Loading…
Loading…
9,644 results • Best match
Annual Maintenance of Irrigation Colony Nargund for the year 2025-26
Irrigation Equipment Sprinkler Pipes (V2) as per IS 14151 (Latest) (Q2)
Improvements to tanks, Canals and Escapes comes under Arishinaguppi, Shydaguppi and Inam Yellapura village of Hangal taluk coming under Dharma project in Hanagal taluk of Haveri District.
Improvements to tanks, Canals and Escapes comes under Akki alur, Kallapura and Yattinahalli village of Hangal taluk coming under Dharma project in Hanagal taluk of Haveri District.
Removal of silt and jungle from Km 0.00 to 30.00 KM of Distributory-2 Canal & Minor-1 To Minor-14 and Its Sub Minors of Dy-2 canal under UTP Main Canal for the year 2025-26
AME of Canal Network of IBC Main canal From Ch.10.00km to 15.00km and IBC Dy no.2B for the year 2025-26
Removal of Jungle from Ch 0.00 to 11.50km of Giribettadakere Link canal coming under the atchkat of D-26 of DD Urs Canal.
Removal of silt in selected reaches of Madhavamanthri main canal and branch canal from chainage 0.00 to 29.00km for the year 2026-27
AME of Canal from Ch. 50.00 to 137.168 Km for tank fillings of East Canal under Chimmalagi LIS for the year 2025-26.
Removal of silt, jungle clearance in selected reaches and repairs to dilapidated portions of canal from ch15.00km to 44.00km of SRD (S) Canal
Restoration of damaged portion of canal & SR Foramtion at 21.20km to 21.40 & 24.50 km to 24.60km of DC-2 Main Canal of TLIS
AME of Canal from Ch. 0.00 to 50.00 KM for Tank Fillings of East Canal under Chimmalagi LIS for the year 2025-26.
Construction of CD at Ch 1.500 Block No.19A distributory Canal of Chikodi Branch canal in Vijaynagar village of Chikodi Taluka Raibag constituency
Repairs and pot filling to selected reaches of HBC from ch 18 km to 21 km pertaining to No 4 Harihara branch canal Sub division Harihara
MODERNISATION OF MARUR BRANCH CANAL & ITS DISTRIBUTARIES UNDER HRBC
Improvements to Nayakanakatte Pickup under KBR (Keragodu Branch Canal)
Raising of Road side Plantation Dastapur - Navadagi Canal side
Modernization of Harohalli Low Level canal in T.Narasipura Taluk
Improvements to Keelagatta Pickup under KBR (Keragodu Branch Canal)
Improvements to D-33 of Kabini Right Bank Canal
Improvements to 13th distry canal at tailend under LBC
Raising of Road side Plantation Chandranagr - Dastapur Canal side
Improvements and restoration of breached portion of canal at ch-0.325km, ch-3.100km, ch-10.800km and ch-18.200km of Dy-6 afftaking at ch-244.450km of UTP main canal (Proposed chainage - 232.00km to 234.00km of utp main canal)
Maintainance and Improvements in main canal from ch 0.00 km to 28.00 km and pickup canal, balaamuri 1 & 2, belagola 1 &2, Lakshmipura main branch, Lakshmipura 1, 2, 3 and 4 branch and naganahalli branch Under RBLL canal
Construction of FIC Network for Direct Minor 52 Outlets of Main Canal, Minor-5 Outlets of Distributory No6, Direct Outlets DOR-43, 46, 47, of Main Canal and Minor 11 of Distributory No 5 Under UTP Main Canal.
Removal of silt and jungle clearance of Distributary-1 from Km 11.00 to 13.50 Km and lateral-13 & 15 of SLI in Selected Reaches.
Removal of silt and jungle clearance of Distributary-1 from 3.00 KM to 7.00 Km and lateral-3,4,5,6 &7 of SLI in Selected Reaches.
Protection wall to escape nala at km 16.12 of distributary-11 of IBC at farmer land Sy No-5 in Kulekumatagi Village taluka Sindagi
Re-construction of Road Bridge, Cross drain at Ch 0.60 km and divider at Ch 6.60 km in 7th Zone under Davangere branch canal in Mayakonda Constituency
Removal of silt and jungle clearance in selected reaches and repairs to dilapidated portions of canal from chainage 0.00km to 15.00km of SRD (S) and its loop Canal from chainage 0.00 to 4.00 Km offtake point at chainage 14.80Km of SRD (S) Canal and ... loop canal from ... (N) canal .
Consultancy services for preparation of DPR, Estimate and DTP for the work of Survey Investigation, Design of Scada and PLC system for pumps to maintain the required discharge in canal network of ILC and scada system for canal network management ... main canal /Dys/Lats/ ... LIFT CANAL (including ... main canal / ...
Improvements to the Canal of Handithavalli, kothavalli branch Canal of Dy- 30 of PLIC. Improvements to the Canal between Chainage 0.00 and 2.500 km of Dy-29 of PLIC. Improvements to Canal of Dy-35 of HRBC. Improvements to Canal and service road of Sub Dy-01 of Dy.No.16 of PLIC. Improvements to road connecting Kelluru village to the Kelluru Gowri Kere Comes under Dy-38 of PLIC
Removal of silt in LBLL Canal From CH 1st Km to 20th Km 1st 2nd 3rd and 4th branches of LBLL 2nd 3rd 4th and 6th mile and L/S and R/S branches of 7th mile Dy of VC and Donnehalla pickup of 9th dy Damadahalla tank PO canal 10th dy Makanakoppalu ... branch canal and ... pickup canal under ... Main canal
Improvements to tanks, Canals and Escapes comes under Araleshwara, Kalve Yallapura, Kanchinegalur, Channapura and Jakkanayakanakoppa village of Hangal taluk coming Dharma project in Hanagal taluk of Haveri District.
CONSTRUCTION OF DRAIN TO ESCAPE FLOOD WATER COMING FROM SANGOLAGI VILLAGE TOWARDS KLI CANAL BY CROSSING THE CANAL AND DIVERTING IT TO KARANAJA BACKWATER
Repairs to bed and side CC lining of Main Canal for Ch 39.900 to 40.00 of MLI west canal for the year 2025-26
Linking the Raja canal near Kuberappa kambali farm compound to the raja canal near mahara Honda in ward no 16 in RNR CMC Limit
Removal of Silt and Jungle clearance at selected reaches from Ch 00.00 Km to 2.00 Km of Kabbur LIS Main Canal and Lateral canal
Removal of silt, jungle clearance in selected reaches and repairs to damaged portion of canal from chainage 15.00km to 44.00km of SRD (S) Canal.
Improvement to service road & repairs to canal lining portion including raincuts of Sonthi Main canal from Ch Km 10.00 to 18.00 in selected reaches.
Removing Silt from intake canal & deep cut section of canal and distributries coming under Ainapur 1st stage, 2nd Stage for the year 2026-27
CONSTRUCTION OF DRAIN TO ESCAPE FLOOD WATER COMING FROM NELWAD VILLAGE TOWARDS KLI CANAL BY CROSSING THE CANAL AND DIVERTING IT TO KARANAJA BACKWATER
Repairs to cavity portion in Ch.11th Kim and 12th Kim SRD(N) canal. Repairs to Inlet in 9th Km of SRD(S) canal
Repairs to bed and side CC lining of Main Canal from Ch 62.00 to 62.300 of MLI west canal for the year 2025-26
Special repairs to inlets, Raincuts and other essential work to damaged portion of canal from Km 0 to 18 km of Nargund Branch Canal.
Removal of Silt and Jungle from Canal bed and SR in selected reaches from Km 0.00 to 4.00 of Atiwal North Canal of KP.
Water management of Taraka left bank canal
Water management of Taraka right bank canal
Annual maintenance of Irrigation colony at Kulageri for the year 2025-26
Annual maintenance of Irrigation colony at Guledagudd for the year 2025-26