Loading…
Loading…
13,599 results • Best match
Clearing jungle for canal Bund, clearing grass for canal bed, Removal of unserviceable earth from canal, earth work for side wall foundation,demolishing existing damaged lining work and rubble work,providing wearing coat etc
Rectification works in Paravoor Branch canal near Haritha Nagar
DEPOSIT KIP LB Edakkidom Gurunadhanmukal Canal Bund Road concreting work in Kareepra Grama Panchayath General Civil Work
PyIP_Rectification work to damaged Aqueduct at keecheri in main canal near ch 05_080km for the year 2022_23
GENERALCPPNP202526MRBCAnnual maintenance of leading canal from Chamaneri to ISDfarm heckdam of Kozhinjampara panchayathand Angarathcanalfortheyear 202526General Civil Work
Annual Plan-PKD -BP2022-23 Kundoor Canal thodu side protection Ward 12-Chengamanad GP -General Civil Work1
the pipe was cloded with cc lining. On duration, the lining was damaged and canal water flow into the pipe and around the pipe which forms a piping hole in the canal
GENERAL ThenmalaMS2 Action Plan Works KIP RBMC Various canal shutters Replacement of the offtake shutter 1Nos of Pavumba distributory and cross shutter 1Nos at Ch2000m of Karunagappally Branch Canal General Mechanical Work
The earth embankment at the beginning of the Kakinikad canal collapsed and was washed away due to the water that flowed in a manner similar to a landslide. The wall of the surplus escape of the canal has also been broken and trees have fallen.
M C road Panikkarambalam Low-level Canal bund road re tarring ward 10
MVIP-Ramamangalam Brach canal-Providing cover slab over the Flume near ch.1790m and kilometer stone
GENERAL-CPP-MLIS-Urgent rectification works to Main canal between Ch. 3/350km and 3/460km
SDRF - Natural calamity 2018 - Urgent rectifcation works to Kozhukully Branch canal ch- 0.000 to 0.150 Km
Patchwork of KIP canal shutters Patchwork, painting overhauling of various canal shutters SBC offtake at ch 44015m of RBMC, Pannivizha cross shutter at ch49115m of RBMC and overhauling of hoisting mechanism of 14th mile cross shutter
Urgent rectification works to Themparamadakku main canal between Ch 3/500km and 4/000km
Clearing the Canal by removing all accumulated Silt/Vegetations etc. for smooth water flow.
280/23
Re tender SDRF-CPP-MRBC-Rectification toKozhinjampara branch canal between Ch12/380km to 12/480Km
RetenderAnnual Plan264 26 Vadavucodu puthencruz GP Chenganattu Kavala Peechingachira Canal Bund Road Retarring Ward 11
392/2024-25 Choorathodu vengoor canal bund road retarring balance portion ward 9-Vengoor GP
PROJECT NO-280/24-PALLICKAL G.P- MALAMEKKARA KADUVUNKAL PADI CANAL ROAD RETARRING IN WARD-11
PR.NO168/22-23 TS CANAL-CHAVARA BRIDGE ROAD RENOVATION SECOND REACH WARD 23 CHAVARA GP
MLA-SDF-2023-24 - Side Protection of Kuttikkattel Colony - Kollamarukudiyil Canal Bund Road, Ward 5, Thirumarady GP-Pampakkuda BP-General Civil Work
Annual Plan-PNO 133-Cherukavu-Olikallu PIP Canal Road side Protective Barrier Construction in Ward V VGP 2024-25-General Civil Work
Fixing boundaries for the land under PVIP for Aluva branch canal
Annual maintenance of Valakam Branch Canal from ch 4000m to 8000m
Extension of drainage canal and allied works at Kinavoor karinthalam Padasekharam
Annual maintenance of Venmony branch canal from ch 0m to 5870m
Annual maintenance of Kulanada branch canal from ch 0m to 8470m
Annual maintenance of Puliyoor branch canal from Ch 0m to 8201m
Annual maintenance of LB Main Canal from Ch 19000m to 22000m
Annual Maintenance to Kuttur Branch canal from ch 0m to 8000m
Annual maintenance of LB Main Canal from Ch 22000m to 25022m
Annual maintenance of Pandanad branch Canal from Ch 0m to 13070m
GENERAL 2025 26 CPP KKPS Electrical Rehabilitation of Kunnamkattupathi Regulator under irrigation Division Chittur Palakkad Electrification General Electrical Work
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hitachi. The estimate has been prepared based on DSOR 2021 with cost index of 144.45. The amount of estimate comes to 970000
Annual maintenance 2022 23 Chowara TB 1 2 3 4 Annual Maintenance of Chowara Thekkumbhagam Chowara No I II III amp IV LIS under M I Section Aluva for 2022 23 including cleaning of suction pit and canals
GENERAL Action Plan 2023 24 KIP LB Annual Maintenance Estimate for removal of floating materials from canals under the jurisdiction of section 29 19 Kottiyam in connection with water distribution during the year 2023 24 General Civil Work
CMLRRP 201920 Sl No 668Puthur Grama Panchayath ward 7 MURIKKUMPARA VENGOLLAMUKKU CANAL BUND ROAD CONCRETING Ollukkara BP Ollur LAC
SDRF -Urgent restoration works for main canal of Karalmanna LIS from Ch 1925 2175 m Cherpulassery Municipality 2nd Phase
The work is for engaging man mazdoors for canal watching during water distribution of RBC and its branches and other allied works along the canal.
Annual Maintenance -Nadakkuthazha - Chorode canal at Kommanerithazha VCB cum Bridge
Formation of canal bund road including side protection works
GENERAL-Obstruction Removal-Removal of obstruction like thick growth of water hyacinth water weeds etc in Shanmugham canal in Poomangalam and Padiyur Panchayath for the year 2025-General Civil Work
rectification to Komarappadam branch canal
GENERAL WP NP Annual maintenance- 2025 26 Clearing and removing grass jungle and silt for Main canal between ch0 000km to 0 5600km and No 1 distributory canal between ch0 000km to tail end
Felling trees, cutting branches of tree, engaging labour for removing slipped earth in canal and chiras and Hire charges of Hitachi, other hydraulic machineries for removing fallen trees
GENERAL CANAL CLEANING WORKS 2022 23 MP LBC Annual maintenance of Kurissi Pambadi branch canal 2 nd crop 2022 23 and first crop 2023 24 from ch 0 00 km to 22 500 km General Civil work
A n n u a l P l a n - 2 0 2 4 - 2 5 N i l a m b u r B P Proj.No.259/25 Thamburattikkallu Chembali canal ll nd reach-canal construction
Annual Plan-OTPMC 2025-26 CONSTRUCTION OF CANAL BRIDGE IN CHOLAKKUND PULIKKAPARAMBU SC NAGAR IN WARD-01. (PRO NO-64/26)-CONSTRUCTION OF CANAL BRIDGE IN CHOLAKKUND PULIKKAPARAMBU SC NAGAR IN WARD-01 PRO NO-64/26