Loading…
Loading…
13,599 results • Best match
PROJ.NO,195 KIP CANAL MANNARCODE COLONY ROAD CONCRETING WARD 16 IN NEDUVATHOOR GP 22-23
Kuttapara Parayidukku Parakottu bhagam canal in ward 20 of Vettikkavala GP-P.NO.201/22-23
PROJNO 77/24 MAINTENANCE OF JANATHA JN VAPPALAYIL CANAL ROAD IN WARD 6 CHIRAKKARA GP
PP-Rennovation and modernistion works to Nochukulam field bothie of Thekkumpuram branch canal of RBMC
Annual Plan-2024-25 Valoor GUPS Chekkyad canal road improvrmrnt in Nochad GP-272/25
wadakkanchery municipality CANAL PALAM PATTICHIRA KAVU ROAD RETARRING DIV 27-PRO NO 263/2023-24
Angamaly BP 2020-21 Pothiyakara Thottekad Canal Bund Road side Hand Railing in Kalady GP
Maintenance Dredging in Various Locations of West Coast Canal in NW-3 Using backhoe dredger
CPP MLBC Modernisation of field channel from sluice no 9(LHS)of ayyappankavu branch canal
-Muthalimarthara Thekkethara canal bund Road Side Protection-(Proj No.221/24-25)-General Civil Work
KEEZHMAD GP-PROJECT NO 172-2023-2024-MUTHIRAKKAD PVIP CANAL ROAD CONSTRUCTION IN WARD 10
MIRPA Reconstruction of Kolappuram Branch Karyad Canal of Kolappuram LIS in A R Nagar Panchayath
CSIND- Deepening and Widening of TS Canal between Ch. 21.05 Km to Ch. 22.55 Km.
MOE4-30594/22-Desilting of T P Canal from PVS Hospital to Thevara Div 60,64,65
Design and Build Contract for the Construction of Tank Bund Road Bridge in Chilavanoor Canal
Retarring Works and Drain Works to Canal Base Road in Ward No 21Proj.No 424/22
Mannarkkad Block Pt. 297202021. Nellikkunnu road concrete, KPIP Canal Road Concrete Completion in Kanjirapuzha GP
KGP 2021-22 Kayannabazar Puliyottumukku canal road Ch0/0 to Ch0/195 (proj 47/22)
Annual Plan- Kalloorkad GP.Project. No.60/24 Manalipeedika Vazhiyanchira Canal Road Maintenance Ward 13 (Retender)
CMLRRP ARANMULA LAC VETTIMOOTTILPADI MARUTHIKKAL PADI CANAL PADI ROAD NARANGANAM GP ELANTHOOR BP PATHANAMTHITTA DISTRICT
Annual Plan-Pro No. 37/26 Panankarakkunnu canal road renovation-Kalikavu BP-General Civil Work
SO 288/2025-26-CANAL ST ANTONIES BHAVANAM ROAD CONCRETING SECOND REACH IN WARD 11
project no 218/25-26.PARAPOTTA KURUDANKUNNU CANAL ROAD METALLING AND TARRING WARD 2 (Retender)
-Kannur Corporation - chelora zone div 16 - Proj 111/24-25-Valiyannur LP School canal road-
LAC ADS 2021-22 Shornur Constituency Main Canal - Utharthil Kavu Road Concrete in Vellinezhi GP
MLA-SDF-Kottattu - MVIP Canal road construction - at ward 1 in Manakkad GPGeneral Civil Work
LRRP2024-25 Koothuparamb LAC Sl No.58 Kaarunnya mukk canal road Mokeri GP Kannur District
PyIP _Desilting of UT in main canal near ch 36_300KM for the year 2024_ 2025
Vengola GP 2024-25 Project No-423/25--MAROTTICHODU CANAL BUND ROAD NAVEEKARANAM WARD 20-
Rehabilitation Works for Kondayur Cheerakuzhi Canal Bridge, Muttippalam Bridge, Akamala Bridge under Thrissur Bridges Section-
S-188/27-West to east end maintenance of Rameswaram canal road in div 67
GENERAL-CPP-NP-2026-27-MLBC Jungle clearance uprooting Vilayanchatahnur branch canal 4000 to 9500
CPP-TMS-ACTION PLAN-(2026- 2027)-Annual Maintanance of Pothady branch canal and its distributories
GENERAL-3654525-2026 MOUTH CLEANING AND DESILTING OF RAMESWARAM CANAL IN DIVISION 2 AND 3
2025-26 M V canal bund branch road maintenance Third phase ward 1 - Koratty GP
Malampuzha Dam is the second largest dam and reservoirs in Kerala,located near Palakkad, built post independence by the then Madras state. Situated in the scenic hills of the Western Ghats in the background it is a combination of a masonry dam
Malampuzha Damis the second largest dam and reservoirs in Kerala,located near Palakkad,built post independence by the then Madras state. Situated in the scenic hills of the Western Ghats in the background
SDRF- Deepening of mouth of RMP canal from Ch.0m to110m in ElamkunnappuzhaGramaPanchayath.Phase I
Improvements to Chiyyaram Branch canal from Ch 0/100 to Ch.1/000 km
Rectification to Manaleri Branch canal between Ch.0.000 km and 0.100km General Civil Work
SO153/23 CANAL BUND ROAD RETARING IRINGAMPULLY SAJEEVAN HOUSE TO VENU CHANDANAPARAMBIL PLOT VARE
134/26(SO323/25) Vellakollil Padi Water Tank Kannimala Canal Junction Road ConcreteWARD8(retender)
Annual Plan-2023-24 PZR BP SIDE PROTECTION FOR KOOLITHODU AND MAINTANANCE WORK FOR CHECK DAM AT PANJAL GP-PR.NO154/2024-General Civil Work
Kasargod Development Package-Check dam cum Bridge at Chirankadavu-Construction of a vented weir cum bridge at Chirankadavu in Panathady Panchayath-General Civil Work
ROAD RE TARING WORKS
Civil Works
ROAD WORK
Rectification
Urgent Rectification works of Kizhakkambalam Branch Canal due to side slip.
Annual Maintenance to RBC main canal from ch 13500m to 20230m