Loading…
Loading…
13,599 results • Best match
CPP MLBC AM 2022 2023 Engaging man mazdoor labour for removing weeds waste debrises and flow disturbing materials etc andamp saplings and grass in the canal bund during water distribution for Arampadam canal its branchs and distributories
Annual maintenance of canal
Annual Plan-kuzhur GP 2023-2024 Construction of Drain at Manakkapadi Canal Stop Indiraji Shelter Road ward 7 - General Civil Work
Construction of Community hall, House maintenance(3 Nos), Retaining structure, Compound wall, New road construction, Check dam, Bore well, Water distribution, Plumbing work, Electrical Work
Urgent protection work to the eroded right bank of Chalakudy river near Water Authority pump house at upstream of Koodapuzha check dam in Chalakudy municipality
Jal Jeevan Mission (JJM)CONSTRUCTION OF THADAYANA AT KURIYARKUTTI PARAMBIKULAM-Construction work of Check Dam, providing laying pipeline, tank at Kuriyarkutti - Parambikulam-General Civil Work
KIIFB Project-TRAN 10-WRD025-06 - WSS to Ayyappankovil Panchayat - PART-II , Package III-Design and construction of check dam across Periyar river at Thonithady
Deepening and widening of thodu- 175m Retaining wall 1.5 m ht- 347m Cross check Type A- 2nos Cross check dam Type B- 4nos Passage slab
SDRF Protection of the right bank of Kannadipuzha for a length of 45m at the DS Mambram Check dam in Kannadi Panchayat in Palakkad District
Repair of Theendappadi Footbridge across TanurKoottayi canal in Vettom Grama panchayath Malappuram District
Rectification to the damaged canal side lining between Ch.1950m to Ch.2100m
Re-Tender Pathanapuram BP(SO43/25) Canal kuranthamon road concreting in punnala division
ANNUAL PLAN VELIYANCODE GP PRO. NO108 .PALLIMUKKU CANOLI CANAL CONNECTION ROAD DRAINAGE CONSTRUCTION
Providing ring bund Bailing out of leak water from canal Providing and filling the breached portion with sandbags. Providing an RCC slab at the bed of the canal
Rectification of the well at Mankara Branch canal
GENERALCPPNP202526MRBCEngaging Labours for removing waste debrisfloating materials etc from RB Main canal fromCh10/100 to15957kmKozhinjampara branchParumanchallabranch,AngarathcanalandValiyavallampathy
Urgent rectification works to the bund road of Kalchady branch canal
Annual Maintenance to Mangalam branch canal from ch 0m to 3015m
Clearing the canal by removing all accumulated silt/Vegetations etc.. for smooth water flow.
Rectification work-Urgent rectification works to Malayattoor No.1 LIS main canal of Neeleeswaram
KANACHERY KUBAIBPALLY CANAL ROAD KAANACHERY KAAVU KAANACHERIPALLY LINK ROAD NEW TARRINGCH0/225-0/390)
GENERAL KIP RB General Action Plan 2025 26 Annual Maintenance Jungle Clearance and Removing floating body for the smooth flow of water during water distribution 2025 in Pallickal Anayadi Thottuva Distributary General Civil Work
EYE2/12392/22-Desilting of Perandoor Canal (PVS to Chittoor Puzha) in Div 33,34,70,71,72, Edappally Zonal
Vazhakkad GP Annual Plan 2021-2022 pro.239 Aavunjikkad parambil canal road concrete in w 10
PyIP_Rectification of flume in Edakkad Branch Canal near Ch_ 1_050km at Thazhekkavinmoola for the year 2023_24
GENERAL-PVIP Breach-Urgent Rectification works to Valakam Branch canal at Ch.14900m-General Civil Work
General LAC ADS CPP MLBC Construction of Mele Ezhuthani club canal bund road General Civil Work
Annual plan -2024-25 ADUKKATH SCHOOL KILAYIL CANAL ROAD- RETARRING P.NO. 283/25-General Civil Work
Retender SDRF Repair works to VCB and Canal at Kannamoochichira across Kizhakkan thodu in Moonniyur Panchayath
Annual plan 2023-24 thekkumkara canal bund road retaring Thekkumkara GP(project no . 127/23-24)
CMLRRP 2020 -21 Phase II (Revision 35) - Kallepully Padalikkad canal bund road in Marutharoad Grama Panchayath
Pattukadu canal bund road retarring and side protection- in Ayiloor GP Proj no.264/24-25
PyIP_Rectification and reformation of Main Canal between ch17_745km and ch17_810km _ Providing lining for the year 2021_22
PyIP _Desilting the Cut _ Cover in Main Canal near Ch_19_000km at Kallayi for the year 2021_22
Kalady gp p no 204 Marottichodu sree sankara college canal bund road maintenance in Ward 1
Annual Maintenance of Nadathara, Kalathode and Chiyyaram Branch Canal of OBC for the Year 2020-21
Malappuram DP Annual Plan (2021-22), Project No 1523-22 Improvements for Mekkorava canal at Vazhikkadavu
Drain Construction At Urukunnu Canal Paalam Road-Project no-79/2023-24, in Thenmala GP(RETENDER)
Annamanada GP 2025-26 Poovathussery LI Canal Road Renovation- Completion ward 13-Project no 110/26
PKDV 2019 20 ELAVOOR CANAL LINK MATTATHIL ROAD PUNARUDHARANAM IN WARD 15 OF PARAKKADAVU GP p112
NIP Restoration of Chowara branch channel in between Ch.16000m to 21000m including canal bund protection
MOOKKANNOOR GP 2020-21 POOTHAMKUTTY AMBALAM CANAL BUND ROAD SIDE PROTECTION WORKS IN WARD NO2(65)
Annual Plan-PYM GP-2024-25 KUTTIKKADU CANAL BUND ROAD RENOVATION WARD 5-PRO.NO.46/25
2023-24 Pro No 88 Puthukav Canal bund road Maintanance Ward.15 in Kodakara Grama Panchayath
Thenkurissi GP 2024-2025 ( Pro.No 34/25)-Pokkath Canal Road in Ward 3-General Civil Work
Urgent protection works and closing leakage of Vadakara branch canal at Ch 150m 200m 250m 1000m
2019 20 Project No 44 Puthur Grama Panchayat Ward 5 Mannamangalam Canal bund Dharbha Road Tarring
Vengola GP 2022-23 Project No-176/23 Orna Canal bund Road Re-Tarring Ward 6
Annual Plan-2022-23 Meloor GP - Adichily Palattikund Canal Bund Road Maintenance Ward 8-Pro.No.128
MNGP 68/2021-22 YCA CANAL BUND ROAD RETARRING IN WARD 17 OF MALAYATTOOR-NEELEESWARAM GP