Loading…
Loading…
13,620 results • Best match
Annual Plan CHMD GP 23 24 Cleaning of Thodus Drains Irrigation Ponds amp Kadavu in Various Wards Reach 2 Project No 121 General Civil Work
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Sreebhoothapuram No1,Sreebhoothapuram No 2 LIS under Electrical irrigation section Kalady-Electrical -General Electrical Work
GENERAL-Tree cutting-Urgent cutting of trees in Irrigation thodu inbetween Sasthamangalam Pipinmoodu to Killi river in Kowdiar ward of Vattiyoorkavu LAC-General Civil Work
GENERAL Kurunthar Thodu Improvement of irrigation Facilities to Kurunthar Thekkemuri Padasekharam and Restoration of Kurunthar Thodu in Mallappuzhassery Panchayath of Aranmula Constituency General Civil Work
Urgent Works for Jungle Clearance and silt removal of Right Bank Main Canal from Ch20/000km to27/000km
Urgent rectification works
Urgent rectification works
road maintenance
RIDF XXVI Infrastructural development works in various padasekharams under Alatur constituency in Palakkad district- Construction of canal for kakkayur ponnumangalam padasekharams under Koduvayur, Palakkad District
KyIP ACP (NP) 2024-25-Clearingand desilting of Maniyur branch canal between ch 6/000 km and ch 10/690km
Reconstruction of Inspection Road (left Side Bund) of Mulavoor branch canal in between ch 0/300 to 5/500 km
KyIP ACP (NP) 2024-25-Clearingand desilting of Maniyur branch canal between ch 0/000 km and ch 3/000km
MI Class II Works-Repairs and Renovation of MI Structures for the year 2017-2018-Construction of Check dam across Varattayar river at Chembanthodu (Nanjamal System) in Eruthenpathy Grama Panchayat in Palakkad District.
GENERAL-PVIP- Construction of left canal bund footpath from Ch 3 100 km to 3 207 km of Kurichilakod MD-General Civil Work
Improvement of Thodu
silt removal , DR masonry total length 202m ,Providing FRP Shutters and locking arrangements
Construction of Protection wall
provision for clearing grass twice on both canal side before mundakan crop distribution summer water distribution Silt removal from unlined bottom and concreted bed bottom with suitable thickness proposed to necessary lengths of canal
CPP-TMS-AP-2024- 25-Rectification works to the damaged and unlined portion of Pothady branch canal between Ch 4/050 Km to Ch 4/150 Km
PyIP_Rejuvenation of Main Canal between ch2_000km and ch3_400km _Desilting inside the Tunnel between ch2_050 km and ch3_350 km for the year 2021_2022
SDRF Urgent repairs to the Main canal of LI Scheme Kattuppara from ch1 900m to 2 050m in Pulamanthole Panchayath Malappuram District.
MZVR 16/24 Rubber park mavinchuvadu High leval Canal bund Road ward XIX in Mazhuvannoor Grama Panchayath under Annual Plan 2023-24
GENERAL TS Canal Development ch. 27.45 to 43.78 Reconstruction of boat jetty at Kadinamkulam Kayal behind Kadinamkulam Police Station General Civil Work
Annual Plan- Viswajyothi Back Side Canal Road Vengoor East Thuruth Road Re Tarring In Ward 10 of Ankamaly MP-AMP100/23-24
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance works to the tail end field channel of kavassery branch canal
Retender Annual Plan NDY 2024 25 Avanamkode Canal Bund Road Balance portion Renovation Ward 11 Project No 73 25 General Civil Work
SDRF LBC Sub Division Malampuzha Project, Palakkad - Urgent rectification and maintenance works to the tail end of Perinkunnam No 1 branch canal
GENERAL-MLA-ADS-2023-24 Chittur LA Constituency-Reconstruction of Panchayath ana canal in Nalleppilly G.P in Palakkad district.-General Civil Work
MLA SDF KIP LB Concreting of canal bund road at Kundarakonam Chirakkara temple ward No 8 in Chirakkara GP General Civil Work
GENERAL-Rectification of collapsed shiriya canal-between chainage 5/400 to 5/500 in Puthige G.P of Manjeshwaram L.A-General Civil Work
40890 LAC-ADS-MLA-2023-24-Chelakkara LAC- Tarring of Thozhuppadam Mayannur Canal road Pazhayannur BP-In Pazhayannur BP - General Civil Wor
GENERAL-CPP-TMS-CADA-2025-26- Modernization of Field Channel From Sluice No.26 RHS of Nallepilly Branch Canal.- General Civil Work
Mangalam project CS VDYClearing jungle and removing silt in between Ch05 400 to Ch17 600 Km of LB Main Canal including Distributaries
PTZ-S0308/24 Chathanangattupady-Peechingachira Canal Bund Road Side Protection in Ward 11 of Vadavucode-Puthencruz Gramapanchayat.- under Annual Plan 2023-24
E4-1262/21-Construction of Protection wall at Puthuvamoola-Kudilimukk Periyarvalley canal bund road Reach-2 in ward 38 of Thrikkakara Municipality
GENERAL-MP-Annual Maintenance-2024- 2025-LB main canal between the Ch 0/300 to Ch 20/000 Km -General Civil Work
GENERAL CPP MLBC Rectification works to mangode branch canal between ch 1 350 km to ch 1 800 km General Civil Work
GENERAL KIP RB Annual Maintenance Removal of silt from canal bed clearing grass and light jungle from Pallickal distributory General Civil Work
PSM 2022-23-Peechi Scheme Maintenance- 2022-23 - Improvement works to Vazhakkumpara Branch Canal in between Ch. 0.850 km to 0950 km
Annual Plan Malayattoor GP Proj No 321 2526 Malayattoor no1 canal road completion mangali kadavu road maintenance ward 10 General Civil Work
Mangalam Project Improvement to the canal and closing leakages between Ch 500 m to Ch 1000 m of manappadam distributory of LBC
Revamping of LI Scheme- Renovation of Main canal of Karattuvayal LI Scheme (Ch 0/240 to 0/480 m ) in Kanhangad Municipality
Laying 11KV UG cable (4run) for canal crossing by HDD method after strengthening the surface near JOSCO Automobiles, Vathuruthy under Ele.section, Thoppumpady.
Kalloorpuzha LI SchemeExtension and Repair of Canal at Kalloorpuzha LI Towards Kalloor in Noolpuzha Panchayath Sulthan Bathery LA Wayanad DistrictGeneral Civil Work
Construction of pile and slab bank protection from Thykoodam bridge to eastern boundary of RO, Kochi in Champakara Canal of NW-3
Retender-Pro No SO 292/24 CANOLY CANAL ROAD CONCRETING in Div 44 in of Tanur Municipality under Annual plan 2024-25
GENERALNon Plan 202425CPPMLISRectification works to Karupputhuraikkadu branch canal between Chainage between ch0391 and ch0417 and rectification to damaged well dropGeneral Civil Work
GENERAL CPP MLBC Annual maintanace for the year 2023 24 Jungle clearance and silt removal from vembra branch canal and melepudussery distributory
Annual Maintenance of Various VCBs in Nadakku thazha Chorode Canal of Vatakara Municipality Chorode Panchayath for the year 2022 2023 Vatakara LA
GENERAL KIP LB Rectification Urgent rectification work of LB Main Canal between Ch 44150 to 44400m in Kottarakkara Constituency General Civil Work