Loading…
Loading…
13,620 results • Best match
CSM-2019-20 - Urgent rectification works for protection of canal bund of LBMC between ch 32-950km to 33-150 km
LAC-ADS-PVIP - Manjapetty MD canal bund road tiling -between Ch.2.40 km and Ch.2.675 km for year 2025-26
Annual Plan-MOODADI GP 2022-23 POTTERY TRAINING CENTRE CANAL ROAD RE TARRING WARD 9-Pro.No.251/23-General Civil Work
DEPOSIT KPIP DEPOSIT WORK Jungle clearance and Silt removal and canal cleaning works to kuruvattoor and Mundanattukara distributaries General Civil Work
Estimate for the cost of renovation of canal from chainage 310-465m (Third Phase) at Thattekkad Bird Sanctuary during 2021-2022
GENERAL-EMERGENCY MONSOON PREPAREDNESS 2026-Cleaning of Arukadamban thodu and Malayan canal near Krishnapuram Bridge in Kayamkulam municipality -General Civil Work
MOE5-KSMART-4653348//2026, Desilting of T.P. Canal from Gokulam park to Pottakkuzhy bridge in DIV-18 General civil Work- RETENDER
GENERAL CPP NP 2026 2027 Nurnee Aalamkadavu System Rectification works of Nurnee Alamkadavu canal near Ch 1 300km General Civil Work
GENERAL CPP NP 2026 2027 Nurnee Alamkadavu System Annual maintanance of Nurnee Alamkadavu main canal and its branch General Civil Work
GENERAL Action Plan 2026 27 PIP LBC Annual Maintenance to Cheriyanad branch canal from 0m to 3090 m General Civil Work
GENERAL-Project no 85/2026-27-Uma lodge bhagam krishi canal maintenance and slab laying in Marayoor GP-General Civil Work
Investigation work for side protection wall
Budget work at Kalady
Annual Maintenance of Valakam Branch canal from Ch 3/200 km to 8/000 km
The proposed work is scheduled at RB Main canal at Ch 9 200 Km and Ch 9 500 km .Where the sluice is blocked due obstruction like stones and silt inside the sluice Manual removal of this from the sluice is difficult
Clearing and Desilting of KBC Canal from ch 31/750 Km to Tail end in Kuruvatturr GP
Clearing jungle and Desilting of Kakkodi branch canal between Ch.10/000 Km and 15/600 Km
Renovation of pump house, canal and supplying and erection of motor and pump set of Ittichirikundu LIS
Clearing jungle and Desilting of Kakkodi branch canal between Ch.0/000 Km and 10/000 Km
Side Protection Work of St Marys Canal Bund Road in Ward no.20 of Vazhakkulam Grama Panchayath
Natural Calamity 2019-20_ Iritty Block Panchayath _ Valayal Canal palam moolaparamp Road in Keezhallur GP Kuttimavu Kanniritty Mambaram Road between 0/000 to 2/800 km in Thillankery Grama Panchayath
GENERAL-MLA -SDF 2026-Urgent Construction of slab above Irrigation thodu (Balance portion) in Jyothi Lane, Muttada ward in Thiruvananthapuram Corporation Vattiyoorkavu LAC-General Civil Work
GENERAL Development of WCC ch .291.00 to 310.18 Desilting of West coast canal from Chavakkad Bridge to Thiruvathra Bridge in Thrissur District General Civil Work
GENERAL MONSOON PREPAREDNESS 2025 Maintenance to the flooded office yard and car porch of Irrigation Section Koottayi in Mangalam Panchayath in Malappuram district
Mechanical works Replacing hoisting mechanism of LB main canal flush escape shutter at Manalil and patch work of embeded parts overhauling of roller wheel bend removal of screw rod of distributary shutter at Melilla west offtake
Construction of bridge near Chainage 3/100 of the Azhiyur Branch Canal at Edavanthodi in Chorode Grama Panchayath
RE-TENDER Annual Plan-Rayamangalam GP 230/2025-26- RAYAMANGALAM CANAL KAVALA NELLIMOLAM CANAL BUND ROAD C A N A L B U N D S H U T T E R T O NELLIMOLAM ROAD RAYAMANGALAM SHUTTER TO EDAVANAKULAM ROAD RENOVATION IN WARD-17-General Civil Work
GENERAL WP CSP NP Annual maintenance for 2025 2026 Clearing and Removing grass jungle and silt for Tattan canal between ch 0 00 km to 03 500 km and Kovilakam canal in between ch 0 00 km to 0 800 km tail end 2875 2025 General Civil Work
GENERAL WP CSP NP Annual maintenance for 2025 2026 Clearing and removing grass jungle and silt for Chalai RBC Canal between ch 0 00km to 06 000 km and Chalai LBC Canal in between ch 0 00 km to 02 500 km tail end 2874 2025 General Civil Work
NABARD-KPIP - Rectification works to Arakkurussi canal from Ch 2/500 to 3/100km - at Muthuvally in Thenkara GP 2023-24- General Civil Work
Reconstruction Of Department bridge near Ch 2/300 km of FACT Feeder Canal
LAC-ADS MLA ADS 2021-2022 - Sri K P Mohanan MLA Kuthuparambha LAC Paathipalam aqueduct canal Road in Mokeri Gramapanchayath-General Civil Work
PSM Improvement works to Ollukkara Branch canal between Ch.5/550 to 5/650 Km for the year 2024-25
KyIP ACP (NP) 2024-25-Clearingand desilting of Maniyur branch canal between ch 3/000 km and ch 6/000km
Annual Plan-Pramadom GP Pro no 160/24-25 St Marys English Medium school Chappathupady Canal road concrete in ward no 18
LAC ADS CPP MLBC 2024 25 Chittur LAC Construction of Eanthalpalam Edayankulambu canal bund road in Pattanchery Gramapanchayath General Civil Work
Cheramangalam Scheme Replacement of canal shutters by providing new screw gear shutter and its hoisting mechanism Shutter no16 16A at Malakkulam
KYIP ACP PLAN 2024-25-Rectification of Nadery Distributory Canal in between ch.1/500 and 1/700-General Civil Work
The work is the renovation and modernisation works to Chettur field bothie(IInd reach) of Chittilancherry North branch canal of RBMC
Kottarakkara Municipality - Annual Plan 2017-18- Construction of retaining wall and road concrete at Avanoor Canal road.( Pr.no. 31/17-18)
Clearing the canal by removing all accumulated Silt/Vegetations etc.. for smooth water flow and concreting works
General-MI-Class 2 Construction of Cross bar and other allied works for improving Irrigation facilities to Thoithala elah in Pallikkal Panchayath- General civil work
Annual Plan-Malappuram DP - (2023-24 and 2024-25), Project No 1254-24 -Renovation of Kodumudi Kalkkadavu Community irrigation project - Irimbiliyam-General Civil Work (Retender)
Retender RIDF XXV Reviving Rice Farming in Fallow Lands of Chengannur LAC Augmenting Irrigation and Drainage Facility Alakkode Padasekharam Infrastructural Development Mannar KB Alappuzha District
Annual Plan-VAZHAKKAD GP PRO NO 153/24-25-VANDOOR MAMMAD HAJI MEMMORIAL ELAMARAM VANDOOR IRRIGATION PROJECT ADDITIONAL WORK IN WARD 7-General Civil Work
SDRF-Irrigation Sub Division,Kaduthuruthy-Urgent rectification to the damaged left bank of Muvattupuzha river by the side of Vaikaprayar-Chirapuram road in Udayanapuram Panchayath
Supply, installation, testing, trial run and commissioning of 100HP submersible centrifugal pump for providing irrigation facilities at Kidangannoor Puncha in Aranmula Panchayath in Pathanamthitta District
MI KLM PLAN 2023 24 MI Class1 Renovation of VCBs and providing irrigation facilities at Karikkal ela thodu ds of vettikuzhi palam in Pavitheswaram Pachayath
Setting up of work station and side shelves for finance section PWD Buildings Roads and Irrigation in the ground floor of Public office Buildings TVPM
Supply and Installation of Video Conference systems, LAN and Wi-Fi and Telephone cabling at DCE -Works Room, Irrigation-(I and A) ,Public Office, Thiruvananthapuram