Loading…
Loading…
13,585 results • Best match
Rectification of canal
Rectification of canal
Rectification of canal
REPAIR OF CANAL
Rectification of canal
Canal rectification work
maintenance of canal
rEPAIR OF CANAL
Canal work
canal work
canal works
canal work
canal work
canal work
canal works
Construction of irrigation pond
Rectify the damaged canal lining
Rectification works of branch canal
The work of desilting of canal is essential forsmooth conveyance of water through the RBC main canals to the paddy fields. This work includes clearing of jungle on the canal and canal bunds and desilting of canal system.
GENERAL Annual Maintenance Contracts 2023 24, of various LI Schemes under Electrical Wing Minor Irrigation section Kalady Maintenance of Transformers, HT Structures and Equipments of HT Schemes HT Electrical Work
GENERAL WP Annual maintenance for 2024 2025 clearing and removing grass jungle and silt for Koundan canal 0 000km to tail end including Attappallam branch canal and chullimada branch canal upto tail end and field channel
Annual maintenance of canal
Annual maintenance of canal
KRP Facilitating water distribution through Kolliyil branch canal KRP Facilitating water distribution through Kolliyil branch canal for the year 2024 25 and allied works
PIP-LBC-Annual maintenance- Peruvelichal distributary Canal from Ch. 0m to 7000 m for the year 2022-23
DEPOSIT KIP RB Thevalakkara GP Construction of parking area near Panchayath Office near Ch 2164 m of Thevalakkara Minor distributary General Civil Work
MVIP-Anicad MD-Rectification of damaged lining between Ch.0m-35m ,1050m-1330m , 1595m-1795m ,1845m-2000m and 2155m-2225m of Anicad Distributary
LAC ADS KIP LB Construction of Culvert at Ch 14300m of Paravoor distributary near Chirakkara market in Chirakkara Grama Panchayath General Civil Work
KPIP Monsoon preparedness Removal of excess earth between Ch 1/500 to 2/000 km of Karakurussi distributary for the year 2022 2023
KIP LB Clearing jungle of Adichanalloor distributary in connection with water distribution for the year 2022 23 under the section 29 19 Kottiyam
GENERAL KIP RB Urgent Rectification works to arrest heavy seepage near Ch 150m amp Ch 1500m of Chamavila Minor Distributary General Civil Work
GENERAL 2025 26 KIP O and M Urgent rectification works in Edakkadu 1 Distributary between 1100 m to 1350 m General Civil Work
GENERAl Mangalam Project Dam Section Action Plan 2026 27Improvement of Chittilamchery distributary of RBC between Ch 0 950 km to 1 050 km
GENERAL Edakkad branch canal PYIP Providing lining in Edakkad Branch Canal in between Ch 0 400km and ch 0 600km at Kannadivelicham for the year 2023 24 General Civil Work
rectification work of Kurumassery main canal
Annual Plan-Sreekrishnapuram GP 2023 24 Kuttichathankav Canal road tarring W4 pro 214 General Civil Work
Annual maintenance of canal from ch.12000m to 16360m
PIP RBC Rectification works to Main Canal between ch 19400 m to 19530 m
PIP-LBC- Rectification works to LB canal from ch. 36100 m. to 36300 m.
2021-2022 Kolazhy Gramapanchayath Maintenance of Doctorpadi canal Road in ward 7 51/22
Rectification works to prevent leakage of canal lining between Ch. 5.400 km and Ch. 5.467 km of Thamarachalpuram sub branch canal
Rectification works to prevent leakage of canal lining between Ch 2.700 km and Ch 2.770 km of Ezhipram sub branch canal
LAC ADS KIP LB Main Canal Construction of Bridge Across LB main Canal at Ch 46250m Idakkidom Vedar Colony in Ezhukone Grama Panchayath General Civil Work 1
KIIFB 2016 17 WSS to Kalluvathukkal,Parippally and Velinalloor Part Phase II Package V Reforming the semi permanent check dam to a permanent check dam to increase the storage capacity across Ithikkara river DS of Aduthala Bridge.
Rectification of Main Canal
Canal breach rectification works
The estimate is prepared for cutting trees and branches causing danger along the bunds of main canal 20/000 Km to 32/000 Km , kinavallur, Thenur, Mankurussi, Mankara, Pathirippala, palappuram branch canals
To clear the obstructions from canal in the area from Ch.0 m to 14000 m of Right Bank Main Canal before water distribution. Canal clearance is very essential for water distribution.
Concrete leading channel