Loading…
Loading…
13,625 results • Best match
S.84/27-Cleaning of thodu near Perandoor Canal and Renovation of Drain near the premises of Pannappilli, Madavanathazham, and Pachalam Auto Stand in Div 19
GENERAL-KyIP CADA 2026-27-Renovation and modernization works to East Velom Field Bothie canal in between Ch. 0-350 and 0-700km-General Civil Work
GENERAL ACTION PLAN NON PLAN 2026 2027 Rectification of existing retaining wall near to the embankment of Main canal near ch 21 150 General Civil Work
GENERAL KyIP AC P Plan 2026 27 Rectification of leaked portion of Right Bank Main Canal near Ch 29 550km General Civil Work General Civil Work
The work is proposed for desilting of canal to prevent water logging.This work has been included under the deposit work to enable smooth water distribution during the year 2026- 27 second
RETARRING AND DRAIN
Clearing jungle and Desilting of Kakkodi branch canal between Ch.15/600 Km and 20/300 Km and FBs coming from it
Construction of Net platform Maniyur branchcanal near 0/050km and Rectification ofManiyur branch canal between ch 0/050km to ch 0/150km-
provision for clearing grass twice on both canal side before mundakan crop distribution summer water distribution Silt removal from unlined bottom and concreted bed bottom with suitable thickness proposed to necessary lengths of canal
148/22-23_Maintanance of Piraroor Club road ,Millumpady Canalbund road ,Manakkapady Thiruvellamanthulli road,Manakkapaday Puliyambilly road ,Thalasseri Canal Moonnubund link Anganvadi road in ward 15 of Kalady GP under Annual Plan 2022-23
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance of through the RBC main canals to the paddy fields during this year 2025-26 and this work needs to be executed prior to water distribution
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distributio
KPIP AM Rectification of Kulakkad distributary at ch 1/100 km to 2/000 km
GENERAL-Emergency Monsoon Preparedness and flood damages for the year 2025-26-Felling of unsafe trees on Moothikkayam LIS irrigation land in Moorkkanad Panchayath in Mankada LAC. -General Civil Work
E-tender-MPLADS-2019-20-Concreting of canal road connecting Marthoma Church ugrankunnu road (168-336) in opposit of Nehru memorial school i in ward 9 of Adhichanalloor GP
Annual Plan-Project 139/23-24-Cleaning of canals within municipality Kalarcode ward-W10-General Civil Work
MLA-SDF-2021-22 Nattika LAC- Construction of Canal bund road in ward III of Anthikkad Grama Panchayat-Interlock Tile Work-General Civil Work
Clearing grass Demolishing CC EWE Cement concrete steel reinforcement 9m m cement plastering filling contractors own earth
Urgent rectification work
GENERAL-CPP-TMS-ACTION PLAN-2024- 25-Annual maintenance of TMS Main canal between Ch 0/000 km to Ch 5/500 Km for the year 2024-2025
KyIP ACP NP 2024 25 Urgent Works for Jungle Clearance and silt removal of Right Bank Main Canal from Ch 27 000km to 34 270km
Deposit work - NRDWP Aug to Thrikkur and Kallur villages - Pipe line extension at Poonissery Angawadi road, poonissery canal road in ward no.8 of Thrikkur Grama Panchayath
SDRFCPP MLBC Urgent rectification works to Flood Damages in Main Canal between Ch.15/650km to Ch.15/780km and Ch.15/900km to 16/130.
DEPOSIT-NIP-Parassala GP - Concreting of Charinjakala - Pinarakal bund road on the left bund near ch27790m of LB main canal in Nediamcode ward-General Civil Work
GENERAL-KyIP ACP PLAN 2024-25- Rectification of leaked portion of GENERAL KyIP ACP PLAN 2024 25 Rectification of leaked portion of Azhiyur branch canal near ch 11.110km and 12.130 km
Rectification of canal between ch 5/600 km to5/900 km and urgent maintanance of Thandottyaquaduct near 7/200 km in Thiruvallur dty
RE-TENTER -Annual Plan-proj.171/24-25 Rayamangalam gp-TILE PAVING ON MURALIDHARAN PADY PVIP CANAL VATTAKKATTU ROAD WARD 17(MULTI YEAR)
State Plan 2025-26, it is proposed to construct a new office building for the Kerala Water Authority Sub-Division and Section Office at the Irrigation Office Compound, Alathur Village, Alathur Grama Panchayath.
earthwork excavation C C 1 4 8 for foundation C C 1 3 6 for side wall along with plastering clearing grass on both canal sides engaging man mazdoor for clearing obstructions steel shutters for spouts and painting
The estimate is prepared for lubricating works for regulators, supplying padlocks for sluice shutters before starting the water distribution and for engaging man mazdoors for canal watching during water distribution.
GENERAL-KIP(LB)-Patch work, painting and erection of Appuppankavu Cross and Flush shutters (2nos) and providing new hoisting mechanisms at Ch 12100m of Paravoor branch canal.-General Mechanical Work
Protecting the Left bank
Repair and maintenance
Maintenanace
Annual Maintenance
Deepenong and cleaning
Maintenance
GENERAL KPIP AM Urgent Rectification works to Arakurussi tail end canal From Ch 8000 km to 8500 km in Mannarkkad Municipality for the year 2022-23 General Civil Work
KyIP Deposit work-(Melody block )Makkattu mukku Navaprabha canal bund road in LBMC inbetween ch 28/000 km and ch28/200in Meppayyur panchayth- 2nd reach
KyIP ACP PLAN 2023-24 - Replacing and Maintanance of damaged pipe line in Ayanchery dty canal between ch 0/050 km to 0/500 km
GENERAL KPIP AM 2026 27 Canal cleaning including jungle clearance silt removal through LBMC between Ch 23 000Km and 31 500Km and its distributaries General Civil Work
Annual Plan-Annual Plan-CHERTHALA MUNICIPALITY - PROJECT NO- 376-2023-24 Protection of Pazhukka chira canal ward 35-Side wall protection of Pazhukkachira kai thodu ward 35
GENERAL CADA CPP MRBC Rectification from ch 0 00 km of CADA offtake at ch 3 000 km LHS of RB main canal General Civil Work Maintenance
GENERAL- EBC- Engaging labourers 2024-25-MVIP- Engaging labourers for water distribution of Ettumanoor branch canal and its distributories for the year 2024-25- General Civil Work
MP LBC Annual Maintanance of Kadalakurissi branch canal ch 0 000 Km to ch 8 400 KM in Kannadi Panchayath for 2nd and 1st crop water distribution.
CSM-Flood damages -2018-19-SDRF-Urgent Rectification work of Pynkulam Branch canal nearch.0/300 km and between Ch.0/450 km to 0/650 km
GENERAL-MONSOON PREPAREDNESS 2025-2026-MP-LBC-PS- LB main canal from Ch 0/300Km to 20/200Km and its branches and field channels-General Civil Work
MLA-SDF-2024- 2025-Parakkodu BP-Adoor LA-Work Proposed by Sri Chittayam Gopakumar MLA-Marthoma Pallippadi Canal Road Construction in ward no.3 of Erathu GP
Name of Work Deposit work KSP WSS to Nattakom extension of pipe line at St Mary s Nursery s Polachira canal road in ward 37of Kottayam Muncipality
GENERAL-ANNUAL PROJECTS 2023-24- PROJECT NO 274/24 VALADITHANDU COLONY 2ND STREET MAINTENANCE CANAL BUND ROAD RAMALLOOR LINK ROAD CONCRETING IN WARD -8-General Civil Work