Loading…
Loading…
13,564 results • Best match
CONCRETE CHECK DAM
CHECK DAM, DR
CHECK DAM MAINTENANCE
Annual Plan 2023 24 Pala Municipality 90 24 MOYITTI CURVE ETTOLI ROAD SEMITHERY ROAD KAVEEKUNNU CHEERANKUZHI JUNCTION KADALIKATTIL ROAD CHECK DAM ROAD MAINTENANCE WARD-7-General Civil Work-1
MI- Class II works-Repair and Renovation of MI structures 2017-18- Construction of check dam across Gayathri river at D/S of Puliyanthoni Ana in Muthalamada Grama panchayath
Construction of Canal bridge
Pipe line extension
Refer tender documents
Pipe Line Extension
completion work
Pipe laying
refer tender documents
refer tender documents
Refer tender documents
road work
Rectification of Thiruvangoor distributary
Annual Maintenance of Canals
KIP LB Annual Maintenance of Canals Removal of floating bodies from Kulakkada Branch Canal from Ch 4000m to 21725m Cherumanadu Distry Attuvassery Distry Mylamkulam Distry Tenguvila Distry and Thazhathukulakkada Distry in connection with water di
GENERAL Annual maintenance of Canals Jungle clearence silt removal and Removal of floating bodies and accumulated waste from Oyoor branch canal Oyoor amp Kattayil distributaries in connection with water distribution for the year 2024 25
GENERALAnnual Maintanence 2023 2024 KIP O M Annual maintanence of canals 2023 2024 Jungle clearence and removal of floating bodies during water distribution in Sasthamcotta branch Canal between ch 7000m to 18650m General Civil Work
GENERAL CPP MLBC Engaging man mazdoor labour for removing weeds, debries and flow disturbing materials etc and sapling in the Main canal between Ch 21/700 km to 24/500 km and its branch canals
GENERAL Pothundy Project 2026 27 Canal C l e a n i n g wo r k s o f Ayilur,Nemmara,Paliyamangalam and Thiruvazhiyad branch canals and Maintenance of Chembode Cheethavu Aqueduct of LBMC
GENERAL-CSM 2024-25-Urgent rectification work of Killimangalam branch canal near ch 3/200 km - General Civil Work
GENERAL-CSM 2024-25-Urgent rectification work of slipped canal bund near ch 34/500 Km - General Civil Work
The work is proposed in the action plan for the cleaning ofVallanghy, Kaippancherry, Kanimangalam Thekkumpuram,Chittilancherry North and Chittilancherry South branch canals for water distribution.
BSP Construction of Kappumkunnu Distributary from Ch 1020m to 1500m including CD Works
Construction of a Steel Foot Bridge across Badagara Mahe Canal at Karuvayal
Construction of Steel Foot Bridge across Badagara- Mahe Canal at Kaunthan Nada
KPIP AM Urgent Rectification to Kailiyad North distributary between the Ch 0/000km to 0/200km Kailiyad South distributary between Ch 0/000km to 0/200km and Kulappully distributary near to Ch 7/100km and for the year 2022 23
GENERAL KIP(LB) Fabrication, painting and erection of shutter and modification of hoisting mechanism at Pallimon Distributary Cross Regulator Ch 3970 of Pallimon Distributary General Mechanical Work
GENERAL-Monsoon Preparedness 2025- Tree Cutting-Cutting dangerous trees on Main canal bund near Mullankuzhi LIS and Left Branch canal bund near Thekkepadam LIS on Irrigation land in Mooniyur Grama Panchayath, Vallikunnu LAC, Malapuram District-Genera
Rectification of canals of LI schemes
155/22-CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY (PANACHITHARA THODU) IN PALLATHURUTHY WARD
Removal of sand and gravel deposited in canals and weirs
GENERAL-448/24-Paipra GP-Thrikkalathoor Pallichira-punnoppadi lift irrigation pipelane maintenance-General Civil Work
Annual maintenance of Kolavally Stage I Lift Irrigation Scheme in Mullenkolly Panchayath-General Civil Work
Annual Maintenance of Kolavally Stage II Lift Irrigation Scheme in Mullenkolly Panchayath-General Civil Work
Filling WMM Tarring
Re -Tender-Providing and Laying 200 mm PVC pipes for augmenting irrigation canal water to the pond, near main pump house at CVAS Mannuthy
GENERAL Action plan 2022 23 Annual maintenance of canals Kudavattoor distributory Ch 0m to 4850m and Left Bank Main canal from Ch 26129 m to 29000 m during water distribution for the year 2023
Rectification of canal
Rectification of canal
THAZHE THALAPUZHA KURICHIYA COLONY CANAL NIRMANANAM REPAIR THALAPUZHA DIVISION
Clearing jungle and desiltating of Cherandathur distributary canal between ch 0/000 km and tailend
BSPConstruction of Peral distributary from Ch 1755m to 2045 m including CD Works
KyIP - SDRF - Urgent rectification work of Thiruvangoor distributary (7 Scheme)
KIPLBUrgent rectification work of Chavara distributary from ch9800 to 10190m.
KUNDILIDIVU CANAL ROAD SIDE PROTECTION IN AYILOOR GP
VATTOLY KUNIYUMMAL CANAL PUMP HOUSE MOTOR THAVINHAL GP
MI Class II Works Repair and Renovation of MI Structures for the year 2017-2018-Construction of Check dam across Varattayar river at Villunni in Eruthenpathy Panchayath in Palakkad District.