Loading…
Loading…
13,616 results • Best match
GENERAL-CPP-Nurnee System-Maintenance to shutters at Nurnee weir, branch canal shutters and amp cross shutters at Ch.3/600 km and river surplus shutter and surplus shutters of Nurnee main canal near Ch.0/900 km and ch.6/400 km
GENERAL-Action plan 2024-2025-PVIP Removal of Blockage from LLC from Ch 15 300 km to 21 200km, Kodanadu west Branch canal and its MDs and FCs , Perumbavoor branch canal and its MDs and FCs Punnayam MD,Vattakattupady MD, Rayamangalam MD
MP-LADS-2022-23 CONCRETING OF MAVUDY SCHOOLPADY CANAL ROAD -WARD 10 PALLARIMANGALAM GP-General Civil Work PARAMBANCHERY-WARD 01 OF POTHANICADGP
CPP-MLBC-Annual maintanence for the year 23 24 Engaging man mazdoor labour for removing weeds, waste, debries and flow disturbing materials etc. and saplings and grass in the canal bund from Ch 0/000km to 12/600km of main canal and branches distb
GENERAL WP Annual maintenance for 2024 2025 Clearing and removing grass jungle and silt for Chalai RBC Canal between ch 0 00km to 06 000 km and Chalai LBC Canal in between ch 0 00 km to 02 500 km tail end General Civil Work
GENERAL WP CSP NP Annual maintenance for 2026 2027 Clearing and Removing grass jungle and silt for No3 Distributory canal between ch04 724 km to 12 036 km tail end and Kallepully branch canal in between ch0 00 km to 1 950 km 1130 2026
GENERAL WP CSP NP Annual maintenance for 2026 2027 Clearing and Removing grass jungle and silt for Pudussery main canal in between ch0 00km to 06 400 km Ramassery branch canal in between ch0 00 km to 0 800 km and Pudussery minor Kurudikkad
GENERAL WP CSP NP Annual maintenance for 2026 27 Clearing and removing grass jungle and silt for Chalai RBC Canal between ch0 00km to 06 000 km and Chalai LBC Canal in between ch0 00 km to 02 500 km tail end 1132 2026
GENERAL-NIP-Extension of inlet and outlet of cut and cover near ch.7200m of Vizhinjam Branch canal at kalliyoor Grama Panchayath- General Civil Work
CPP-TMS-ACTION PLAN-2024- 2 5 - A n n u a l m a i n t e n a n c e o f T M S - Chandanapuram branch canal between Ch.
PSM 2022-23-Monsoon Preparedness - RBMC and branch canals - Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition under Thanippadam Section
PyIP Clearing light jungles and and Removal of floating bodies putting temporary cross bunds lubricating and controlling shutters etc from main canal ch 16 000km to ch 42 500km branch canals distributories and field boothies
Construction of new culvert in perambra branch canal including necessary rectification works
During the water distribution period, a huge quantity of water overflows through the sides of the canal between chainages from 30m to 150m. The water flows nearby houses, toilets, and wells, affecting proper distribution through the canal.
MZVR 127/23 High Level Canal Bund Cherakunnathuthazhathu Road in Ward No.XVI of Mazhuvannoor Grama Panchayath under Annual Plan 2022-23
GENERAL PIP LBC Annual maintenance of LB Main Canal from Ch 16140m to 20000m for the year 2024 25General Civil Work
Annual Plan-Vattavada GP 2024-25 Construction of Canal and protection wall at Vadiyangadu ward-2-13/25 General Civil Work
Annual Plan-Piravanthoor GP project No 49/2023-24,-Kannankara canal road side protection and culvert ward 19 -General Civil Work
Urgent rectification work for closing breach at UT near Ch 2/600km of Kodanad East branch canal
SDRF-urgent restoration works for main canal of Karalmanna LIS from Ch 2175 to 3025 m cherpulassery Municipality-3rd Phase
PARALI GP 2024-25 NARIKODE CANAL PAALAM MUTHAL CHANDRANTE VEET VARE CONCRETE IN WARD NO 08 PROJECT NO 44/25
Annual Plan-Kadirur GP, Pro no 136/2025-26-6TH MILE CANAL ROAD TARRING in ward no4-General Civil Work
Annual Plan-KVPDY BLOCK 38/2025-2026 Construction of protective fencing in Periyarvali canal near Anganawadi Rayamangalam GP ward 11
SDRF-CPP-MLBC- Urgent-rectification work to flood damages in field channel right side of Arampaadm canal Ch.1/000km
Protection works to the canal and drain from Ch. 3050 m to 3250 m of Madakkathanam minor distributory
Desilting Division 12 (old 63)-Desilting of Thodu Pulleyppady to TP Canal near CBI Road Father Manual road
Pramadom GPPro no 16024-25 St Marys English Medium school Chappathupady Canal road concrete in ward no 18 Retender
P. No. 169/20 Adichily Ezhattumugham pwd road canal bund link road in ward No.7 of Karukutty GP
Reconstruction -Deposit work- L.B canal of kothupara LIS at Alumkandi Kallivalappil in Keezhuparamba Panchayath, Malappuram Dt.-General Civil Work
SDRF 2018 19 Urgent rectification works of Kudilpeedika branch canal from Ch400 to 600 of Kuttipuzha No1 L IScheme
GENERAL-PVIP -Annual maintenance of valakam branch canal from ch12000 m to 16250 m for the year 2024-25-
Clearing and Desilting
Desilting
RE E TENDER Pandalam Thekkekara Grama Panchayat- Annualplan Project No.256/18-19 Construction of Foot bridge across K,I,P Canal at Mallika
Construction of new LI scheme from Periyar river to Thekkumbhagam branch canal of Thiruvilamchuhi LIS
Rectification works to Puthur diversion canal in between Ch. 3/700 to 4/000 km
Clearing Jungle and desilting of Maniyurbranch canal between ch 6/000 km and ch10/690km
Improving irrigation facilities of Kallarathottam ela by renovating checkdams of Choondikkal kodinjamoola thodu in Ponnambi ward at Vellarada Panchayath
removing silt grass jungles using Man Mazdoor and Hydraulic excavator for the free flow of water during the distribution of the second crop 2022 and the first crop 2023 under Erimayoor Canal Section
This work is proposed to remove the accumulated silt and debris at the earliest so as to ensure sufficient flow in Kakkudukka Thodu near check dam portion before upcoming monsoon
Annual Maintenance and water distribution 2023-24-MVIP- Annual maintenance of palakkuzha Distributary (Before lift)from Ch.0 to 1870m and (Afterlift) from Ch.0 to 2300m ,cleaning of sump well and supplying of excavator for MVIP Subdivision 9
Rectification and Maintenance of Ayanchery dty canal between ch 1/500 km to 3/000 km
UrgentWorks for Jungle Clearance and silt removal of Thuneri Branch Canal from Ch 0/000km toTailend
Clearing and Desilting of KBC Canal from ch 29/100 to 31/750 in Kakkodi GP
GENERAL-KIP(LB)-Fabrication , erection and painting of shutter at Kottiyam Branch Cross regulator Ch 6485M of Kottiyam Branch Canal-General Mechanical Work
Gap filling works - Construction of canal under Kodumbu krishi bhavan - General Civil Work
LAC ADS Koottikkada Distributory Construction of canal road between ch 1580 m to 1800m Konnel mukku Kandolil Road in Mayyanad Grama Panchayath in the Eravipuram LAC
Annual maintenance and removing floating materials of canal
Desilting in the upstream side of various irrigation structures in Madhuvahini river in Kasaragod District- Desilting in upstream and Downstream of Patla VCB.
Construction of VCB and drain from Kacherikadavu to Pandamkulam and improvements to irrigation facilities in Poonattu Padashekaram in Thekkumbhagom Panchayath in Chavara Constituency