Loading…
Loading…
13,620 results • Best match
GENERAL CPP MLBC Urgent rectification works to Olassery branch canal between Ch. 4/650 km to 4/720 km
SDRF De silting of NC Canal Ch 6760m to 8000m Reach 4 in Vatakara Municipaity Chorode and Eramala Panchayat.
SO-36/20 - Vengoli road 2nd street canal valiyakavu road valiyapara valiyakavu road santhipuram 1st street in ward 15
GENERAL Urgent maintenance woks in Champakkulam canal jetty Bidge Approach Road Rectification of settlement in approach road General Civil
Annual Plan-2024-2025-Koovappady Block- Construction of Thrivani Njavarippadam Canal Bund road in ward-14 of Koovappady GP
Pr No.142 Nilackal colony canal junction road reconcreting reach 2 of Kunnathoor GP under Annual plan 2024-25
Thrissur corporation Koorkkenchery zonal Division 32 ollur-KLDC canal to madhavapuram kolpadavu chal cleaning PRO NO194/2025-26-CHAL
CSM-2019-20-Urgent rectification and maintenance works for protection of canal bund of LBMC near ch.37-300km
RKVY-Providing RCC lining to the Western side of North South main water canal (remaining portion) at RRS, Vyttila.
Annual Plan-VELLINEZHI GP., 2025-26, PRO.NO.75- Thiruvazhiyodu canal lakshamveedu road re concreting , WARD -8-General Civil Work
77/25-26 Renovation of Mudakuzha West MD canal bund road in ward 8 of Mudakuzha GP-retarring works
46248 LAC-ADS-2022-23 PUDUKKAD LA, KODAKARA GP-CONSTRUCTION OF BRIDGE ACROSS KANAKAMALA CANAL BUND ROAD WARD 7
CSIND-Reconstruction of St. Andrews Bridge and Approach Road across TS canal at Ch. 24.30 Km in Kadinamkulam panchayath
Annual Plan-2024-25 Nilambur BP Proj. No 13/24-25-MANIMOOLI PADASHEKARA CANAL VAZHIKKADADU GP-General Civil Work
GENERAL-WPC 40877 of 2022-Filling up of unutilized Kuriathod Mini-kadakkanad branch canal tail end -General Civil Work
SC CORPUS FUND 2019 20 MOOLAMKUZHY CANAL ROAD RETAINING WALL AND CONCRETING IN VETTIKAVALA GP UNDER VETTIKAVALA BLOCK PANCHAYATH
Cheramangalam Scheme 2021 22 Improvement and urgent rectification work to Erakulam branch canal chainage 1 950 to 20 50
GENERAL KDLR Monsoon Preparedeness2026 Removing debris and desilting of Edathiruthy LI Scheme canal in Edathiruthy Panchayath General Civil Work
GENERAL-WPC 40877 of 2022-Filling up of unutilized Kuriathod Mini-kadakkanad branch canal tail end -General Civil Work
GENERAL Non Plan works 2022 2023 CPP MRBC Annual Maintenance of Kuttipallam Branch canal including distributaries General Civil Work
Construction of culvert at ch 461 310km on right bank of Vatakara Mahe canal near Ottakkandy thazhe foot bridge
Annual Plan- THEKKUMKARA GP 2025-26, PRO.NO 287/25-26, KALLAMPARA PUNNAMPARAMBU CANAL ROAD MAINTENANCE-RETARRING-General Civil Work
Annual Plan AYANCHERI GP 2025 26 PRO NO 83 25 26 THATHAMKOTT PALLI CANAL ROAD WARD 13General Civil Work
MPLADS2025-26 CONSTRUCTION OF PROTECTION WALL FOR CHINNAVARA CHANNELMEDU CANAL ROAD IN WARD 12THOF MARAYOOR GP IN DEVIKULAM BP
Annual Plan-Karukutty GP Pro No361-26-Assisi nagar amathara maneeshanagar right canal bund road maintenance -ward1-GeneralCivil Work
SR WORK 2019-20 Construction of CC R/Wall near canal in perumbi konoor road at ch 0/500
GENERAL KPIP Urgent Rectification works Canal Bund protection work near to CH 58/900km of LBMC General Civil Work
MLA-SDF-2025-26-Chelakkara Constituency-Construction of bridge at Cheerakuzhy Canal-Karuvampadiroad in Desamangalam Panchayath-General Civil Work
Annual Plan-P.NO-63/2023-24 -MNAKKODE SMHSS CANAL BHAGAM ROAD CONCRETING IN WARD NO-1 OF POOYAPPALLY GP
ACTION PLAN _NON PLAN 2025_2026_PyIP_Urgent repair work of under tunnel in main canal ch. 34_100km at Kadoor_General Civil Work
314/22-23-Annual plan 22-23 -Mylom GP- 314/ Gurumandiram canal bhagom mannara ela road concreting and maintenance
RYM 2023-24, Ward 19, Re tatting of Muslim pally- Vattackattupady road and Ration kada kavala -canal bund road-
VBP 153/23-24 Construction of Crash barrier for PVIP Canal sides in various wards of Vadavucode Puthencruz GP
Kasargod Development Package Integrated Water Management Renovation of Shiriya Anicut and Canal in Puthige GP Part 1General Civil Work
Annual Plan-2025-26 Poruvazhy GP Proj No. 118/25-26-Maintenance of Njarakkad Canal road at ward 14
GENERAL KIP LB Culvert Construction of a culvert across Kulakkada branch Canal at chainage 16200 m General Civil Work
Annual Plan-EDAVETTY GP 2026-27 AMBALAM CANAL ROAD MAINTENANCE - WARD 1-PROJECT NO 156/27 General Civil Work
Annual Plan-Edavetty GP 2026-27- Canal bund nadappatha maintenance ward-12-Proj. No-29/27-General Civil Work
Annual Plan-Edavetty GP 2026-27 Edavetty Madrasa canal road maintenance ward-14 Proj.No-42/27-General Civil Work
General KIP RB Urgent rectification of Enadimangalam distributory Canal between the ch 2500m and ch 4000m General Civil Work
Emergency Monsoon Preparedness
Topographic survey, Boundary stone, Boring bore holes, Mobilization , Boring rotary power, Erecting plat form , Hire charges for second class boat, Boring hard rock, Core boxes
Construction of VCB across Peruvamba river at Peruvamba and side protection
The scope of work under this estimate includes Earthwork, Scarifying the existing surface ,Pot hole filling, WMM layer,Chipping carpet,Seal coat,road CC and irish
Desiltation work
Annual Plan-Vengad GP 104/2023-24-Vengad Mainroad Junction Canal Road Maintenance CH.0/000 TO CH.0/172KM-General Civil Work
PyIP Rectification and reformation of main canal near ch 29 000km Balance portion of the proposed SDRF work for the year 2019 2020
Construction of Single Sluice (1 no)
SDRF-CPP-MRBC-Rectification and Renovation of traditional anas and canal system of Korayar river in Kozhinjampara panchayath-Kalyanakrishnayyer system originating from Kakkarapathy checkdam from second road cross to Karuvapara road
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Plastering etc