Loading…
Loading…
13,625 results • Best match
SDRF-GPS 1-RBC-2019-Urgent rectification works of CADA Mundapulikadu field canal Variyathukalam branch) b/w ch.0/00km to 0/650 km) (14 Schemes).
GENERAL-PSM 2024-25-Annual maintenance of Mudikkode branch canal from Ch. 0/000 to 6/700 km for the year 2024-25-General Civil Work
General civil work MOE3/Ksmart/2722332/2025 Flood urgent Road renovationnear mullasseri canal road meets Chittoor road Thammanam pullaypadi road near kaaranakodam road PAYMENT PRIORITY TENDER
PM 2020-21 Repair works to pipe aqueduct support and maintenance of canal and construction of cross drainage work in Kurunthottimanna LI Scheme at Nilambur Municipality.
DEPOSITNIP Parassala GPConcreting of Mundaplavila Kakottukonam bund road on the right bund near ch4916m of Kollamcode branch canal in Muriyathottam ward Third step General Civil Work
Annual Plan-2025-26/PYM/Pr. No. 104/26 - CHATTUKKALLUMTHARA CANAL BUND ROAD RENOVATION in Ward - 08 - PARIYARAM GP- Chalakkudy BP-Road Renovation-General Civil Work
GENERAL PSM 2024 25 Annual maintenance of Vellanikkara branch canal from Ch 0 000 to 5 400 km for the year 2024 25 General Civil Work
GENERAL-PSM 2025-26-Annual maintenance of Puthur Diversion canal from Ch. 0/000 to 5/000 km for the year 2025-26-General Civil Work
DEPOSIT KPIP DEPOSIT WORK Jungle clearance and Silt removal and canal cleaning works to kuruvattoor and Mundanattukara distributaries for the year 2024 25 General Civil Work
E2-9469/23 (Plan fund) ward-35-Retarring at Kinattushala kalapurakkal cross road, Madathupidiya Bye road Kinattushala bye road, NPOL canal side road in ward 35
DEPOSIT-Challiyil drain-Providing Covering slab for the challiyil drain to TS canal at ward No.15 of Alappad Panchayath in Karunagappally LAC-General Civil Work
CPP MLBC Annual maintanance for the year 2022 2023 jungle clearance and silt removal from mettupalayam mangode and ayyampadam branch canal including attanchery and karikulam distributries
Annual Plan-Veliyam GP 2023-2024 (P-155/23-24)-Malayil Canal bhagam Ben heaven ela road side wall in ward no.10 of Veliyam GP
GENERALCPPMLBC Annual maintenance for the year 202425Jungle clearance and silt removal from Edayankolumbu branch canal and Edayankolumbu extension No1 and Edayankolumbu extension No 2General Civil Work
SDRF LBC Sub Division Malampuzha Project Palakkad Urgent rectification and maintenance work of field channel off take from ch 23/950 km of LB Main canal
GENERAL-water distribution 2023-24- Engaging labour for water distribution through canal under MVIP Subdivision no.9 Ramamangalam for the year 2023-2024- General Civil Work
GENERAL CPP MLBC Annual maintanence for the year 2023 24 Jungle clearance and silt removal from Arampadam branch canal between Ch10/050 km to 18/000km
GENERAL-CPP-TMS-ACTION PLAN-2025- 26-Annual maintenance of TMS Main canal between Ch 0/000 km to Ch 5/500 Km.- General Civil Work
MLA SDF 2020 21 KIP LB Mylakkadu distributory construction of canal road concrete between Ch 2450m and 2560m near Mylakkadu Panangodu Junction in Adhichanalloor Grama Panchayath
CPP MLBC Annual maintanence for the year 2022 23 Jungle clearance and silt removal from Arampadam branch canal between Ch0/000 km to 5/000 km
GENERAL - Drain clearance - Drain clearance on Francis road junction - Vengali gate road at puthiyakadavu Ch 5/300(ration shop no.30 to canal ) - General Civil Work
Annual Plan-Project No.-116/26-Tarring and Retarring works to Kolachery canal Kariyil vayal road at ward-7 in Kolachery Grama Panchayath-General Civil Work
RETENDER - PTZ-43/2021-22-Sub Canal Road Retarring in Ward No. 14 of Vadavucode Puthencruz GP. under Annual Plan 2021-22 (Estimate asper DSR 2016)
GENERAL-Investigation -Nilshwaram - Bekal waterway-Additional Investigation for the construction of Nambiarkkal Lock across diversion canal in Kanhangad Municipality in Kasargod District- Additional boreholes- Investigation Work
GENERAL ES ANNUAL ACTION PLAN 2022 23 MP LBC Rectification works to sluice no.52 offtake from Ch. 24.460 km of Chulannur canal. General Civil Work
GENERAL PSM 2024 25 Annual maintenance of Pattikkad branch canal from Ch 0 000 to 5 200 km for the year 2024 25 General Civil Work
DEPOSIT-KIP LB-Providing guard post on both sides of the Kulakkada Branch Canal at Ch. 4250m (Near Rajan cashew factory, Palli Road).- General Civil Work
Annual Plan- 2025-26 /PYM/Pr. No. 218/26 - Canal Bund Link Road concreting in Ward 01 - Pariyarm GP - Chalakkudy BP-Road Concreting-General Civil Work
DEPOSIT KPIP Deposit Work Jungle clearance silt removal and canal cleaning works of vellinezhy and pothi distributaries for the year 2023 24 General Civil Work 1
Work Name S 141 2020 21 INTERLOCK PAVING OF CANAL BY LANE PLATHAZHATH BY LANE AND S N D P BY LANE IN WARD NO 11
GENERAL CADA CPP MRBC Rectification from ch 0 00 km of CADA offtake at ch 5 100 km LHS of RB main canal General Civil Work
GENERAL-PSM 2023-24-Annual Maintenance of Vellanikkara Branch Canal from Ch.0/000 to 5/400 km for the year 2023-24-General Civil Work
M and R-Removal of Obstructions from Puthenthodu from Karanchira Lock to Meeting Point with Herbert Canal before Kundoli Kadavu Bridge for the Year 2021-22
M A L A Y A T T O O R - NEELEESWARAM GP 75/22-23 THIRD BLOCK CANAL BUND ROAD RECONCRETING, MAINTENANCE-75/22- 23
GENERAL-MVIP-Action plan 2025-26- Annual maintenance of Ettumanoor branch canal from ch 0m to 12000m for the year 2025-26-General Civil Work-1
CPP MLBC Annual maintanence for the year 2022 23 Jungle clearance and silt removal from Arampadam branch canal between Ch5/050 km to 10/000 km
Mangalam project Dam Section Improvement of Punnapadam Distributory to the field canal at ch 1 418 sluice ch 0 070 to 0 210 km of RBMC
GENERAL NIP Emergency work of side protection works near ch 29350 m left side of RB Main Canal in Aralamoodu cut and cover General Civil Work
Renovation work Keezhmad LIS-Reconstruction of side wall and providing fencing to Keezhmad LIS (Thottumugham) canal in keezhmad grama panchayath from ch. 175m to ch. 288m.
DEPOSIT-Kyip Deposit 2025-26-KunnummalGP- Construction of Chekkiyad Indoor Stadium Canal Road at Right Bank of RBMC Near CH.20/260 km-General Civil Work
CMLRRP 2020-21 KONGAD CONSTITUENCY - MANNARKKAD BLOCK PANCHAYATH (AS SI NO-580) EDAKKURUSSI CENTRE CANAL ROAD KAPPADAM PUTHANKALAM ROAD KOLLARAKKUZHI PAMBOORIL ROAD IN KARIMBA GRAMA PANCHAYATH
LRRP-LRRP 2024-25, MATTANNUR LAC SL.No-0111-PADIYOOR PULIKKAD CANAL PARA KOMBARATHI ROAD (PADIYOOR PULIKKAD KOMBANPARA KOMBARANJI ROAD) PADIYOOR KALLIAD GP IRIKKUR BP KANNUR DISTRICT
SDRF-Peechi scheme-Rectification-Flood related works-Side lining of Kootala branch canal from ch.5/400 to 5/800 km for the year 2018-19
GENERALCPPMLBC Annual maintenance for the year 202425 Jungle clearance and silt removal from Meetupayalam Mangode and Ayyampadam branch canal including Attanchery and Karikulam distributoriesGeneral Civil Work
Annual Plan-WARD-3 2023-24-MOOKKANNUR GP PRO NO 69/23 KUZHOOKKARANKAVALA SANKARANKUZHY CANAL BUND ROAD SIDE PROTECTION WALL CONSTRUCTION Ward 3-General Civil Work
Handling and Transport on Lumpsum Basis - Desilting Dredging TS canal between Padmanavan jetty and Vattakayal at Vellanathuruthu Ilmenite mine by engaging 100 ton capacity Diesel Dredger
GENERAL-KyIP ACP(NP)-2025-26-Clearing jungle and Desilting of Kakkodi branch canal between Ch 0/000 Km and 10/000 Km-General Civil Work
GENERAL FDR 2024 25 Providing bit BC overlay to Wada Canal North Bank Road from ch 1/000 to 2/210 FDR work General Civil Work
LAC-ADS-LAC-ADS 2020-21 -Proposed by MLA Sri. Chittayam Gopakumar - Construction of Pookunnilpadi Canal road in Ward 9 in Adoor Municipality-- General Civil Work
CSIND Chain link fence to curb the disposal of waste by the citizens directly in to the waterbody from PanikkarKadavu Bridge constructed across West Coast Canal