Providing Power Supply to New HT Connection The EE KOLAR (C/DN) NGANJ for Lift Irrigation scheme purpase CD of 440 KVA on 33 KV at vill Kakariya under (O and M) Dn. Budni
Earthwork of Luhariya, Pipalthone, Gajanpur, Chobora and Rajora Direct distributary.
Repairing and Reconditioning work of Minor Canal Gate at Minor-BM2 (gate size 300x300 at RD 1200 m ), Minor-BM4( Gate size 300x300 at RD 4000m, No. of gate 2) Minor of DM-33 OSP Canal Gate at Mandleshwar Distt-Khargone
Annual Repair and Maintenance and Patrolling work of Math Math Branch Canal, Pattharpada and Tail Distributary Canal of Mahi Main Dam Tehsil Petlawad, District Jhabua M P IInd Call
FOR THE WORK OF REPAIR OF HEAD AND CROSS REGULATOR GATE OF AMODA DISTRIBUTARY CANAL RD. 0.00 KM. TO RD. 23.61 KM. OF LEFT BANK CANAL OF R.A.B.L.S PROJECT
Extension and heightening of Check dam and other miscellaneous work at Tawa-II UG Mine of Pathakhera Area
Earth Work, Lining and Concrete Work of Dhulakhedi, Kundal Sub Minor, Pathharpada Distributary, Minor of Tail Distributary and Math Math Branch Canal of L.B.C. of Mahi Main Dam Tehsil Petlawad, District Jhabua Madhya Pradesh
Shifting with Height Raising of 11 KV and LT Line affected by Canal and Sub Canal (Signa Barkheri Canal) of Perkul Medium Irrigation Dam District Sagar (M.P.)
Shifting with Height Raising of 11 KV and LT Line affected by Canal and Sub Canal (Pipriya Madkhera Canal) of Perkul Medium Irrigation Dam District Sagar (M.P.)
Operation and Maintenance for 02 years of Harsud Micro Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 5648 ha on Turn-key basis as per detailed scope of work.
Providing Power Supply to New HT Connection The EE KOLAR (C/DN) NGANJ for Lift Irrigation scheme purpase CD of 440 KVA on 33 KV at vill Ratanpur Bori under (O and M) Dn. Budni
Operation and Maintenance for 02 years of Harsud Micro Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 5648 ha on Turn-key basis as per details scope of work.
Operation and maintenance of V.T. Pumps, Centrifugal pumps with motors and 33/6.6, 33/3.3, 33/0.415 K.V. Sub-Station installed at Kathora Lift Irrigation Scheme, Stage- I, II, III, and IV for five years
Construction of 132 KV DCSS Line of 21.243 Km. from 132 KV Substation Malhargarh for power supply to Pressurized Micro Lift Irrigation Project and 01 No. 132 KV Feeder bay at 132 KV Substation Malhargarh
Supply, Erection, Testing, Commissioning and Energization of 33 KV HT Dedicated Line and allied electrical infrastructure for providing permanent power supply connection of 1000 KVA Load for Jamoniya Lift Irrigation Scheme (LIS), including all access
Supply, Erection, Testing, Commissioning and Energization of 33 KV HT Dedicated Line and allied electrical infrastructure for providing permanent power supply connection of 800 KVA Load for Chatarkota lift Irrigation Scheme (LIS), including all acces
Repair Work of 20 No. Canal Gates of RANGUWA Irrigation Project, District Chhatarpur (M.P.)
Repair and maintenance of canal gates at various locations under Kaliyasot Irrigation project, Bhopal.
Patrolling work of Mahi Right Bank Canal and Tail Distributary of Mahi Subsidiary Dam Kalikarai Tehsil Sardarpur District Dhar Madhya Pradesh
Repairing and Reconditioning work of Manawar Distributary Minor Gates (M17, M18) of R.B.C. Main Canal at Jeerabad Distt-Dhar (2nd Call)
Repairing and Reconditioning work of Panwa Distributary Cross Regulator Gate of Rm5 of R.B.C. Main Canal at Jeerabad Distt-Dhar (M.P.)
FOR THE WORK REPAIR AND MAINTENANCE OF H.R. GATE OF BHADGAWA BRANCH CANAL (O/T R.D. 93.98 KM OF LBC) AND BAMHNI DISTRIBUTARY CANAL (O/T R.D. 7.66 KM OF BHADGAWA BRANCH CANAL) OF L.B.C. R.A.B.L.S PROJECT.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF BHADGAWA BRANCH CANAL (O/T RD 93.98 KM OF LBC) AND BAMHNI DISTRIBUTARY CANAL (O/T R.D. 7.66 KM OF BHADGAWA BRANCH CANAL) OF L.B.C. R.A.B.L.S PROJECT.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF RENUKA DISTRIBUTARY CANAL (O/T RD.0.18 KM. OF SADUMAR BRANCH CANAL) AT RD. 0.00 KM. TO R.D 14.097 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF AMODA DISTRIBUTARY CANAL (O/T RD.9.60 KM. OF SADUMAR BRANCH CANAL) AT RD. 0.00 KM. TO R.D 23.61 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
Repairing of CR and ER canal gates of Morena Branch Canal Morena
Resectioning work of Chhatera minor of Behrai Distributary and Barbaspur minor of Wainganga main canal System.
On Turnkey Basis Construction of Surajpura Medium Project Canal system including of main and minor Canals earthwork and canal Structure i/c lining of minor and mionr canal Project. as per detailed scope of work but not limited to that.
Construction of Upper Narmada Project on Narmada River on Turnkey Basis including construction of dam and 45600 Ha. CCA pressurized pipes micro irrigation system upto 2.5 Ha. Chak of 0.35 lps/ha. as per detail scope of work.
Repairing and Reconditioning work of Minor Canal Gate at Minor-BM1 (gate size 300x300 at RD 700 m ), Minor-BM3( Gate size 300x300 at RD 2800m, No. of gate 2) Minor of DM-33 OSP Canal Gate at Mandleshwar Distt-Khargone (M.P.)
Solar light, Solar borewell pump, Drip irrigation system, Cast Iron Bench, Dustbin
Construction of 2nd circuiting of 132 kV DCSS Handia (220 kV) - Satwas line in association with Indira Sagar Project (ISP) for Micro Lift Irrigation scheme of Narmada Development Division- 25. Distt. Dewas Under Consumer Contribution Works
Operation and Maintenance for 02 years of GROUP SCHEME Micro Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 17195 ha on Turn-key basis as per detailed scope of work.
Jungle clearance and silt Removal at Ch. 0 to 320 Singola Distry. of Bagh RBC Main Canal System Distt. Balaghat
Work of Sluice Well Repair and Jacketing, Waste weir Protection wall work, Earthwork in Main Dam, Main and minor Canal Lining, Construction of VRB repairing of existing structures of Indla Tank Project.
Repair work of Dhanela Lift Irrigation Scheme
Earth Work Filling above Under Ground Pipe Line Canal From R.D. 2010 M To 2340 M of Kharsaniya Distributary of Kolar Project.
Electrical and Mechanical Work of Canal Gates of Pawai Medium Irrigation Project. District Panna (M.P.)
Supply of Abiyana stationary for various Sub Division of Datia Irrigation Canal Division Datia (M.P.)
Repair Work of 20 No. Canal Gates of Urmil RBC Irrigation Project, District Chhatarpur (M.P.)
REPAIR AND MAINTENANCE WORK OF 25 NOS. CANAL GATES OF SUKTA IRRIGATION PROJECT DISTRICT KHANDWA.
Jungle clearance and providing of semi skilled labour for canal regulation during Kharif and Rabi irrigation period including gate operations and canal inspection of Right Bank Main Canal, Majholi Branch Canal and its distribution system.
Operation and Maintenance for 01 years of GROUP SCHEME (KILLOD, PAMAKHEDI, BHURLAI, KODWAR AND PUNASA - EXTENSION) Micro Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 17195 ha on Turn-key basis
Repair maintenance and painting of 20 canal gates of 7 minor irrigation tanks under Bhainsdehi District Betul
Construction of check dam to collect and prevent entry of sediments into Gunnor river, at Nehariya under Nehariya Sub-Area.
Check Dam and R.C.C. drain from PR siding railway bridge no.4 to bridge no. 2 at Block - B Project.
Construction of Balance work of earth work of main canal from RD 0 m to 2088 m and minors canals, cast in situ CC lining canal structures including pipe out lets of Parkul Medium Project.
Detailed survey work of head and canal work of Mahendra Irrigation Tank Project.in Tehsil C.S. Azad Nagar Dist.Alirajpur (M.P.)
Earth Work and removing of slipped earth of 8 no. of distributary and its minors of Machha Sub Division and Dokrikheda Canal System.
Survey work Patan Minor Irrigation Tank Scheme