from KM 0.00 to 22.87KM.Including its laterls/sub laterals
Ward No.18 Raj Canal Repair Work- Under Tmc devanahalli limits
Protective work to canal in 3rd km of D5 under TBC
Construction of retaining wall at ch 38.50Km of ILC main canal
Repairs of pos at ch 3.4 km in sulekere south canal
IMPROVEMENTS TO DISTRIBUTORY NO.22 & 22A OF HEMAVATHY LEFT BANK CANAL
Repair to Damaged Portion at Ch.42.900km of JBC Main Canal
Restoration of drop at Ch 136.900 Km of Chimmalagi East canal
Raising of Road side Plantation Gate No 17 - Polakpalli Canal Side
Removal of silt in 20th & 24th distry of Hebballa channaiah canal
Restoration at Km No.44,50 and 51 of MRBC Main Canal.
Improvements to km No 44 to 46 of MRBC Main canal
Material Supply to Construction of canal near Vadakekatte of Halebidu village
Removal of silt and weeds in selected reaches of Rajaparameshwari canal
Repair to bonga portion at Ch 6.3 Km of LBHLC canal
Removal of silt and jungle in Ooginahally branch canal of SRDN.
Construction of Bridge at Ch 8 100 of Chikkud Branch Canal
Construction of CC Lining to Maralugaluve (Immavu) branch under Rampura Canal.
Construction of Bridge on GLBC Main Canal At Km No.74
Construction of head regulator at Ch 65km of JBC Main canal.
Removal of Jungle & Silt in Distributory No. 18, 19, 20, 21, 21A, 22, 22A, 23, 24, 25, 26 & its Minor (Vulnarable reaches) under Hamavathy left bank Canal and Removal of Jungle & Silt in Samudravalli Main canal & Dandiganahalli Branch canal (Vulnerable reaches) coming under Kachenahalli LIS.
Removal of Jungle & Silt in Distributory No. 18, 19, 20, 21, 21A, 22, 22A, 23, 24, 25, 26 & its Minor (Vulnarable reaches) under Hamavathy left bank Canal and Removal of Jungle & Silt in Samudravalli Main canal & Dandiganahalli Branch canal (Vulnerable reaches) coming under Kachenahalli LIS.
Providing Man Power for water management of Bagojikoppa main canal from Ch 0.00 to 13.00 KM, Venkatapura Main Canal from Ch 0.00 to 10.00 KM and Koujalagi Branch Canal from Ch 0.00 to 2.00 KM and its Branches, distributaries network for the year 2025-26
Repairs to POs and Removal of Silt in LBC and RBC of Kirugavalu tank, Nenanuru pickup, Volgere pickup, Samshettypura pickup, D G koppalu pickup and CP Koppalu pickup canals under TBC
THE SUPPLY OF MATERIALS FOR THE CONSTRUCTION OF TWO SIDE CANAL FROM HONNEKERE GOWRAMMA HOUSE OF MALLIGENAHALLI GRAMA TO BHOOTANAGUDI CANAL, GULLADAMANE GP, TARIKERE TALUK, CHIKKAMAGALURU DIST UNDER MGNREGS SCHEME
Due to letting of water in canal,there will be deposition of silt and debries in the canal which is obstructing the flow of water in the canal.The rain water falling on side slopes , and sum raeches heavy silt is diposited due to maintenance work is ... 2025-26. Canal will ... of canal . ... main canal from ... west canal . ... of canal letting ... in canal for ... of canal but ... main canal from ... west canal . ...
Repairs and and improvements to road in colony premises and maintainence of office building pertaining to No.4 Harihara branch canal Sub division Harihara for the year 2025-26 (Reserve for ST)
Providing partitions to all branches,electrical repairs,interior works to EE Chamber, repairs of doors,windows, ventilators, repainting and maintainance to bhadra canal No.3 Division office for the year -2025-26
Removal of silt in Selected reaches from ch 0.000 to 10.500km of Santhekere tank high level canal and ch 0.000 to 2.000km of Balegaranakatte canal under Hanagodu Series
Bifurcation of Masaralli tank from Ch 14.500km to 14.800km of Gondi Right Bank Canal and construction of Draft canal to Masarahalli tank of Masarahalli village of Bhadravathi taluk
Repairs to bed and side CC lining of Main Canal in selected reaches in Km-64, 74 and 75 of MLI west canal for the year 2025-26
Improvement to SR & IP from Ch 67.00 to 69.00 Km of SBC main canal (Selected Reaches) and Restoration of Lining at Ch 68.30Km & 68.60Km of SBC Main Canal.
Removing Silt of deep cut section of canal under Karimasuti 1st stage, 2nd Stage and Halyal East Canal Km-20 to 40 & Distributries for the year 2026-27.
Repairs of pos at ch 7.6 km in sulekere North canal near borapura village and ch 2.9 km in matadadoddi village near kyathagatta village under sulekere north canal
Removal of Floating weeds (silt and jungle ) in Kattepura Left Bank canal and Kattepura Right Bank canal and emergent repairs during water manegement in the year 2026-27