Loading…
Loading…
13,625 results • Best match
kyip deposit work 24 25 Vadakara block panchayath construction of culvert across Azhiyur Branch canal near ch 2.600km at Vellolimeethal at Chorode gramapanchayath
Annual Plan CHMD 2022 23 Pro No 6 Cleaning of Thodus Drains Kulams Irrigation Kulams Kadavu etc in Various Wards Reach 3 CHMD 06 22 General Civil Work 1
GENERAL UILLITTAPUNCHA REACH 4 IMPROVEMENTS TO KARIPPUZHA RIVER AND ITS TRIBUTARIES AND PROVIDING IRRIGATION FACILITIES TO ULLITTAPUNCHA PADASHEKHARAM IN PATHIYOOR PANCHAYATH OF ALAPPUZHA DISTRICT REACH 4 General Civil Work
Annual Plan-Malappuram DP (2024-25 and 2025-26), Project No 96-25 -Fixing Motor Pump Set For Kaliyar Vattam Kadavu Kariyakkad Irrigation Project - Irimbiliyam-General Civil Work (Retender)
442/2022-23-Side protection wall and road construction near Vellariparambu area to prevent flood during rainy season in Arannoor ward-General Civil Work-NOC from irrigation department obtained
M I Class I- Improving Irrigation facilities of M. I Scheme in Eruvaikonam ela, Renovation of Eruvaikonamkulam and construction of leading channel in Thirupuram grama Panchayath in Neyyattinkara LAC
KyIP 2023-24(Thodannur block Panchayat deposit work) Construction of bridge across Nadakkutazhadistributary canal near ch 0/440km in Villiapally grama panchayat-General CivilWork
KyIP ACP NP 2024 25 Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 12 500km to 17 100km
Feasibility study in Dharmadam river
Desiltingand cutting branches of trees
RE ETENDER Annual Plan-Muriyad GP - 2023 -24 Cashew nut factory canal road metalling and tarring completion ward 7-civil work-General Civil Work-2023-24
ENERAL AM Kannampalli LIS AM 2023 24 Annual Maintanance to LIS Kannampalli Maintanance to Main canal at Kinattumkandi of Kizhuparamba Panchayath Malappuram Dt General Civil Work
The work is proposed for the rectification of breached as well as damaged portion of Chittilancherry North branch canal between ch 0.015km and 0.133km of RBMC.
Earth work excation cement concrete 1 4 8 cement concrete1 3 6 rcc 1 2 4
GENERAL-CSM 2024-25-Annual maintenance of LBMC between CH 25/000 KM TO 29/300 KM including silt removal of cut and cover u/s portion.- General Civil Work
GENERAL-CSM- 2023-24-Annual maintenance B/W ch 29/300 km to 34/600 km including silt removal of cut and cover D/S portion.-General Civil Work
GENERAL-CSM 2023-24-Annual Maintenance of LBMC from Ch. 6/050 km to Ch. 11/000 km-General Civil Work
GENERAL-CSM 2023-24-Annual Maintenance of LBMC from Ch. 17/500 km to Ch. 22/950 km-General Civil Work
GENERAL-CSM 2024-25-Urgent Rectification works to spout at ch 6/050 and UT at ch 6/210 km -General Civil Work
GENERAL-CSM 2024-25-Removal of obstruction in LBMC from Ch. 0/000km to 22/950 Km -General Civil Work
GENERAL-CSM 2024-25-Annual maintenance B/W ch 29/300 km to 34/600 km including silt removal of cut and cover D/S portion.- General Civil Work
GENERAL-CSM 2023-24-Urgent Rectification works to LBMC between ch.19/000 km to 19/100km-General Civil Work
GENERAL-CSM 2023-24-Annual Maintenance of LBMC from Ch. 11/050 km to Ch. 17/500 km-General Civil Work
GENERAL-CSM 2023-24-Annual Maintenance of LBMC from Ch. 0/000 km to Ch. 6/000 km-General Civil Work
GENERAL-CSM- 2023-24-Annual maintenance B/W ch 25/000 km to 29/300km including silt removal of cut and cover U/S portion.-General Civil Work
GENERAL-CSM 2024-25-Annual Maintenance of LBMC from Ch. 17/500 km to Ch. 22/950 km - General Civil Work
GENERAL-CSM 2023-24-Removal of obstruction in LBMC from Ch. 0/000km to 22/950 Km-General Civil Work
GENERAL-CSM 2024-25-Construction of bund protection wall on the right side of LBMC near ch.10/500km - General Civil Work
GENERAL-CSM- 2023-24-Urgent Rectification works to LBMC near Ch. 33/950 km-General Civil Work
GENERAL-CSM 2024-25-Urgent Rectification works to LBMC near ch 25/000 Km - General Civil Work
canal
canal
CANAL
canal
canal
Canal
Canal
Canal
Canal
This MLA ADS work is proposed for laying interlock paving tiles on the right bund of Kodanad East Branch canal from Ch 0.680km to Ch1km for a length of 320m and width 2.7m.
Engaging labour during water distribution
Engaging labour
Annual maintenance and removal of floating bodies for one year
GENERAL-Public office, Thiruvananthapuram - Renovation of the establishment section of CE Irrigation (Admin) and DCEs room in the first floor of main building and first floor of Annex building-Electrification
earth work Excavation cement concrete filling quary munk name board
Desilting is planned for a total length of 950m , in which 200m is coming under curve portion and 750 m coming under striaght portion.In curve portion depth of excavation is 80cm and 50cm is the depth of excation for straight portion.
KyIP ACP PLAN 2023-24 - Rectification of canal between Ch.37/850 to 37/950 km in LBMC including urgent maintenance of Nadery aqueduct
Annual Plan 2023 2024 Karukutty GP Project No 298 24 Parambinkatta Canal Bund SC Colony Side Protection work in Ward No 10 General Civil Work Civil Work
GENERAL-Felling Trees-Urgent Monsoon preparedness 2024-Felling of unsafe trees on canal land in Karuvarakundu panchayath of Wandoor LAC , Malappuram district.-General Civil Work
GENERAL-Thrithala LIS-Renovation of Ch. 0 to 200m and at Tail end of Mangaram branch canal of Thrithala LIS in Thrithala Panchayath- General Civil Work