Loading…
Loading…
13,564 results • Best match
GENERAL DESILTING Removing wastes cleaning blocks and desiltation of Ayiroor river on the right bank D/S OF check dam near Elakamon Panchayath Ramp work Reach-1-General Civil Work
GENERAL-Monsoon Preparedness 2026-Removal of silt and obstructions from Cherupuzha at downstream side of Palakuli check dam and cutting of branches of tree at Palakuli junction in Mananthavady Municipality
GENERAL-Patchwork of KIP canal shutters-Patchwork, Painting and providing newhoisting mechanism for offtake shutter of enadimangalam distributary at ch-36890m of RBMC. -General Mechanical Work
Work includes cleaning of Kinavallur branch canal for 2023-24 second crop and 2024 first cropMankara, Pathirippala, palappuram branch canals and Minor Distributorys and Field canals
Annual Plan-7/23 Kumbalanghy G P Cleaning Rennovation of various drains canals of ward-7- Kumbalanghy G P Cleaning Rennovation of various drains canals of ward-7-General Civil Work
Annual Plan-4/ 23Kumbalanghy G P Cleaning Rennovation of various drains canals of ward-4-4/ 23Kumbalanghy G P Cleaning Rennovation of various drains canals of ward-4-General Civil Work
8 KALIKOLLY IRRIGATION PIPE LINR REPLACING IN THIRUNELLY GP
GENERAL CADA 2023 24 MP LBC MSModernization of field channels Renovation of field channel sluice no.1 at Chenganiyoor No.2 baranch canal of peringotukurissi canal. kizhakekara padasekharasamithi General Civil Work
canal works
GENERAL-PSM 2024 - 2025- Monsoon Preparedness -LBC and branch canals- Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition. -General Civil Work
Construction of a Steel Foot Bridge across Badagara Mahe Canal at Kallil Thazha
Construction of a Steel Foot Bridge across Badagara Mahe Canal at Pothimadathil thazha
GENERAL-PM-Rectification of breached portion of Shiriya canal b/w chainage 1/700 to 2/200km-General Civil Work
Jungle clearance Silt removal and canal cleaning works of Karumanamkurissi Kulakkad distributaries and Kuttanassery minor distributary - including water distribution of all distributaries between Ch33/000km to 42/000 km for the year 2026-27
DEEPENING OF NATURAL CANALS ON EAST SIDE OF NH in PUNNAPRA SOUTH GP
Annualplan23-24 kunnukara gpcleaning of various sreamwharfs canals in kunnukaragp pr no7/24
ERIYAD GP 2024-25 SIDE PROTECTION OF INTERMEDIATE SMALL CANALS Pro no/334
DGPS Survey and Alignment Stone Laying Works in IURWTS Canals in Kochi (Package02)
CPP-KKPS- Mechanical works - Repairs and Renovation of shutters of various branch canals
DGPS SURVEY AND ALIGNMENT STONE LAYING WORKS IN IURWTS CANALS IN KOCHI (PACKAGE_01)
PERUVALLUR GRAMA PANCHAYATH - ANNUAL PLAN . 2021-22 CONSERVATION OF CANALS Pro.No. 238-22
RLIS Repairs and extension of canals of vellannur LI scheme in Chathamangalam Panchayat
DGPS SURVEY AND ALIGNMENT STONE LAYING WORKS IN IURWTS CANALS IN KOCHI (PACKAGE_03)
DISASTER MANAGEMENT - URGENT DESILTATION WORKS TO ANCHUCHUMANA CANAL IN VECHOOR PANCHAYATH
SDRF-CPP-Nurnee System- rectification of nurnee main canal Between ch.7/600km and 7/755km
Rectification of canal
Rectification of canal
Olassery main canal branch canal
Modernisation works of field channel in Ramassery branch canal of Walayar canal section Para
GENERAL KIP O and M Annual Maintenance 2025 26 KIP O and M Annual Maintenance of Vallikodu distributary from Ch.0m to 8054m Vallikodu minor distributary from Ch 0m to 2285m Nariyapuram minor distributary from Ch.0m to 6800m and Thrippara minor di
GENERA KIP O and M Annual Maintenance 2025 26 KIPO and M Annual maintenance of Kodumon distributary from Ch5315 to Ch16315m Kodumon West minor distributary from Ch 0 to Ch3280m Kodumon east minor distributary from Ch 0 to Ch1990m Murinjakal minor d
Annual Maintenance of Canals
GENERAL WP CSP NP 2025 2026) Clearing weeds and obstruction during the water distribution Emergency tree cutting emergency bund strengthening using earth bags etc for various canals under Walayar Canal Section Para 4048 2025 General Civil
Canal work
GENERAL-KPIP - AM - Cleraing jungle and desiltation of thampan canal from ch 0/000 km to tail end-.-General Civil Work
CPP KKPS Annual maintenance to Kunnamkattupathy main canal between ch 19/000 to 30/600 Km and its 6 branch canals for the year 2023 24
Urgent rectification work of Chavara distributary from ch9800 to 9845m
LAC ADS KIP Edavanassery Minor Distributory Construction of Culvert across Edavanassery Minor Distributary and Canal Bund Road concrete work NSS Karayogam Anoorkkavu bund road in ward No 1 of Mynagappally Grama Panchayath
NEW WORK
Refer Tender Document
refer tender documents
construction of check dam
Construction of check dam
REPAIR OF CHECK DAM
105 _ Check dam road
Construction of Check dam
LRRP-CMLRRP 2.0-CMLRRP 2.0 2024-25, Kalamassery LAC, Sl.No 2555 Chirangara Nethaji Irrigation Canal Road (Ward 6), Alangad GP, Ernakulam District-General Civil Work
Rectification works to Cherapuram FB between Ch.0/000 and 0/200, Velom branch canal between Ch.0/000 and 0/100 and maintenance of damaged shutters in Thiruvallur Distributary
PSM-Annual maintenance of Kolazhy,Tirur,Kuttur,Velappaya,Perinchira and Uthramkulangara Branch Canals for the year 2019-20.