Loading…
Loading…
13,585 results • Best match
GENERAL PIP Annual maintenance 2024 25 Cleaning and clearing obstructions from the canals in Alappuzha district during water distribution PIP S9 AM 2024 25 General Civil Work
GENERAL- GPS-II-ACTION PLAN 2023-24- Urgent Repairs and amp, Maintenance of shutters in Nandankizhaya and amp, kizhakkethara branches canals of Chulliyar Dam - General Mechanical Work
Proj No - 64/25 - Pookkottumanna Irrigation Road in Ward No - 03
District Panchayath Scheme--2021-22-----Providing irrigation facilities for SSF Aluva
Providing Irrigation Facilities to Kuppadi Poolavayal Padasekhara Samithy in Sulthan Bathery
GENERAL-Irrigation Division Kollam-Renovation of Electrical Installation-General Electrical Work
Project No 162 MECHAL MELMUDIKKUNNU IRRIGATION PROJECT COMPLETION IN WARD 3
MLASDF Side Protection Wall for DWSS Metranchery Irrigation Beneficiary Committee Ayarkunnam
THIRUVEGAPPURA GP 2025-26 PUTHUVAYIL IRRIGATION ROAD-PRO.NO.59/25-26
Improving irrigation facilities to vydyankavu thamarabhagam ela thode in Maanickal panchayath
PM Improvements of irrigation facilities to Mahatma padasekharam in Perayam Panchayath
Quality Control Section Office Irrigation Dept Kollam Electrification of Lab Building
Canal lining
canal protection
canal maintenance
Canal work
Canal protection
Side protection and canal lining
In Mankurussi branch canal b/w 0/350 km to 0/400 km the bund height is inadequate to carry the full supply of canal during water distribution and during the monsoon flow in the canal. The water flows over the bund a
This work has been included under the action plan 2025-26 of The Malampuzha project. Due to heavy rain during monsoon many of the trees in canal bunds and camp area have uprooted and some are on the verge of falling down. Complaints have been
This work has been included under the action plan 2024-25 of The Malampuzha project. Due to heavy rain during monsoon many of the trees in canal bunds and camp area have uprooted and some are on the verge of falling down. Complaints have been
Mankara branch canals Side walls-Cut and cover Portion- were damaged during the 2023- 2024 Water Distribution for the second crop period and the well at 6/000 km of Mankara branch canal were blocked. The block was removed and water distribution
Construction of Pond and Tank,Installation of pumpset, laying pipe line and providing micro sprinkler
Clearing Jungle Earthwork Surface Dressing etc
Clearing jungle Earth work excavation Concrete ete
Clearing jungle cement concrete earth work etc
Clearing jungle demolishing pointing etc
Improvement works to irrigation structures
Maintenance of canal
Deepening of Canal
rectification of canal
MIRPA-Providing canal lining to the main canal and urgent side protection of LI Scheme Moothikkayam from ch,0/263m to 0/600m in Moorkanad Panchayath,Malappuram Dt.
Rectification works to the damaged canal bed and side lining
GENERAL-NAVAKERALA SADASSUPETITIONS-2023-24-Cleaning and De siltation of Care Irrigation project in Muthuthala panchayath of Palakkd district-General Civil Work
Side protection
mlasdf 2021-2022- Pappanavelilpadi -Canal Road in ward 13,Kutoor Gramapanchayath
Rectification of main canal of kandampuzha relift scheme in Varapetty panchayath
MARADY GP-129/22-PULIYANIKKATTUTHAZHAM CANAL BUND ROAD MAINTEN WARD-2
CSIND- Desilting of canal near Mariakkallu boat jetty, in Thiruvarpu panchayath
GENERAL-AM 2025-26 Anamooli SchemeAnnual maintanance works to Anamooli MI Class 1 Canal diversion scheme Anamooli RB Canal near Ch 0/300 and Thenkara Branch canal near Ch 0/150 in Thenkara GP-General Civil Work
GENERAL MP LBC KS URGENT BRANCH CANAL CLEANING WORKS 2022 MP LBC Urgent canal cleaning works of Pallavur branch canal from ch 0000km to 5550km for 2nd2022 23 and Ist crop2023 24 water distribution. General Civil Work
IIP-Main canal water distribution during 2025-26 engaging labour for watching canal and for clearing obstructions between ch 16360 - 28800
Rectification works to main canal
Rectification woks to main canal
KPIP Canal Koorikkunnu Road Tarring
Investigation of Padinjareveedu Branch Canal
CHIKKOOS FURNITURE CANAL BUND ROAD
GENERAL-PWD COMPLEX--Toilet repair works in Irrigation division office Kannur- General Civil Work
DEPOSIT-Canal Cleaning Works 2024-2025- MP-LBC-PS-Annual Maintenanace of Tasrak Branch Canal for the Year 2024-2025-General Civil Work
Manjapra GP Pro No 160 Karingalikkadu Anganawadi canal bund road maintenance Karingalikkadu PWD canal bund sub road Karingalikkadu Ayyunnipadam subroad maintenance ward 8