Loading…
Loading…
13,564 results • Best match
Annual maintenance of canal
-Urgent minor rectification works to Chooriyod Distributary between Ch. 1.230 km and 1.480 km, Pallikurupp Distributary between Ch. 5.490 km and 6.030 km, and Arakkurissi Distributary between Ch. 2.000 km and 2.500 km.
GENERAL KIP O and M Mallika Distributary from Ch 0m to 5814m Parapetty Minor Distributary from Ch 0m to 2050m and Orippuram Minor Distributary from Ch 0m to 1853m Annual Maintenance 2025 26 General Civil Work
Annual Mace of Mallika Distributary From ch 0 m to 5814 mIkkadu distributary from ch 0m 2063m Parappetty minor distributary from ch 0to2050mOripuram minor distry from ch0m 1853m and Thumpamon minor distry from ch 0 1905m
Annual Maintenance of Paranthal Distributary from Ch 0 m to 5150m and Keerukuzhi Minor Distributory from Ch 0m to 2325mKadakkadu Distributary from Ch 0m to 6919m and Poozhikkad distributary from Ch 0m to 4415mGeneral Civil Work
Side protection of works
Annual maintenance of RBMC from ch 43000m to 44015m Kodumon distributary from ch 0m to 5315m SBC from ch 0 m to 7000m Enathu 1 distributary from ch 0 m to 2950m Enathu 1A distributary from ch 0 m to 1268m Enathu 2 distributary from ch 0 m to 666
Cleaning and Deepening of canals in various wards of Mulavukad GP
377/25 Side wall for natural canals and ponds Reech 3
KRP Provision for emergency Rectification work of Branch canals of RBC
SDRF-CPP-MRBC-Rectification and Renovation of traditional anas and canal system of Korayar river in Kozhinjampara panchayath-between Angarath system originating from Angarath check dam SC colony to vaduvankulamb road cross
GENERAL_Pazhassi Irrigation Project_PyIP-Rectification work to damaged cut and cover of Mahe Branch Canal between ch_15_100km and ch_15_350km at Pattiyam_General Civil Work
CMLRRP-2024-25, Sl No. 2718,-Kinal Road (Vettumal -Anikkampoyil-Vettumal Kongatta- 6th Mile Irrigation Canal Road) tarring ,Kadirur GP, Ward -5
Pipe line extension
Refer tender document
Please refer tender document
CIVIL
Pipe Line extension
Pipe Line Works
eletrification
GENERALIlliankattukulam-Sustainable Water Conservation Project for Chittur Region by Interlinking of ponds and Traditional Storage Structures-Phase 1 Renovation of Public Ponds-Illiankattukulam at Ward 11,Chungam in Peruvembu GP of Pkd Dist.
AM 2020 21 Annual Maintenance to LIS Pallamthuruth in Lakkidi Perur panchayath
GENERAL CPP NP 2025 26 KKPS Annual maintenance to Kunnamkattupathy main canal between ch 5 000 to 10 400 Km and its 7 branch canals for the year 2025 26 General Civil Work
GENERAL CPP NP 2025 26 KKPS Annual maintenance to Kunnamkattupathy main canal between ch 19 000 to 30 600 km and its 6 branch canals for the year 2025 26 General Civil Work
GENERAL-PSM 2023-24-Monsoon Preparedness -RBMC and branch canals Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition
GENERAL CPP NP 2025 26 KKPS Annual maintenance to Kunnamkattupathy main canal between ch 0 000 to 5 000 Km and its 3 branch canals for the year 2025 26 General Civil Work
GENERAL CPP NP 2025 26 KKPS Annual maintenance to Kunnamkattupathy main canal between ch 10 400 to 19 000 Km and its 3 branch canals for the year 2025 26 General Civil Work
CPP MLBC Engaging man mazdoor labour for removing weeds waste debries and flow disturbing materials etc and sapling in the Main canal between Ch21/700 km to 24/500 and its branch canals
DEPOSIT CPP KKPS Annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of Kunnamkattupathy main canal and its branch canals for the year 2024 25 General Civil Work
G E N E R A L C P P K K P S M o n s o o n Preparedness 2026 27 Engaging Labour For Strengthening Of Canal Bunds Pruning Of Trees And Allied Works Of Various Canals Under Kunnamkattupathy Canal System- General Civil Work
Canal work
The work is proposed for the cleaning of Thekkethara, Malakkulam, Cheruvanchipadam, Anakkappara, Chelluvadi and Mudappallur branch canals before the start of second crop water distribution.
Annual Maintenance of canals action plan sanctioned works -KIP -Annual Maintenance of canals- Vazhappara trashrack in connection with water distribution for the year 2022-2023-General Civil Work
road work
Road works
KIPLBAction Plan202526 Annualmaintenance of canalsRemoval of floating materialsand other debris from canals and Cleaning of canals Kottiyambranch canalCh0 m to 10760 mPerumpuzha Punukkannoorminor and subminor Muttakkkavu distri
Formation of Badagara Mahe Canal from Ch.464.210Km to 467.690 Km- Balance work
GENERAL Rectification work KIP LB Perumpuzha Distributary Urgent rectification of Perumpuzha Distributary from Ch 910 m to Ch 1000 m General Civil Work
GENERAL-Action plan 2025-26-Annual maintenance of Oyoor Branch canal from ch 0m to ch 3320m and Vilangara Distributary for the water distribution year 2025-26-General Civil Work-1
SDP Sabarimala - M and M festival in 1198 ME- Cleaning the intake well of Kunnar Dam, Check dam and Kumbalam thodu throughout the festival season 2022-23-reg
GENERAL-work-Construction of Check dam in Poyilingapuzha near to the down stream of Silon kadavu bridge in Thiruvambady grama panchayath, Thiruvambady LAC/ Kozhikode district.-General Civil Work
Maintenance of Vandithode Check Dam in Pulpally Panchayath, Chittoor, Palakkad District -Painting and erection of 9 nos of new MS Shutters with hoisting arrangements and other connected works
Annual Plan TNDGP.2025 26PROJECT.No.11.26 CONSTRUCTION OF DRAINAGE AND SIDE PROTECTION OF KUNHOME ANGADY KARICKAL CHECK DAM ROAD MGR 5L DRAINAGE AND SIDE PROTECTION General Civil Work
SDP Sabarimala - M and M festival in 1199 ME- Cleaning the intake well of Kunnar Dam, Check dam and Kumbalam thodu throughout the festival season 2023-24-reg
GENERAL-DESILTING -Removing wastes cleaning blocks and desiltation of Ayiroor river on the left bank D/S OF check dam near Elakamon Panchayath Reach-2-General Civil Work
GENERAL-DESILTING -Removing wastes cleaning blocks and desiltation of Ayiroor river on the left bank D/S OF check dam near Elakamon Panchayath Reach-1-General Civil Work
Urgent Rectification works for canals
Kumbalanghy G P Cleaning Rennovation of various drains canals of ward-3-3/ 23 Kumbalanghy G P Cleaning Rennovation of various drains canals of ward3-General Civil Work
KIPO M Sasthamcotta branch canal cross shutter atCh 20550m for the Muthupilakkadu minor distributar
GENERAL Mahe Branch Canal PyIP Clearing jungle in Mahe Branch Canal between Ch 0.000 Km and 16.600 Km and 19.700 Km and 23.034 Km for the year 2023. 24 General Civil Work