Loading…
Loading…
13,566 results • Best match
Annual Plan-Project 139/23-24-Cleaning of canals within municipality Pazhaveedu wardW-12-General Civil Work
ALAPPUZHA MUNICIPALITY- 155 22- CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY- (PANIKKANPARAMBU THODU AND KAYALILCHIRA) IN MULLACKAL WARD.
GENERALCPPMRBCMonsoon Preparedness2026 27Cleaning of Angarath, Paruammanchalla Kozhinjampara Valiyavallampathy Branch canals and removal of water blockageGeneral Civil Work
flood 2021 removal slipped earth small trees vegetation etc from the branch canals under channel section pallichal
GENERAL-CPP-NP-2026-27-MLBC Engaging man mazdoor Ch 21700 to 24500 and its branch canals
GENERAL ES ANNUAL ACTION PLAN 2022 23 MP LBC Annual maintenance of Kurissi Pampadi canal between ch .22.500km to 25.000km for 2022. 23 General
Removing the plastic waste, floating waste, accumulating near the bridge abutments, net, shutters etc. in Aluva branch canal and its SBCs and MDs Through out Water distribution.
RELIS Branch canal Branch canal construction to Adicheri Virippu Vayal in Malapattam Panchayath General Civil Work
huge quantity of floating bodies such as slaughter waste, dead animal bodies, dry leaves, small branches of trees plantain stems plastic bottles domestic waste and plastic waste flow through the canal. These floating
MP LADS 2024 25 Sri Elamaram Kareem Hon MP RS Installation of High Mast Light at Kuttiyadi irrigation Project Canal road in ward 6 Koothali Grama Panchayath General Electrical Work
Annual Plan-Kissan Nagar-Annual plan 2026 27 Ayyanthole zonal Division 55 Thodu cleaning From Kissan nagar Mangattu thodu to Irrigation canal white field thodu Reach 3 General Civil Work
GENERAL-CSM- 2023-24-Annual maintenance of LBMC B/W ch 22/950km to 25/000km including clearing and silt removal of Killimangalam, Pynkulam and Panjal branch canal -General Civil Work
PyIP-Rectification of shutters in Main canal between chainage 15-200km and chainage 42-000km for the year 2021-2022
GENERAL KPIP AM 2025 26 Jungle clearance Silt removal and canal cleaning works for Ottappalam distributary and its minor distributaries including water distribution of all distributaries between ch 42/000 km to 52/000 km for the year 2025 26
Annual Maintenance of RBMC from ch 44015m to 52105m Pandalam branch Canal from ch 0m to 1548m and its 6 minors Paranthal Distributary From ch 0 m to 5150 M and Keerukuzhi minor distributory from ch 0 mto 2325m Poozhikkadu
GENERAL WP CSP NP 2025 2026 Rectification works of the Field channel offtakes from ch 12 036 km RHS of No 3 Distributary canal PezhumkadKaringarapully Field channel in between ch0 00 to 0 060 km 1086 2026 General Civil Work
Th i s w o r k i s p r o p o s e d f o r t h e rehabilitation of the existing lift canal system under Prayar Lift Irrigation scheme.
Road Concreting
DESILTING OF RIVER
CC WALL
GNRL Action Plan 2024 25 KIP LB Annual maintenance of canals removal of floating materials and other debris from canals under the jurisdiction of section 28 19 Kottiyam in connection with water distribution during the year 2024 25 Gnrl Civil wrk
GEN KIP LB Annual maintenance of canals Removal of floating materials from canals manning and operation of LI pumps Chirakkara under the jurisdiction of section 30 19 Kottiyam in connection with water distribution during the year 24 25 Gen civ work
CANAL CONSTRUCTION
155/22 CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY-MENITHARA-KARALAKOM PADAM THODU, MENITHARA AASSARI TEMPLE THODU IN KOTTAMKULANGARA WARD
Canal work
canal work
Canal work
Checkdam construction
Main Canal Rectification and Restoration of damaged canal lining
Annual Plan-Project 139/23-24-Cleaning of canals within municipality Nehru Trophy wardW-7-General Civil Work
CPP-Nurnee System-Improvements and rectification of Nurnee main canal near Ch.6/100
BSP Construction of Venniyode Distributary from Ch 0m to Ch 120m including CD works
Annual Maintenance of Canals
Civil works
Restoration of public tap pazhassi canal road in div 24 Elayavoor zonal
GENERAL-KIP(LB)-Repairs to shutter at Attuvassery Distributary offtake shutter CH 16150m of KBC- General Mechanical Work
Action Plan 2024 25 KIP LB Cleaning of canals Kottiyam branch canal Ch 0m to 10760 m Perumpuzha disy Punukkannoor minor and subminor disy for ensuring smooth flow of water prior to water distribtion for the year 2024 25 under KIP LB sn 28/19
G E N E R A L M a n g a l a m P r o j e c t D i s t r i c t Panchayath Deposit work 2025 26 Canal cleaning in distributaries and cada canals under CS VDY
KYIP Mambrachalil canal palam in kallur branch canal
EngagingLabours for smooth flow of water during distribution in canals under section 2 Perambra
The work is to demolish the existing CC canal and construct RCC canal side wall and provide cover slab over the LI canal
Annual Maintenance of Canals
Annual Maintenance of Canals
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation canal