Loading…
Loading…
13,626 results • Best match
GENERAL-ANNUAL PROJECTS 2023-24- PROJECT NO 274/24 VALADITHANDU COLONY 2ND STREET MAINTENANCE CANAL BUND ROAD RAMALLOOR LINK ROAD CONCRETING IN WARD -8-General Civil Work
Annual Plan-Angamaly Muncipality -2025-26 Anganavadi-Canal Bylane Road,Vellilapongu Bylane Road Retarring Ward 30 (Project No 84/26)-project no 84-General Civil Work-1
CSM-2021-22 Annual maintenance of LBMC B/W ch 22/950km to 25/000km including clearing and silt removal of Killimangalam, Pynkulam and Panjal branch canal.
GENERAL-EBC-Engaging labourers 2023-24-MVIP- Engaging labourers for water distribution of Ettumanoor branch canal and its distributories for the year 2023-24.-General Civil Work
Annual Plan-2025-26 /PYM/PRO NO. 103/26 - KONNAKUZHY VALTHUKARA MAIN CANAL BUND ROAD CONSTRUCTION - WARD 08- PARIYARAM GP - Chalakkudy BP-Road Construction-General Civil Work
GENERAL ACTION PLAN 2024 25 KPIPAM Canal cleaning including jungle clearance silt removal through Mannampetta No 1 and No 2 Eswaramangalam and Valambilimangalam distributories General Civil Work
NABARD RIDF Infrastructural development works in various padasekharams under different krishibhavans of Malampuzha Legislative Assembly Constituency, Palakkad District Construction of retaining wall and canal under Akathethara Krishibhavan
MP LBC Modernisation of Field Channels and Drains- Renovation of field channel off take from ch.0.334 km of Manjallur branch canal in Manjallur - Kadamkkode Padasekhara samithi
Retender-PTZ S0382/25 Moolekuzhy Pulikkayathu Canal bund Road, Moolekuzhy Bridge Road Retarring and Drain in Ward 12 of Vadavucode Puthencruz GP-Under annual plan 2024-25
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Olassery branch canal between ch 0/000 to 4/200 km
GENERAL AP 2026 27- Mangalam project CSVDY1Clearing jungle and removing silt in between Ch 05 400 to Ch 17 600 Km of LB Main Canal including Distributaries
Annual Plan 2024 2025 Malayattoor Neeleeswaram GP Project No. 332 25 Construction of Handrail for Neeleeswaram No 2 Canal Bund in Ward No 15 General Civil Work
GENERAL CPP MLBC Annual maintanace for the year 2023 24 Jungle clearance and silt removal from mettupalayam,mangode and ayyampadam branch canal including attanchery and karikulam distributory
GENERAL WP 2024 2025 Rectification works of No 3 Distributory canal in between ch 11 620 km to ch 11 750 km 2349 2024 General Civil Work
DEPOSIT NIP Kulathoor GP Construction of Retaining wall near ch 21565m on the right side of Kollamcode branch canal at Muzhanguvila in Uchakada ward General Civil Work
GENERAL CPP KKPS CADA 2025 26 Modernization of field channel offtaking from sluice no 10 of Vadakkepirivu branch canal from ch 0 900 Km General Civil Work
CSIND Chain link fence to curb the disposal of waste by the citizens directly in to the waterbody from Kallummoottil Kadavu Bridge constructed across West Coast Canal
Annual Plan-Kuthuparamba BP-2024-25- Project No 144/24-25 Retarring works to Purakkalam Canal Ambilad Road Ch 0/000 to 0/250km in Kottayam GP
Retender-NC FLOOD 2023-24 -Thalassery BP-Vengadu theru Canal kara road/Vengadu theru Canalpalam road- CH 0/00-0/250KM in vengadu GP -General Civil Work
GENERAL KyIP ACP NP 2025 26 Urgent Works for Jungle Clearance and silt removal of All Distributaries and Field bothies of Azhiyur Branch Canal General Civil Work
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Main canal between ch21/400 km to 24/500 km
GENERAL-KyIP ACP(NP) 2024-25-clearing jungle and desilting of kakkodi branch canal b/w Ch 10/000 Km and 15/600 Km-General Civil Work
Annual Plan-2024-25. Poruvazhy GP Proj No.241/24-25- extension of culvert and retaining wall construction at Paruthivila Thenguvila canal road ward7-General Civil Work
GENERAL CPP MLBC Annual maintanace for the year 2023 24 Jungle clearance and silt removal from edayankulambu branch canal and edayankulambu ext.1 and edayankulambu ext.2
GENERAL-Annual maintenance of Nadakkuthazha - Chorode canal at Kommanerithazha VCB cum BRIDGE in Eramala Panchayath,Kozhikode District for the year 2022-2023-Vatakara LA-General Civil Work
M and R-Removal of Obstruction of Kole Chal from Panoli Canal including Cutting and Stacking of dangerously standing and fallen trees for the Year 2021-24
GENERAL-AM 2025-26 Pampanthod scheme -Annual maintenance works to Pambanthodu MI Class 1 Canal diversion scheme near Ch 1/000 in Kanjirapuzha GP-General Civil Work
LAC-ADS-Extension of right branch canal of LIS Narippottakkunnu and Construction of river side protection wall near LIS Narippottakkunnu pump house in ParudurPanchayath of Thrithala Constituency.
DEPOSIT-NIP - Parassala GP--Concreting of Mundaplavila-Kakottukonam bund road on the right bund near ch 4720m of Kollamcode branch canal in Muriyathottam ward-General Civil Work
GENERAL-PLAN FUND 2025-26-Renovation of TD cada between ch.0/450-0/650 km of Peringottukurissi canal at oduvankad in Peringottukurussi Panchayath-General Civil Work
CPP MLBC Annual maintenance for the year 2021 22 Jungle Clearance and removing silt and weeds in High Level Canal from Ch 0/000km to 7/150km
DEPOSIT-DEPOSIT 2024-25 Thalodithazham-Mundiadimoola road Re tarring(Canal Inspection road b/w Ch 1/700Km to Ch 1/770Km of Cheekkilode Dty)-General Civil Work
P A R A L I G P 2 0 2 4 - 2 5 KARUTHEDATHU TO KIZHAKKEKKARA CANAL PALAM RAOD MAINTENANCE IN WARD NO.08-425/25
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Olassery branch canal between ch 4/250 to 8/500 km
GENERAL-MP-LBC- PS-Annual maintenance of Pirayiri branch canal from Ch 0.000Km to TD for 2023-24 Second crop and 2024 first crop-General Civil Work
GENERAL-AP-2025-26-MP-Annual maintenance-2025-26 -Silt Removal , Jungle Clearance for LB main canal from ch 20/200km to 31/600km.-General Civil Work
Cheerakuzhy Scheme- Flood damages Urgent removal of silt from the canal bed between Ch. 11/100 km to Ch. 17/000 km for the year 2021 - 22
SC Corpus Fund-SC Corpus Fund 2022-2023-Kizhakke mattam Colony Ward 2 Construction and Raising of Althara palakkal - Canal Road In Chettikulangara GP-General Civil Work
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Koduvayoor branch canal between ch0/000 km to 2/700 km
GENERAL-NIP-Construction of side protection wall and raising on the right side and left side of Kollamcode branch canal near ch 1530 m-General Civil Work
Annual Plan 2024 2025 Malayattoor Neeleeswaram GP Project No 325 25 Maintenance of Malayattoor No 1 Canal Road Kunnil Road in Ward No 10 General Civil Work
CPP MLBC Urgent Rectification works bet ch 0/251km and 0/281km of Pokkunni distributory and bet ch 13/065km and 13/095km of Arampadam branch canal
MLA - ADF - 2024-25 - Kalpetta LA - Panankandi Kattunayka Unnathi including Karappuzha Canal Inspection Road To Panankandi Shree Kariyathan kshethram Road Tarring - Kaniyambetta GP-1500000/- General Civil Work
GENERAL CPP-MLBC MODERNISATION OF ANJUVELLAKADE BRANCH CANAL BETWEEN CH 0 000 KM TO 0 225 KM AND 0 400 KM TO 0575 KM General Civil Work
GPSI-RBC-RKI-Renovation and Construction of cut and cover in RB main canal between ch.14/555km to 14/855km (Pudunagaram road cross Upstream and Downstream).
LAC-ADS-Kyip-LAC ADS-2025-26- Construction of culvert across right bank main canal at ch.23/200km in Kunnummal GP,Kuttiyady LAC-General Civil Work
GENERAL CPP Nurnee system CADA 2025 26 Modernization of field channel from spout near Ch 7 570 km of Nurnee main canal Phase 5 General Civil Work
GENERAL CPP MLBC CADA 2023 24 Modernisation of field channel at ch.10/500km LHS (Kuttipully) and at ch.11/000km RHS (Thachankode) of Arampadam Branch canal
Annual Plan-KOODALI GRAMAPANCHAYATH-2024-25 RETARRING WORKS TO KOYYODANCHAL MUZHAPPALA CANAL ROAD IN BETWEEN 0/260KM TO 1/830KM -PROJECT NO.03/25-General Civil Work
Drawing 4 numbers of HT UG Cable of 3x300SQ. MM XLPE from 110KV Substation,Kattaribagh to waste water canal near Kendriya Vidyalaya,Naval base under Ele.section, Thevara.